| 1 | Cost of drilling 200×165×125mm deep bore well in all kinds of soil and rock in rural area for installation of pump set with hydraulic D.T.H rig machine all complete including supplying all materials, tools, drilling rig air compressor and equipment as well as fuel laboricants and cost of transportation of rig machine and other vehicles upto the site |
| 2 | Cost of drilling 200×165×125mm deep bore well in all kinds of soil and rock in rural area for installation of pump set with hydraulic D.T.H rig machine all complete including supplying all materials, tools, drilling rig air compressor and equipment as well as fuel laboricants and cost of transportation of rig machine and other vehicles upto the site |
| 3 | Supplying all tols tackles & lowering of 200mm mm dia MS ERW Casing pipe of 6mm wall thickness including all rges with inspection chaeges etc as applicable etc all complete job taxes, VAT, Excise duty, freight charges |
| 4 | Supplying all material, labour & equipment of fittting 200mm dia m.s cap cover casing pipe all complete job |
| 5 | Supplying, flat flexible submersible cable with copper M1062 conductor PVC insuleted & PVC sheathed as per IS:7098 |
| 6 | s/F/F MAKE 1.5 hp submersible pump 150 mm dia |
| 7 | S/F/F fully automatic star delta stater to oprate induction motor working o 415 volt 3 phase 50hz with novold cole over load ,,, |
| 8 | S/F/F GI pipe of tata or equipment mark of 40 mm dia |
| 9 | EARTHWORK IN EXCAVATION IN FOUNDATION TRENCHESIN ORDINARY SOIL ( VIDE CLASSIFICATION OF SOIL ITEM _ A ) AND DISPOSAL OF EXCAVATED EARTH AS ABTAINED TO A DISTANCE UPTO 50 M. INCLUDING ALL LIFTS, LEVELLING, RAMMING THE FOUNDATION TRENCHES , REMOVING ROOTS OF TREES, SHURBS ALL COMPLETE AS PER APPROVED DESIGN . BUILDING SPECIFICATION AND DIRECTION OF E/I OREXTRA OF EARTHWORK IN HARD SOIL AS PER SPECIFICATIONAND DIRECTION OF ( VIDE CLASSIFICATION OF SOIL ITEM _ B) |
| 10 | PROVIDING COARSE CLEAN SAND IN FILLING IN FOUNDATION TRENCHES OR IN PLINTH INCLUDING RAMMING AND WATERING IN LAYERS NOT EXCEEDING 150MM THICK WITH ALL LEADS AND LIFTS INCLUDING COST OF ALL MATERIALS , LABOUR , ROYALTY AND TAXES ALL COMPLETE AS PER BUILDING SPECIFICATION AND DIRECTION OF E/I (MODE OF MEASUREMENT COMPLETED VOLUME ) |
| 11 | PROVIDING 75A ONE BRICK FLAT SOLING IN FOUNDATION AND PLINTH DO….DO……. ALL COMPLETE JOB.. COLUMN |
| 12 | PROVIDING P.C.C.M 150 IN NOMINAL MIX OF (1:2:4) IN FOUNDATION WITH APPROVED QUALITY OF STONE -----DO ------ |
| 13 | REINFORCED CEMENT CONCRETE WORK IN WALLS. (ANY THICKNESS) INCLUDING ATTACHED PILASTERS, BUTTERSSES ,PLINTH AND STRING COURSES ,FILLETS, COLUMNS, PILLARS ,PIERS, ABUTMENTS , POSTS, AND STRUTS ETC ABOUT PLINTH LEVEL UP TO FLOOR FIVE LEVEL EXCLUDING COST OF CENTRING SHUTTERING FINISHING AND REINFORCEMENT |
