| 1 | Clearing the area for the formation of beds (moderate growth) |
| 2 | Preparation of seed beds for sowing of seeds(standard bed size12.00m *1.20m) |
| 3 | Cost of seeds |
| 4 | Pre sowing seed treatment |
| 5 | Sowing seeds and covering with straw and removing the cover after germination 6.5 bed x 2 times |
| 6 | Cost of straw at average two bundle for one bed including transportation |
| 7 | Watering mother beds at the rate of 20 litre per m2 twice daily for first 30 days (12*1.2*17*30 = 7344m2) |
| 8 | Watering mother beds at the rate of 20 litre per m2 once daily for next 10 days ( for slow germination seeds) (12*1.2*17bed*10 days = 2448m2) |
| 9 | Cost of sieved soil including transportation charge 50CC of soil +10 % for adding later on, ie. 55 CC. This case 25000*55CC=1250000 CC ie, 1.250 M3 |
| 10 | Cost of coir pith 50 CC of soil + 10% for adding later on, ie. 55 CC. This case 25000x55CC=125000 CC ie. 1.375M3 (1 m3 coir pith = 667 kg) 1.375x667=917.12 kg |
| 11 | Preparation of potting mixture, filling root trainer blocks, transporting them to shade house and arranging on root trainer stands |
| 12 | Hand picking germinated seeds from bed, dibbing in RT cells and adding compost to cover seeds |
| 13 | Casuality Replacement in empty cells, pregerminated seeds from the heaps, dibbing RT cells and adding compost to cover seeds. (20% of total) |
| 14 | Wateringbeds4 times daily for the first 10 days (The area of CRT tray containing 24 seedlings size 0.546 x0.364 is 0.1987 m2 for 25000 seedlings need 1041.66 trays, ie 1041.66 x 0.1987 = 206.979 m2) for 25000for 4 times4x206.979=827.916 for 10 days 10 x 827.979 =8279.16m2(in case of interrupted power supply) |
| 15 | Watering watering beds3 times daily for the next 15 days. (The area if CRT trat containing 24 seedlings size 0.546 x 0.364 is 0.1987 m2for 25000 seedlings need 1041.66 x 0.1987 = 206.979 m2) for 3 times3x206.979=620.937 for 15 days 15 x 620.937 =9314.055 m2(in case of interrupted power supply) |
| 16 | Weeding nursery beds as and when necessary |
| 17 | Cost of CRT with 5% GST (Cubic content: 150cc top diameter(inner): 50mm(min) length 100mm bottom hole diameter 20 mm thickness (min) 2 mm equally spaced internal ridges : 4 nos including transportation |
| 18 | Provision for VDA for items No. 1,2,4,5,7,8,11,12,13,14,15,16 |
| 19 | Contractors Profit @10% (Amount of items No. 1,2,4,5,7,8,11,12,13,14,15,16 ie excluding LS items) |
| 20 | Contingencies such cost of pesticides and fungicides, display boards, species indicatory boards, printing charges of photos of each bed etc |