| 1 | Construction of embankment with approved material bteained from borrow pits with a lift up to 1.5m transporting to site, spreading grading to required slope and compacting to meet requirement of tables 300.1 and 300.2 with a lead up to 1000m as per Technical Specification Clause 301.5 |
| 2 | Construction of granular sub-base by providing wellgraded ready mixed material, spreading in uniform layers with moter grader on pre[ared surface with at OMC and Compacting in layer with smooth wheel roler to achieve the desired density3 |
| 3 | Prividing Laying spreading and compacting stone aggregates of 22.4-53mm Stone ballast size to water bound macadam specification including spreading in uniform thickness hand packing, rolling with three wheel 80-100KN static roller in stages to proper grande and camber applying and brooming, Type-B screening (Stone Dust) to Fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification cLAUSE 405. |
| 4 | Suplying and laying of 125 micron polythene sheet under the C C Road Slabe including supply of all materials labour T&P etc required for proper completion of work SI No.-N.S. |
| 5 | Laying C.C. Road slabe consisting of 1:1.5:3 Cement coarse sand & approved 20mm gaugs stone Ballast over prepared sub grade affter its rectification & bringing it to proper camber & including supply of all meterials labour and T&P etc. required for proper completion of wark finished to required templete as directed by Engineer-in charge but excluding cost of metal required for rcetification of the sub grade Sor Si no0 773 (b) |
| 6 | Clining of site |
| 7 | Supply & Fixing of Sign Board etc. Complete |
| 8 | Excatiopn in foundetion in ordinary soil (Loam clay. Sand) including filling lift up to 1.5m and lead up to 30m & including filling watering and ramming of excavated earth info the trenches or into the trenches or in to the space between the bulding and the side off foundation trenches or plinth and removal and disposal of surplus earth as distance of 30 m from the foundation trenches including all t&p phowarah and basked etc complete. sor no 251 |
| 9 | Cement Concrete with 4cm guage approved stone ballast approve coarse sand and cement in the proprotion of 8:4:1 including supply of all materials, labour and T&P etc required of proper completion for the work SOR No.- 281 |
| 10 | M-150 brick work in 1:4 cement andsand of 1.25 fineness modulus mortor in foundation & plinth including supply of all material, labour and tools and plants, etc . Required for proper complition of work. SOR SI. No. 305 |
| 11 | 12mm thick plaster with cement mortar on proportion of 1:4cement oand sand of 1.25 F.M. over bricck work minimum thickness not be less than 10 mm including supply of all materials. Labour and T& P etc. required for proper completion of the work . SOR SI. No 584 |
| 12 | R.C.C. work in 1:1, 5:3 with cement approved coarse sand and 2cm gauge approved stone ballast includingall matiereal,labour, tools and plants etc. required for proper completion for the workSOR No. - 284a |
| 13 | Mild steel or iron ij plain work such as in reinforced concrete including bending for propor completion of the workand including suply of steel its wastage etc. SOR NO.- 503 |
| 14 | Cement Concrete with 2 cm . Guage approved stone ballast, approved coars sand and cement in the proprotion of 4:2:1 including supply of all materials , labour and T&P etc. required for proper completion for the work.SOR No. - 279 A |