| 14 | REINFORCED CEMENT CONCRETE WROK IN BEAMS,SUSPENDED FLOORS , ROOFS HAVING SLOPE UP TO 15* LANDINGS , BALCONIES , SHELVES CHAJJAS ,LINTELS BANDS PLAIN WINDOW SILLS , STAIRCASES AND SPIRAL STAIR CASES ABOVE PLINTH LEVEL UP TO FLOOR FIVE LEVEL , ESCLUDING THE COST OF CENTERING , SHUTTERINGS FINISHING AND REINFORCEMENT WITH (1:1.5:3) |
| 15 | REINFORCED CEMENT CONCRETE WROK IN BEAMS,SUSPENDED FLOORS , ROOFS HAVING SLOPE UP TO 15* LANDINGS , BALCONIES , SHELVES CHAJJAS ,LINTELS BANDS PLAIN WINDOW SILLS , STAIRCASES AND SPIRAL STAIR CASES ABOVE PLINTH LEVEL UP TO FLOOR FIVE LEVEL , ESCLUDING THE COST OF CENTERING , SHUTTERINGS FINISHING AND REINFORCEMENT WITH (1:1.5:3) |
| 16 | PROVIDING DESIGNATION 75A BRICK WORK IN C.M. (1:6) IN FOUNDATION AND PLINTH LEVEL - DO - |
| 17 | REINFORCED CEMENT CONCRETE WROK IN BEAMS,SUSPENDED FLOORS , ROOFS HAVING SLOPE UP TO 15* LANDINGS , BALCONIES , SHELVES CHAJJAS ,LINTELS BANDS PLAIN WINDOW SILLS , STAIRCASES AND SPIRAL STAIR CASES ABOVE PLINTH LEVEL UP TO FLOOR FIVE LEVEL , ESCLUDING THE COST OF CENTERING , SHUTTERINGS FINISHING AND REINFORCEMENT WITH (1:1.5:3) |
| 18 | REINFORCED CEMENT CONCRETE WROK IN BEAMS,SUSPENDED FLOORS , ROOFS HAVING SLOPE UP TO 15* LANDINGS , BALCONIES , SHELVES CHAJJAS ,LINTELS BANDS PLAIN WINDOW SILLS , STAIRCASES AND SPIRAL STAIR CASES ABOVE PLINTH LEVEL UP TO FLOOR FIVE LEVEL , ESCLUDING THE COST OF CENTERING , SHUTTERINGS FINISHING AND REINFORCEMENT WITH (1:1.5:3) |
| 19 | REINFORCED CEMENT CONCRETE WROK IN BEAMS,SUSPENDED FLOORS , ROOFS HAVING SLOPE UP TO 15* LANDINGS , BALCONIES , SHELVES CHAJJAS ,LINTELS BANDS PLAIN WINDOW SILLS , STAIRCASES AND SPIRAL STAIR CASES ABOVE PLINTH LEVEL UP TO FLOOR FIVE LEVEL , ESCLUDING THE COST OF CENTERING , SHUTTERINGS FINISHING AND REINFORCEMENT WITH (1:1.5:3) |
| 20 | REINFORCED CEMENT CONCRETE WROK IN BEAMS,SUSPENDED FLOORS , ROOFS HAVING SLOPE UP TO 15* LANDINGS , BALCONIES , SHELVES CHAJJAS ,LINTELS BANDS PLAIN WINDOW SILLS , STAIRCASES AND SPIRAL STAIR CASES ABOVE PLINTH LEVEL UP TO FLOOR FIVE LEVEL , ESCLUDING THE COST OF CENTERING , SHUTTERINGS FINISHING AND REINFORCEMENT WITH (1:1.5:3) |
| 21 | REINFORCED CEMENT CONCRETE WROK IN BEAMS,SUSPENDED FLOORS , ROOFS HAVING SLOPE UP TO 15* LANDINGS , BALCONIES , SHELVES CHAJJAS ,LINTELS BANDS PLAIN WINDOW SILLS , STAIRCASES AND SPIRAL STAIR CASES ABOVE PLINTH LEVEL UP TO FLOOR FIVE LEVEL , ESCLUDING THE COST OF CENTERING , SHUTTERINGS FINISHING AND REINFORCEMENT WITH (1:1.5:3) |
| 22 | REINFORCED CEMENT CONCRETE WROK IN BEAMS,SUSPENDED FLOORS , ROOFS HAVING SLOPE UP TO 15* LANDINGS , BALCONIES , SHELVES CHAJJAS ,LINTELS BANDS PLAIN WINDOW SILLS , STAIRCASES AND SPIRAL STAIR CASES ABOVE PLINTH LEVEL UP TO FLOOR FIVE LEVEL , ESCLUDING THE COST OF CENTERING , SHUTTERINGS FINISHING AND REINFORCEMENT WITH (1:1.5:3) |
