| 1 | Supply of embeded parts consisting of structural steel and rolled steel i.e Wall liner 4800 x 150 x 8 mm thick 8 nos,Wall liner 4800 x 120 x 8 mm thick 16 nos,1/2 CUT MB 200of length 1750 mm 4 nosincluding 5% cutting allowalnce. |
| 2 | \"Supply of embeded parts consisting of Stainless steel i.e Side seal SS seat 3000 x 60 x 4 mm thick 8 nos,Sill beam SS seat 1684 x 50 x 4 mm thick 4 nos,including 10 % machining allowance. |
| 3 | Fabrication ofabove item including 2nd stage embedments with all accessories,machinery, fixtures, labour, cutting, alligning, welding, cleaning, finishing, ncluding consumables, all complete as per direction of Engineer- in-charge. |
| 4 | \"Supplyof vertical lift sliding Gate leaf consisting of Skin plate 1684 x 1650 x 8 mm thick 4 nos,End V girder 1650 x 65 x 10 mm thick 8 nos,Hor. Girder 1634 x ISA 65 x 65 x 6 xmm thick 16 nos,diaphrgm-1 1350 x 65 x 8 mm thick 4 nos,diaphrgm-2 1650 x 65 x 8 mm thick 8 nos,Side seal mounting1650 x 55 x 8 mm thick 4 nos,Side seal clamp plate 1650 x 50 x 8 mm thick 4 nos,Pad base 80 x 30 x 18 mm thick 16 nos,Btm. Seal clamp pl 1684 x 50 x 8 mm thick 4 nos,Lifting bracket 400 x 150 x 12 mm thick 8 nos,including 5% cutting allowance. |
| 5 | Fabrication ofgate leaf including bronze pad, Btm Seal, Side Seal, C/s screw, nut/bolt etc,with all accessories, machinery, fixtures, labour, cutting, alligning, welding, cleaning, finishing, ncluding consumables, all complete as per direction of Engineer- in-charge. |
| 6 | Supply of Steel hoist bridge for Single stem Nut type gear boxhoist consisting ofBase plate 400 x 200 x 8 mm thick 16 nos,CI Gear box base plate 500 x 500 x 16 mm thick 4 nos,Supporting beam ISMB 150 of length 2100 mm 8 nos,Anchor bar 350 x Dia 20 xmm64 nos,Chequred plate for platfrom 1400 x 430 x 6 mm4 nos, including 5% cutting allowance. |
| 7 | Fabrication of Steel hoist bridge with all accessories including machinery, fixtures, consumables, labour, cutting, alligning, welding, cleaning, finishing all completeas per direction of Engineer-in- charge. |
| 8 | Erection, positioning, alligning, fixing, trial and commissioning including unloading and shifting upto location of all componentsof 1st stage and 2nd stage Embedded parts (consistingof sill beam, wall liners, track plates etc),Vertical Gate leaf (complete assembly with fixing of bronze pad, rubber seals), Steel hoist bridge assembly (consisting of hoist platform, Screw rod, lifting gear box,supporting beams, base plates, anchor bolts etc) with all accessories including machinery, fixtures, labour, cutting, alligning, welding, cleaning, finishing including consumables all complete as per direction of Engineer in charge. |
| 9 | Supply of following bought out materials per gate LTB-1 Bronze pad of size 80mm x 30mm x 12mm(including cost of material, machining & countersunk holes) 4 nosBottom Seal( Plate75 x 10mm) 1 no of lengh 1684mmSide Seal( Ф25-70 x 10mm) 2 nos of lengh 1650mm1St stage embedments, Ø16 Studs, bolts, nuts, washers & nut, bolt& seal required for mounting rubber seal etc. 30 kgAnchor bars 16 nosNut type Screw Gear box assembly suitably square threaded for 80mm dia screw rod all inclusive of cost of material, cost of Thrust bearing, machining and assembly charges. 1 noDia 80mm Screw Rod suitably square threaded to M62 x 9 all inclusive of cost of material, straightening and machining. 1.95 mtr.Dia 80mm plain Stem Rod all inclusive of cost of material, straightening etc. 0.8 mtrGate lifting pin(Ø 50mm & length 150mm) 1 noOperating handle 1 noLubricant like grease & mobil2 kg |
| 10 | Painting of 2nd stage embeded parts(exposed portion), all steel surface of gate including cleaning, degreasing, handling, cost of paint, applying of one coat primer of 40 micron thick & three coats of final paint of 100 micron each, all inclusive of labour, materials & consumables as per direction of Engineer-in- charge.Painting cost of Embeded part (With one coat Zinc primer & 3 coats of Coal tar epoxy paint), GateLeaf (With one coat Zinc primer & 3 coats of Coal tar epoxy paint),Hoisting Platform (With one coat Zinc primer & 3 coats of Aluminium paint).The rate is inclusive of cost of materials excluding GST and includingcontractor profit @ 7.5% and cess@ 1%. |
| 11 | Extra works with provision of Labour charges for vent & site cleaning/ clearing& digging soil deposited in the working site;Construction of coffer dam by sand bagand dismantling after completion of work;Pump with 10HP diesel enginefor dewatering of entrapped water;Concrete cutting ;2nd stage concreting ;Locking arrengement to prevent unauthirised operation; |
| 12 | Transportation cost:Transportation of Bulky materials like Machineries, generators etc alongwith gate components & other accesories (per truck) |