Tender For Overhauling Of H,Tlt Motors, Transformers, Electrical Work, Maintenance Of Pa System And Transformer In Chp Area And Works, Ptpp, Parichha, Jhansi
Tender Overview
Project Description
Overhauling Of H,Tlt Motors, Transformers, Electrical Work, Maintenance Of Pa System And Transformer In Chp Area And Works, Ptpp, Parichha, Jhansi Overhauling Of Ht,Lt Motors, Transformers, Electrical Work, Maintenance Of Pa System And Transformer In Chp Area And Works, Ptpp, Parichha, Jhansi
BOQ
| Sl. No. | Item Description |
| 1 | OVERHAUL HT MTR 200-270KW 6.6KV |
| 2 | ASSEMBLEBLE HT MTR 200-270KW 6.6KV |
| 3 | DISMANTLEANTLE HT MTR 200-270KW 6.6KV |
| 4 | REMOVAL FIX BRG 200-270KW, 6.6 KV |
| 5 | OVERHAUL HT MTR 373-500KW 6.6KV |
| 6 | ASSEMBLE HT MTR 373-500KW 6.6KV |
| 7 | DISMANTLE HT MTR 373-500KW 6.6KV |
| 8 | REMOVAL FIX BRG 373-500KW, 6.6 KV |
| 9 | OVERHAUL LT MTR 0 KW-5 KW |
| 10 | OVERHAUL LT MTR 5.1-20KW |
| 11 | OVERHAUL LT MTR 20.1-35KW |
| 12 | OVERHAUL LT MTR 35-60KW |
| 13 | OVERHAUL LT MTR 60.1-147KW |
| 14 | OVERHAUL LT MTR VFD |
| 15 | OVERHAUL LT MTR 55KW SLP RNG |
| 16 | OVERHAUL LT MTR 75-77KW SLP RNG |
| 17 | OVERHAUL LT MTR RESISTNCE WAGON TIPPLER |
| 18 | REMOVAL BROK BOLT MAK THREAD LT MTR |
| 19 | DISMANTLE FRACTION-5KW LT MTR |
| 20 | DISMANTLE 5.1-20KW LT MTR |
| 21 | DISMANTLE 20.1-35KW LT MTR |
| 22 | DISMANTLE 35.1-60KW LT MTR |
| 23 | DISMANTLE 60.1-147KW LT MTR |
| 24 | ASSEMBLE FRACTION-5KW LT MTR |
| 25 | ASSEMBLE 5.1-20KW LT MTR |
| 26 | ASSEMBLE 20.1-35KW LT MTR |
| 27 | ASSEMBLE 35.1-60KW LT MTR |
| 28 | ASSEMBLE 60.1-147KW LT MTR |
| 29 | REMOVAL FIX BRG FRACTION-5KW LT MTR |
| 30 | REMOVAL FIX BRG 5.1-10KW LT MTR |
| 31 | REMOVAL FIX BRG 10.1-35KW LT MTR |
| 32 | REMOVAL FIX BRG 35.1-60KW LT MTR |
| 33 | REMOVAL FIX BRG 60.1-147KW LT MTR |
| 34 | REPAIR OUTSHAFT KEYWAY 0KW-1KW LT MTR |
| 35 | REPAIR OUTSHAFT KEYWAY 1KW-5KW LT MTR |
| 36 | REPAIR OUTSHAFT KEYWAY 5KW-10KW LT MTR |
| 37 | REPAIR OUTSHAFT KEYWAY 10KW-20KW LT MTR |
| 38 | REPAIR OUTSHAFT KEYWAY 20KW-35KW LT MTR |
| 39 | REPAIR OUTSHAFT KEYWAY 35KW-60KW LT MTR |
| 40 | REPAIR OUTSHAFT KEYWAY 60KW-95KW LT MTR |
| 41 | REPAIR OUTSHAFT KEYWAY 95KW-147KW LT MTR |
| 42 | DYNMIC BALNC ROTR FRAC-1KW LT MTR |
| 43 | DYNMIC BALNC ROTR 1.1-5KW LT MTR |
| 44 | DYNMIC BALNC ROTR 5.1-10KW LT MTR |
| 45 | DYNMIC BALNC ROTR 10.1-20KW LT MTR |
| 46 | DYNMIC BALNC ROTR 20.1-35KW LT MTR |
| 47 | DYNMIC BALNC ROTR 35.1-60KW LT MTR |
