Sales : +91-777 804 8217
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 01-02-2025 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 08-02-2025 |
| Sl. No. | Item Description |
| 1 | Material and labour for Descaling of condenser unit by rubbing with nylon brush/ cleaning rod using hydrochloric acid pumped through electric driver descaling pump including dismantling and connecting all dismantled components in proper position after servicing/ overhauling/ greasing etc replacement of packing gasket 3mm thick, nuts, bolts with washer, testing of water line for leakage & repairing of pipe line to make it leak proof complete, all as specified and directed for the following AC plants :-Notes : (i) The de-scaling & cleaning of condenser (Heat Exchanger) of cooling tower shall be done by circulating concentrated de-scaling solution mixed withwater of make as approved to the entire satisfaction of GE/Engineer-in-Charge complete all as specified in Sch ‘A’. (ii)The hydrochloric acid shall be used as a de-scaling solution mixed with water in a suitable proportion as approved by the GE/Engineer-in-Charge so as avoid damage to existing pipe lines. |
| 2 | 11 TR capacity AC Plant Package Type (installed at Mechanical LabTechnical Area. IRDE) |
| 3 | 27.5/27 TR capacity AC Plant(installed at Micro /C V RAMAN Building IRDE) |
| 4 | 30 TR capacity AC plant (installed at Chetak Buildling). |
| 5 | 45 TR capacity AC Plant (installed at Large OpticsBuilding IRDE) |
| 6 | 65 TR capacity AC Plant (installed at MMG / Optics Building IRDE) |
| 7 | 80 TR capacity AC plant (installed at Photonic Buildling &EOL/ TIS BuildingIRDE). |
| 8 | Dismantlingthehead from compressor fitted in system, and strip opening ofcompressor headof twin cylinder for compressorcompletely for servicing /overhauling mechanically and electrically, and checking of various components with precision instruments to assess the requirements of repair/replacement, and making inventories for repairs required andre-fixing the serviceable parts in position afterproper cleaning, oiling/greasing,etc ,andremoving & replacement of defective / unserviceable parts with new parts,as required at site, and reassembling thecompressors headensuring perfectly leak proof after cleaning the oil sump, oil pump connecting rod, piston, liner etc and filling of compressor oil, before charging of refrigerant gas torequired pressure and testing at site on full load to the entire satisfaction complete all as specified and directed for following :- ( includednotes mentioned in herNotes: - (i) The replacement of defective / nonfunctional parts, andRefrigerant gas and compressor oilfor top up shall be measured & paid for separately as “Supply only” under appropriate item of Sch ‘A’ and fixing/filling rate for new items are deemed to include under these items. (ii) The refregrent gas to be pumped down before dismantlling the compressure head for avoid the wastage of gas. (iii)The quoted rate shall be deemed to include replacement of small/ minor parts for prroper functioning of compressure . |
| 9 | 11 TR capacity AC Plant Package Type (installed at Mechanical LabTechnical Area. IRDE) |
| 10 | 27.5/27 TR capacity AC Plant(installed at Micro /C V RAMAN Building IRDE) |
| 11 | 30 TR capacity AC plant (installed at Chetak Buildling). |
| 12 | 45 TR capacity AC Plant (installed at Large OpticsBuilding IRDE) |
| 13 | 65 TR capacity AC Plant (installed at MMG / Optics Building IRDE) |
| 14 | 80 TR capacity AC plant (installed at Photonic Buildling &EOL/ TIS BuildingIRDE). |
| 15 | M&L forcutting and grinding the crank-shaft (for27.5 TRof Kirloskar make/SMC 8-65 model of ACCEL compressor) of 0.50/0.75 mm aroundas required to make it equivalent to manufacturer’s standard sizeand smoothening/ fine finishing,polishingof shaft to match with half section big end bearings, cleaning oil ports for proper lubrication complete all as specified and directed by Engr-in-Charge. Note : (i) The cost of taking out and re-fixing of the shaft / rod in position after necessary repairs is deemed to be included under the rates quoted by the contractor for respective Schedule `A\"item.(ii)The rates for above items are deemed to include transportation to & fro of crank-shaftto workshop for necessary repairs. |
