| 1 | Excavation of pole pit for pole above 8.00m length by using JCB/Manual |
| 2 | Erection of RCC, REC, PSC poles above 8.00m length by using Crane / Manual |
| 3 | Excavation of pole pit for pole upto 8.00m length by using JCB/Manual |
| 4 | Erection of RCC, REC, PSC poles upto 8.00m length by using Crane / Manual |
| 5 | Fixing of Tapping X-Arm/Guarding X-Arm |
| 6 | Fixing of V Cross Arm |
| 7 | Fixing of HT/LT TI Fittings |
| 8 | Fixing of LT 1 phase cross arm |
| 9 | Fixing of LT 3 phase cross arm |
| 10 | Fixing of 11 KV Strain Disc With Metal Parts |
| 11 | Fixing of 11 KV Pin Insulator/Polymer Pin Insulator |
| 12 | Fixing of LT Shackle |
| 13 | Fixing of LT Pin Insulator |
| 14 | Fixing of Alu Knob |
| 15 | Excavation of Stay pit of 4.5 \" to 5 \" depth using JCB / Manual |
| 16 | Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc.. |
| 17 | Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor |
| 18 | Paving and stringing of conductors of sizes above 7/2.59 mm ACSR or other equivalent conductor |
| 19 | Concretingwith 1:4:8 mix using 40 mm Jelly including curing(Material +labour) (i) Mass concreting of poles |
| 20 | Earthing of pole |
| 21 | Transporting of conductors of all sizes from road side to pit locations upto one KM of Conductor |
| 22 | Dismantling of conductor upto 7/3.35 mm including closing of the pit |
| 23 | Dismantling of RCC,REC,PSC & metal pole of all sizes including the closing of the pit |
| 24 | Dismantling of line materials, cross arm, clamps, TI Fitting, hardwares etc.., |
| 25 | Loading and unloading of various sizes of poles (i) REC, RCC, PSC pole upto 8.00 m length |
| 26 | Loading and unloading of various sizes of poles(ii) REC, RCC, PSC pole above 8.00 m length |
| 27 | Loading / Unloading of line materials |
| 28 | Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) (i) For a lead upto 5 KM |
| 29 | (i) Transporting ofLine materials from stores to office / site upto 10 KM distance by engaging 1 Ton capacity Minidor (Lorry) |
| 30 | Erection of 11 KV Single Pole Structure including erection of DT complete with centre support including fixing of MCD box |
| 31 | Loading and Unloading of Distribution Transformer (i) Upto 100 KVA |
| 32 | Transporting of Distribution Transformerfrom stores to office /site upto 10 KM distance by engaging 1 Ton Capacity Minidor (Lorry) |
| 33 | G.S.T. @18% should be Entered by the Bidder |