| 48 | DYNMIC BALNC ROTR 60.1-147KW LT MTR |
| 49 | REPAIR MOTER BASE 0KW-5KW |
| 50 | REPAIR MOTER BASE 5KW-20KW |
| 51 | REPAIR MOTER BASE 20KW-35KW |
| 52 | REPAIR MOTER BASE 35KW-60KW |
| 53 | REPAIR MOTER BASE 60KW-95KW |
| 54 | REPAIR MOTER BASE 95KW-147KW |
| 55 | RPBM TRFR HT CBL LTMCC LIGHT FO HOIST |
| 56 | OH HT/LT TRF 6.6/.4KV 1000/1500/2000KVA |
| 57 | PAINTING REMOVAL OLDSLUDGE TRFR |
| 58 | ROUT MAINT OH PA BNA SYST 210MWCHP |
| 59 | SUPPLY FIT PA BNA TRFR 240/24V |
| 60 | SUPPLY FIT PA BNA DIAPHRAGM |
| 61 | SUPPLY FIT PA BNA EARPIECE CAPSULE |
| 62 | SUPPLY FIT PA BNA MOUTH PIECE |
| 63 | SUPPLY FIT PA BNA SYST SPEAKER |
| 64 | REPAIR BNA PA BNA MOTHERBRD DESKTOP |
| 65 | CENTRIFUGING OF TRFR OIL |
| 66 | LAYING POWER CABLE 1C X 500MM2 |
| 67 | LAYING POWER CABLE 3C X 240MM2 |
| 68 | LAYING POWER CABLE 3C X 185MM2 |
| 69 | LAYING POWER CABLE 3C X 150MM2 |
| 70 | LAYING POWER CABLE 3C X 70MM2 |
| 71 | LAYING LT CABLE 400/120 MM2 |
| 72 | LAYING OF CONTROL CABLES |
| 73 | END TERMINATION CABLE 1C 500SQMM |
| 74 | END TERMINATION CABLE 1C 400SQMM |
| 75 | END TERMINATION CABLE 3C 240SQMM |
| 76 | END TERMINATION CABLE 3C 185SQMM |
| 77 | END TERMINATION CABLE 3C 150SQMM |
| 78 | END TERMINATION CABLE 3C 70SQMM |
| 79 | STRAIGHT THROUGH JOINTING 1C 500SQMM |
| 80 | STRAIGHT THROUGH JOINTING 3C 70SQMM |
| 81 | RELUGGING OF CABLE 1C X 500 MM2 |
| 82 | RELUGGING OF CABLE 1C X 400 MM2 |
| 83 | RELUGGING OF CABLE 3C X 240 MM2 |
| 84 | RELUGGING OF CABLE 3C X 185 MM2 |
| 85 | RELUGGING OF CABLE 3C X 150 MM2 |
| 86 | RELUGGING OF CABLE 3C X 70 MM2 |
| 87 | FABRICATION OF CABLE RACKS/MS |
| 88 | SHIFT CABLE TRAY UPTO 300MM WIDTH |
| 89 | SHIFT CABLE TRAY ABOVE 300MM WIDTH |
| 90 | REMOVAL OF LOOSE SCRAP IN CABLE LAYING |
| 91 | JOINT 1CX800&3CX240&1CX630&3CX150&3CX185 |
| 92 | JOINT 1CX400&3CX120&1CX300&3CX95&1X185 |
| 93 | Painting of four pole structure |
| 94 | Painting of single pole structure |
| 95 | Complete earthing of distribution transformer of 11/0.4 KV substation including SUPL of earthing materials as per scope of work |
| 96 | Cutting/we lding plate/chanels etc, Related to electrical Pannels and Electrical items. |
| 97 | Spray painting various equipment |
| 98 | Overhauling/Re pairing of Junction Boxes |
| 99 | Replacement of damaged pipe at different height and location (250mm size-500mm size) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender