Tender For Construction Of P.R.B. At Km. 4.420 Of Salarpur Minor - Scraping old painted surface including disposal of all scrapped material by mechanical means including all cost of material, labour, T&P etc. as per directed by engineer in charge for proper completion of work. 2 Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth as per site requirement and with removal and proper disposal of surplus earth including all cost of material, labour, T&P etc. as per directed by engineer-in-charge for proper completion of work. 3 Cement Concrete in (1:2:4) M15 mix with Cement, Coarse Sand (F.M. not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc.as per directed by engineer in charge completefor proper completion of work. 4 Cement Concrete in (1:1.5:3) M20 mix with Cement, Coarse Sand (F.M. not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc.as per directed by engineer in charge completefor proper completion of work. 5 Providing and fixing Centering & shuttering in Straight Portion of C.C. work including cost of all material, labour, T&P, all lifts and leads, etc complete for proper completion of work as per directed by engineer in charge . 6 Providing and fixing Centering & shuttering in Straight Portion of R.C.C. work including cost of all material, labour, T&P, all lifts and leads, etc complete for proper completion of work as per directed by engineer in charge . 7 Reinforced Cement Concrete in (1:1:2) M25 mix with Cement, Coarse Sand (F.M. not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc. complete for proper completion of work as per directed by engineer in charge. 8 Brick work in mud mortar including cost ofall mterials, labour and T&P for proper complition of work in super structure up to1.50 mtr height. 9 Providing & Fixing 20mm thick Expansion Joint with angle iron both side & M.S. plate carring & filling of filler material of bitumin soil dust & Coarse Sand (F.M. Not less than 2.00),etc complete for proper completion of work. 10 Providing & Fixing steel Angle 65 x 65 x 8 mm at vertical joints edge including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. 11 Providing & Fixing of 100 mm dia PVC Pipe for cables etc. in crash barrier and parapets in position including cost of all mterial, labour and T&P for proper complition of work. 12 Cutting, Bending, Binding & Placing in position ofsteel reinforcement (above10mm Dia) with all wastage, carriage and including all labour material and T&P etc complete for proper completion of work for proper completion of work as per directed by engineer in charge. 13 Cutting, Bending, Binding & Placing in position of steel reinforcement (up to10mm Dia) with all wastage, carriage and including all labour material and T&P etc complete for proper completion of work for proper completion of work as per directed by engineer in charge. 14 Provide & Laying Boulder 20.00 to 40.00 kg.wt in bed & sides with all lead and liftincluding cost all labour, T&P material etc complete for proper completion of work as per direction of Engineer - in charge. 15 Provide & Fixing PVC waterstop seal for expantion/ construction jointincluding all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. 16 Earth work in Filling in embankment in ordinary soil exvacation to be in the form of regular pits and earth work in embankment to be in 20cm layers including ramming and dressing the surface to be required levels and slopes and also includingall lift and Lead upto 600m distance including cost of all Labour T&P etc complete as directed by Engineer-in- charge. 17 Supplying & laying of RBM on diverson including all lead lift, compaction, dressing as required for proper completion of workincluding all costlabour, material and T&P etc. completeor as Directed By Engineer in Charge. 18 Supply and Fixing 75mm Dia PVC Pipe for drainage sqouts. Including cost of all material T&P, labours etcfor proper completion of work as per directed by engineer in charge. 19 Supply and Fixing wheel Guard stone (Size 150mmx150mmx1500mm)for proper completion of work as per directed by engineer in charge. 20 Providing and Fixing of year Platefor proper completion of work as per directed by engineer in charge. 21 Providing and fixing of B.M Platefor proper completion of work as per directed by engineer in charge. 22 Providing & Fixing sign caution board in position including cost of all mterial, labour and T&P for proper complition of work.