| 23 | PROVIDING 12MM THICK WATER PROF CEMENT PLASTER (1:3) WITH 5 % CICO DO … …… DO……… ALL COMPLETE JOBPUMP HOUSE |
| 24 | PROVIDING 12MM THICK WATER PROF CEMENT PLASTER (1:3) WITH 1.5MM CEMENT PUNING INCLUDING CURING CARRIAGE OF WATER WITH ALL LEADS AND LIFTS AS PER BUILDING SPECIFICATION AND DIRECTION - DO - |
| 25 | PROVIDING TOR STEEL REINFORCEMENT OF 10MM , 12MM, 16MM DIA BARSAS PER APPROVED DESIGN AND DRAWINGDO………….ALL COMPLETE JOB FOUNDATION |
| 26 | SUPPLYING FITTING AND FIXING 20 GUAGE G.C.I SEAT GATE FITTED ON MS ANGLE FRAME OF SIZE 60x60x6MM INCLUDING COST OF FIBRECATION PROVIDING NECESSARY LOCKING ARRANGEMENT WITH HOSKAL AND DOMINY DULY FIXED IN PCC (1:2:4) BLOCK OF REQUIRED SIZE , APPLYING A PRIMING RED LEAD PAINT OVER STEEL WORK , TAXES ALL COMPLETE AS PER DRAWING SPECIFICATION AND DIRECTION OF E/I |
| 27 | SUPPLYING FITTING AND FIXING MS GRILL GATE WITH MS GRILL MADE OF 20x6MM MS FLATS OR 16 MM MS SQUARE BARS FITTED ON 25x25x6MM MS ANGLE FRAME |
| 28 | PROVIDING 12 MM CEMENT PLASTER WITH CLEAN COURSE SAND OF F.M 1.5 INCLUDING SCREENING CURING WITH ALL LEADS AND LIFTSOF WATER SCAFFOLDING TAXES ANDROID ALL COMPLETE AS PER BUILDING SPECIFICATION AND DIRECTION OF E/ I WITH 1.5MM CEMENT PUNING INCLUDING CURING CARRIAGE OF WATER WITH ALL LEADS AND LIFTS AS PER BUILDING SPECIFICATION AND DIRECTION - DO - |
| 29 | PROVIDING 6 MM CEMENT PLASTER(1:4) IN CELLINGWITH CLEAN COURSE SAND OF F.M 1.5 |
| 30 | PROVIDING 12 MM CEMENT PLASTER (1:6) WITH CLEAN COURSE SAND OF F.M 1.5 |
| 31 | PROVIDING TO COAT OF SNOWCEM OF APPROVED SHADE AND MAKE OVER A COAT OF CEMENT PRIMER ON NEW SURFACE INCLUDING PREPAIRING THE PLASTEREDSURFACE SMOOTH WITH SANDPAPER SCAFFOLDING CURING AND TEXAS ALL COMPLETE AS PER BUILDING SPECIFICATION AND DIRECTION OF E/I |
| 32 | EXTRA FOR EACH COAT OF CEMENT WASH, DISTEMPER , PANT OP SNOWSEEMOVER EXTERIOR SURFACE FOR EACH CONSECUTIVE FLOOR ABOVE FIRST FLOOR INCLUDING SPECIFICATIONETC ALL COMPLETE AS PER SPECIFICATION AND DIRECTION OF E/I |
| 33 | EXTRA COST OF RCC / PCC WORK FOR EACH CONSUTIVE FLOOR ABAVE FIRST FLOORDO………DO……..AL COMPLETE JOB |
| 34 | EXTRA FOR PLASTER WORK OVER EXTERIOR SURFACE FOR EACH CONSECUTIVE FLOOR ABOVE FIRST FLOOR INCLUDING COST OF SCAFFOLDING ETC ALL COMPLETE AS PER DIRECTION OF E/I |
| 35 | EXTRA FOR CENTERING AND SHUTTERING IN RCC WORK OF BEAM , STIFFNER AND COLUMN ROOF JOINTS OF 100MM GAP DO ……. DO…… ALL COMPLETE JOB BEAM |
| 36 | EXTRA FOR CENTERING AND SHUTTERING IN RCC WORK OF BEAM , STIFFNER AND COLUMN ROOF JOINTS OF 105MM GAP DO ……. DO…… ALL COMPLETE JOB BEAM |
| 37 | ADD. CARRIAGE COSTOF MATERIALS(1) CEMENT LEAD FROM 14+1 KM |
| 38 | (2) STONE CHIPS LEAD FROM 27+3 KM |
| 39 | (3)ROD LEAD FROM 14+1 KM |
| 40 | (4) SAND LEAD FROM 27+3 KM |
| 41 | (5) BRICK LEAD FROM 60 KM |
| 42 | add S/B & PHOTOGRAPHY |
| 43 | Add . 18 % GST |
| 44 | add 1 % labour cess |