| 16 | Supply onlyfollowing items / spare parts suitable for Kirloskar make compressors of semi sealed 27.5 TR / 8-65 Accel Make dismantled / fixed under Sch ‘A’ item No.15 here inabove completeall as specified and directed |
| 17 | Cylinder liner |
| 18 | Piston Bare |
| 19 | Compression ring set |
| 20 | Pistonpin/ gudgen pin |
| 21 | Circlip internal |
| 22 | Connecting rod -05mm |
| 23 | Suction valve\"o\" ring |
| 24 | Suction & Discharge valve spring |
| 25 | Discharge valve assembly (R-22) |
| 26 | Crank shaft AC COMPRESSOR27.5 TR ofMakeKIRLOSKER/8-65 Accel |
| 27 | Safety plate |
| 28 | Shaft seal assembly |
| 29 | Rewinding of semi sealed compressure 27.5 TR |
| 30 | Filter wire gauge |
| 31 | Suction filter with nut |
| 32 | Oil pump with ring set for compressure 27.5 TR |
| 33 | Set of gasket for compressure 27.5 TR |
| 34 | Main bearing .05 mm. |
| 35 | Oil filter |
| 36 | loading coil |
| 37 | pressure gauge - 30 to 300 PSI |
| 38 | Carrying out leak detection in the system of AC plants including nitrogen pressure testing for 24 hours and repairing the leakage by gas welding / electric welding of refrigerant pipes, replacement of valve gland, gaskets etc. and then creating vacuum for 4 hours before charging refrigerantgas R-22 in the system and testing the complete plant for working pressure for 24 hours complete, all as specified and directed.Note : R-22 gas shall be measured and paid separately under Schedule ‘A’ Item. |
| 39 | 11 TR capacity AC Plant Package Type(installed at Mechanical LabTechnical Area. IRDE) |
| 40 | 27.5/27 TR capacity AC Plant |
| 41 | 30 TR capacity AC plant |
| 42 | 45 TR capacity AC Plant |
| 43 | 65 TR capacity AC Plant |
| 44 | 80 TR capacity AC plant |
| 45 | Supply, fixing, connecting and testing in replacement of UNSV strip heater fins type, 3.0 KW, 230 volts, single phase, AC supply in any positioncomplete, all as specified and directed. |
| 46 | Heater Element size and capacity as per existing Watre heater Generator 100/54 KWcomplete, all as specified and directed. |
| 47 | Supply of lubricating oil anti freezing for refrigeration in factory sealed container of standardcapacityfor filling under Sch ‘A’items No 3 complete,all as specified and directed. Make: Servo froze -68-10c of IOC. |
| 48 | Supply fixing and testing in replacement of UNSVpre filter with GI sheet frame of size 610mm x 610mm x 50mm deep suitable for Air handling units of air conditioning plantsincluding efficiency90% , down to 10-20microns, Initial Pressure drop- 2.5 mm WG, filter media shall be Synthetic Non Woven with Both Side HDPE Mesh, and testing complete complete, all as specified and directed. |
| 49 | Supply fixing and testing in replacement of UNSV condencer safety valve of size3/4\"& ½”, for pressure 300 PSI with and Including 3/4\"&½”, mild steel socketduly welded on condenser ensuring perfectly leak proof joint with pressure testingcomplete all as specified and directed. |
| 50 | Supply fixing and testing in replacement of UNSV water pressure gauge 100 mm dia of range0 to 100 PSI suitable for central AC plant complete all as specified & directed. |
| 51 | Supply fixing and testing in replacement of UNSV Gas pressure gauge 100 mm dia of range0 to 300 PSIsuitable for central AC plant complete all as specified & directed. |
| 52 | Supply fixing and testing in replacement of UNSV Water flow switchfor condenser and chiller suitable as per existing AC Plant Make :Carrier (Screw Chiller Unit) complete, all as specified and directed |
| 53 | Supply fixing and testing in replacement of UNSV Loading/ unloading coil suitable for as per existing AC Plant. Make :Carrier (Screw Chiller Unit)complete, all as specified and directed |
