| 1 | Repairing ofSubmersible Pump including extraction of Column pipe assembly and lowering it etc. complete |
| 2 | Repairing of Starter including all labour meterial T&P etc. Complete. |
| 3 | Supply and fixing of Following C.I./D.I. Valve ISI marked approved fittings including transportation, labour & T&P etc with all specials lowering them in to the trenches, fixing in posion and jointing true to alignment and testingrequired for proper completion of the work. |
| 4 | Sluice valve 150 mm dia |
| 5 | Sluice valve 100 mm dia |
| 6 | Sluice valve chamber (Surface box Type) |
| 7 | Repairing ofSluice valve |
| 8 | Leakage Repairing in following dia PVC/HDPE pipe.including supply of all materials, labour and T&P etc required for proper completion of the work. And also including road cutting, excavation of trenches etc. complete. |
| 9 | 63 mm dia pipe |
| 10 | 75 mm dia pipe |
| 11 | 90 mm dia pipe |
| 12 | 110 mm dia pipe |
| 13 | 140 mm dia pipe |
| 14 | Dismantling of following type of road pavements for laying of pipe line, sorting out and stacking of serviceabe material and disposal of unserviceable material with in a distance of 50m from the centre of trenches, including supply of all material, labour & T&P etc. required for proper completion of the work |
| 15 | BOE Road |
| 16 | Interlock Road |
| 17 | CC Road |
| 18 | Supply of following dia pipe with specials and carting from store to the site of work, lowering in the same trenches to the alignment and level & jointing with couplers/rubber gaskets specials including testing of pipeline as per procedure laid down in manual on water supply and treatment work including labour T&P etc. complete |
| 19 | 110 mm dia HDPE Pipe (PE-100)6Kgf/cm2 |
| 20 | Reinstatement of following type of road pavements for laying of pipe line, sorting out and stacking of serviceabe material and disposal of unserviceable material with in a distance of 50m from the centre of trenches, including supply of all material, labour & T&P etc. required for proper completion of the work |
| 21 | BOE Road |
| 22 | Interlock Road |
| 23 | Bitumenous Road |
| 24 | CC Road |
| 25 | Excavationof trenches for pipeline in ordanary/konkar mix soil withlift upto 1.5m.lead up to 50 meter including back filling, watering and ramaing of excavated earth in to the trenches and removal, disposal of surplus earth with in distance of 5 meter from the center of the excavated trenches. |
| 26 | excavation in soil |
| 27 | Repairing ofFHTC including supply of all materials, labour and T&P etc required for proper completion of the work. And also including road cutting, excavation of trenches etc. complete. |
| 28 | Supply & Fixing of Chlorine Dozer (electronic type) including supply of all material, labour & T&P etc. required for proper completion of the work |
| 29 | Supply & Fixing of electric cable( ISI Mark) 4 MM² for Submersiblemotor pump etc. complete. |