| 1 | Earth work narrow excavaion for foundation in all soils and sub-soils and to full depth as may be directed except hard rock requiring blasting inclusive of shoring, shuttering and baling out water wherever necessary, refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, watered, well rammed, consolidated and depositing the surplus earth onbank with initial lead of 10m & initial lift of 2 m, clearing and leveling the site etc..., complete as directed by the federation officers and as per standard specification. |
| 2 | Supply and filling with M sand for foundation and basement to required thickness and in layers of not more than 15cm thick, watered, well rammed and consolidated etc.., complete as directed by the Federation Officers and as per standard specifications |
| 3 | Plain Cement Concrete 1:5:10 [One part cement, five sand and ten parts aggregate] using 40mm size hard granite broken stones for foundation including de-watering if found necessary and laid in layers of not more than 15cm thick for flooring including rendering the top surface rough to take floor finish etc..., and including side shuttering if required and compaction, curing etc..., complete as directed by the Federation officers and as per standard specification. |
| 4 | Supplying and filling with conveyed Gravel from approved source of supplyfor foundation and basement to required thickness and in layers on not more than 30 cm thick, watered ,well rammed and consolidated etc., complete as directed by the Federation officers and as per the technical Specifications. |
| 5 | Supplying, erecting steel centering using M.S. Sheet of Size 90 x 60 cm and BG 10 Gauge stiffened welded with M.S. Angle of Size 25 x 25 x 3 mm laid over Silver oak / Country wood joint of size 10 x 6.5 cm spaced at about 90 cm center to center and supported by casurina props of 10 to 13 cm dia spaced at 75 cm center to center for all type of RCC roof slab, Lintel beam, \"T\", \"L\" Beam, Landing slab, Plinth beam, Grade beam, Column footing, column, Sunshade, facia, sloped roof, waist slab etc., including necessary supports with all cross bracings, filling slits and holes in the surface ( The retrived materials should be taken back by the contractors ) and side shuttering etc., complete as directed by the federation officers and as per standard specification.. |
| 6 | Upto Basement - Plain surface |
| 7 | Upto basement-column surface |
| 8 | 0 to 3.30m Height plain surface |
| 9 | Supply, fabricating and placing in position of reinforcement grills of all RCC works including cost of steel rods, binding wire, labour for bending, cutting and tying etc…, complete as directed by the Federation Officers. |
| 10 | RCC concrete machine mixed 1:1.5:3 [ one part cement, one and a half parts sand and three parts aggregate ] using 20mm machine crushed hard granite broken stones for all RCC works cost excluding centering and reinforcement but including compacting with mechanical vibrators and curing etc.. complete as directed by the Federation Officers and as per standard specifications. |
| 11 | upto Basement |
| 12 | Above Basement - 0.00 to 4.50m height |
| 13 | Brick wall in cement mortar 1:5 (one part cement and five parts sand) 23cm thick using second class ground moulded chamber burnt bricks of size 9\" x 43/8\" x 23/4\" to line, level and to plumb complete incuding scaffolding and neatly finishing etc…, complete as directed by the Federation Officers and as per standard specifications. |
| 14 | upto basement |
| 15 | Plastering with cement mortar 1:5 [One part cement and five parts sand] 12 mm thick including scaffolding, neatly finishing and curing etc…, complete as directed by the Federation Officers and as per standard specifications. |
| 16 | Construction of manhole chamber in a size of 0.60 x 0.60 to 1.00 m depth including all civil works etc.complete as directed by the Federation Officers and as per standard specifications.. |
| 17 | Supplying, fabricating and erection of MS Trusses complying with standard specifications. including anchor & connection bolt as specified in the deawing, welding as per IS 816, of approved quality and colour after sand blasting with necessary hire charges of crane, hoisting, equipments, rope charges,painting etc, complete in all respects as directed by the federation officers. |
| 18 | Providing and fixing MS powder coated 0.47mm thick sheet roofing / side walling including the cost and conveyance of all to site and all labour chargesand as per standard specifications and as per design etc complete.(JSW/TATA ) |
| 19 | Supply & Painting with 2 coats of interior/exterior emulsionpaint over one coat of primer including scaffolding, neatly finishing etc.., complete as directed by the Federation Officers and as per standard specifications. |
| 20 | Supply & Painting new iron work with 2 coats of anti-corrosive synthetic enamel paint of approved quality and colour over priming coat etc..complete as directed by the Federation Officers and as per standard specifications. |
| 21 | Paving the floor with Granite Stone Slabs of 30mm thick with Machine Cut Edges of size 2’0” x 2’0” and above(un-polished) in all floors laid in of cement mortor 1:3 (one cement three sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc., so as to perfectly smooth and glossy and including hire charges for polishing machine and power consumption charges etc. Thestone slabs and other materials to be used shall be got approved by the Asst Executive Engineer concerned before use on work, etc., complete as per standard speicification. |
| 22 | Supply and fixing of frb manhole heavy duty square type 0.6m x0.6m cover etc…complete as directed by the federation officers and as per standardspecification. |
| 23 | Supply and fixing of PVC 160 mm dia pipe including all material,labour,transport charges etc, complete as directed by the federation officers and as per standardspecification. |
| 24 | supply and fixing of amul trap etc…complete as directed by the federation officers and as per standardspecification. |
| 25 | GST (Note: The tenderer should quote the amount towards Goods and Service tax (GST) in the appropriate columns in terms of percentage (%). If not quoted, it will be considered that the rate quoted is inclusive of GST.) |