| 1 | Construction of embankment with approved material obtained from borrow pits with all lifts upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1 and 300.2 with lead up to 1000m as per technical specification clause 301.5 |
| 2 | Providing, laying and spreading Material on a prepared sub grade, adding cement @ 2% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base. |
| 3 | Providing, laying and spreading Material on a prepared sub base, cement @ 4% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer ofbase. |
| 4 | Tack Coat (i) Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.Clause 503. MORD |
| 5 | 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type C as per Technical Specification Clause 508. Case - II By Mechanical Means(HMP 30/40) (I) Bitumen VG-10 |
| 6 | Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510Case - III : Type CBy Mechanical Means(HMP 30/40) (I) Bitumen VG-10 |
| 7 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.. |
| 8 | Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 |
| 9 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6 |
| 10 | Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 II. Brick masonry in 1:4 cement mortar |
| 11 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granularmaterial in single row includingfixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. |
| 12 | Pointing with Cement Mortar (1:3) on brickwork as per technical specification Clause MORD 613.3 |
| 13 | Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 |
| 14 | Lettering and painting of culvert and parapet etc. complete. |
| 15 | Providing and Fixing of Kilometer Stone, Hectometer Stone and Sign Board etc. |
| 16 | Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts anddressingofsideslopes/berms,makingupofberms/shoulders, maintenance of drains, maintenance of guard rail and parapets, maintenance ofroadsigns,speedbreakers,standingtreeadjacenttoroadwherever required,maintenanceof200m(hectometrestone)andkilometrestones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1- 2024-23-1099/113/2023dated 16.01.2024&EncLetterno.3689/C- OPRMC/MUL-2023-24 dated 17.02.2024) (I) Maintenance of First Year (@0% of Total Work Amount of 1 to 15) |
| 17 | Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts anddressingofsideslopes/berms,makingupofberms/shoulders, maintenance of drains, maintenance of guard rail and parapets, maintenance ofroadsigns,speedbreakers,standingtreeadjacenttoroadwherever required,maintenanceof200m(hectometrestone)andkilometrestones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1- 2024-23-1099/113/2023dated 16.01.2024&EncLetterno.3689/C- OPRMC/MUL-2023-24 dated 17.02.2024) (II) Maintenance of Second Year (@1.00% of Total Work Amount of 1 to 15) |
| 18 | Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts anddressingofsideslopes/berms,makingupofberms/shoulders, maintenance of drains, maintenance of guard rail and parapets, maintenance ofroadsigns,speedbreakers,standingtreeadjacenttoroadwherever required,maintenanceof200m(hectometrestone)andkilometrestones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1- 2024-23-1099/113/2023dated 16.01.2024&EncLetterno.3689/C- OPRMC/MUL-2023-24 dated 17.02.2024) (III) Maintenance of Third Year (@1.50% of Total Work Amount of 1 to 15) |
| 19 | Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts anddressingofsideslopes/berms,makingupofberms/shoulders, maintenance of drains, maintenance of guard rail and parapets, maintenance ofroadsigns,speedbreakers,standingtreeadjacenttoroadwherever required,maintenanceof200m(hectometrestone)andkilometrestones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1- 2024-23-1099/113/2023dated 16.01.2024&EncLetterno.3689/C- OPRMC/MUL-2023-24 dated 17.02.2024) (IV) Maintenance of Fourth Year (@2.00% of Total Work Amount of 1 to 15) |
| 20 | Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts anddressingofsideslopes/berms,makingupofberms/shoulders, maintenance of drains, maintenance of guard rail and parapets, maintenance ofroadsigns,speedbreakers,standingtreeadjacenttoroadwherever required,maintenanceof200m(hectometrestone)andkilometrestones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1- 2024-23-1099/113/2023dated 16.01.2024&EncLetterno.3689/C- OPRMC/MUL-2023-24 dated 17.02.2024) (IV) Maintenance of Fifth Year (@3.00% of Total Work Amount of 1 to 15) |
| 21 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density as per MORD specification 401 |
| 22 | WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (A) By Manual Means |
| 23 | Cement Concrete Pavement Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixture as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 |
| 24 | Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 |
| 25 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I.( P.C.C grade M 10 (i) Nominal mix 1:3:6) |
| 26 | Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 II. (Brick masonry in 1:4 cement mortar) |
| 27 | Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 |
| 28 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 IV. R.C.C grade M 20 |
| 29 | Supplying, fitting and placing Mild steel reinforcement complete in sub-structure as per drawing and Technical Specification No. 1000 |
| 30 | Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts anddressingofsideslopes/berms,makingupofberms/shoulders, maintenance of drains, maintenance of guard rail and parapets, maintenance ofroadsigns,speedbreakers,standingtreeadjacenttoroadwherever required,maintenanceof200m(hectometrestone)andkilometrestones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1- 2024-23-1099/113/2023dated 16.01.2024&EncLetterno.3689/C- OPRMC/MUL-2023-24 dated 17.02.2024) (I) Maintenance of First Year (@0% of Total Work Amount of 21 to 29) |
| 31 | Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts anddressingofsideslopes/berms,makingupofberms/shoulders, maintenance of drains, maintenance of guard rail and parapets, maintenance ofroadsigns,speedbreakers,standingtreeadjacenttoroadwherever required,maintenanceof200m(hectometrestone)andkilometrestones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1- 2024-23-1099/113/2023dated 16.01.2024&EncLetterno.3689/C- OPRMC/MUL-2023-24 dated 17.02.2024) (II) Maintenance of Second Year (@0.25% of Total Work Amount of 21 to 29) |
| 32 | Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts anddressingofsideslopes/berms,makingupofberms/shoulders, maintenance of drains, maintenance of guard rail and parapets, maintenance ofroadsigns,speedbreakers,standingtreeadjacenttoroadwherever required,maintenanceof200m(hectometrestone)andkilometrestones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1- 2024-23-1099/113/2023dated 16.01.2024&EncLetterno.3689/C- OPRMC/MUL-2023-24 dated 17.02.2024) (III) Maintenance of Third Year (@0.50% of Total Work Amount of 21 to 29) |
| 33 | Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts anddressingofsideslopes/berms,makingupofberms/shoulders, maintenance of drains, maintenance of guard rail and parapets, maintenance ofroadsigns,speedbreakers,standingtreeadjacenttoroadwherever required,maintenanceof200m(hectometrestone)andkilometrestones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1- 2024-23-1099/113/2023dated 16.01.2024&EncLetterno.3689/C- OPRMC/MUL-2023-24 dated 17.02.2024) (IV) Maintenance of Fourth Year (@0.75% of Total Work Amount of 21 to 29) |
| 34 | Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts anddressingofsideslopes/berms,makingupofberms/shoulders, maintenance of drains, maintenance of guard rail and parapets, maintenance ofroadsigns,speedbreakers,standingtreeadjacenttoroadwherever required,maintenanceof200m(hectometrestone)andkilometrestones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1- 2024-23-1099/113/2023dated 16.01.2024&EncLetterno.3689/C- OPRMC/MUL-2023-24 dated 17.02.2024) (IV) Maintenance of Fifth Year (@1.00% of Total Work Amount of 21 to 29) |