| 54 | Supply fixing and testing in replacement of UNSV PVC Fills of FPRcooling towersize 600mmx300mmx 150 mm complete, all as specified and directed |
| 55 | Disconnecting and removing old existing non functional electric motor,of any description and in any position from existing platform for compressor/blowers/pumps/ cooling towers and dismantling and strip opening of the motor, for cleaning oiling/greasing and fixing of serviceable parts in position andremoving the old existing burnt windings, cleaning the slots & rewinding of the electric motorwith existing gauge super enameled copper wire, including insulating material such as illuminous paper, Letherized paper, cotton tape, glass sleeves insulating varnish etc for poweringcompressor /blowers /pumps / cooling towers and transportation to site & refixing on existing platform ,connecting with exising connections & testing on full load complete all as specified and directed for following capacity :- . |
| 56 | 5.0 HPcapacity, Three phase 50 Hz AC supply |
| 57 | 7.5 HPcapacity, Three phase 50 Hz AC supply |
| 58 | 10 HP capacity, Three phase 50 Hz AC supply |
| 59 | 15 HP capacity, Three phase 50 Hz AC supply |
| 60 | Disconnecting and removing old existing non functional electric motor,of any description and in any position from existing platform for pumps and dismantling and strip opening of the motor, for cleaning oiling/greasing, Replaceing UNSV suitablesize of bearing and fixing ofbearing, imppler serviceable parts in position pumps and transportation to site & refixing on existing platform ,connecting with exising connections & testing on full load complete all as specified and directed for following capacity :- |
| 61 | 5.0 HPcapacity, Three phase 50 Hz AC supply |
| 62 | 7.5 HPcapacity, Three phase 50 Hz AC supply |
| 63 | 10 HP capacity, Three phase 50 Hz AC supply |
| 64 | 15 HP capacity, Three phase 50 Hz AC supply |
| 65 | Supply fixing,connectingand testing in replacement of UNSV3 pole Power contactor with 2NO + 2NC auxiliary contacts, coil voltage 220 volts, AC3 rating 16Amps complete all as specified and directed.Make L&T or equievelent model of specified and directed. |
| 66 | Supply fixing and testing in replacement of UNSV3 pole Power contactor with 2NO + 2NC auxiliary contacts, coil voltage 220 volts, AC3 rating 25 Amps complete all as specified and directed .Make L&T or equievelent model |
| 67 | Supply fixing and testing in replacement of UNSV 3 pole Power contactor with 2NO + 2NC auxiliary contacts, coil voltage 220 volts, AC3 rating32 Amps. Complete all as specified and directed . Cat part No SS90935- Type ML-10 of make L&T or equievelent model of specified and directed., |
| 68 | Supply fixing and testing in replacement of UNSV 3 pole Power contactor with 2NO + 2NC auxiliary contacts, coil voltage 220 volts, AC3 rating 50Amps. Complete all as specified and directed .Make L&T or equievelent model |
| 69 | Supply fixing and testing in replacement of UNSV 3 pole Power contactor with 2NO + 2NC auxiliary contacts, coil voltage 220 volts, AC3 rating 70Amps. Complete all as specified and directed. Make L&T or equievelent model of specified & directed |
| 70 | Supply fixing and testing in replacement of UNSV bimetal overload relays directly operated & directly mounted on ML type Power contactor for relay range of 06 to 18 Amps complete all as specified and directed. Make L&T or equievelent model. |
| 71 | Supply fixing and testing in replacement of UNSV bimetal overload relays directly operated & directly mounted on ML type Power contactor for relay range of 19 to 30 Amps complete all as specified and directed. Make L&T or equievelent model |
| 72 | Supply fixing and testing in replacement of UNSV bimetal overload relays directly operated & directly mounted on ML type Power contactor for relay range of 32 to 45 Amps complete all as specified and directed. Make L&T or equievelent model. |
| 73 | Supply fixing and testing in replacement of UNSVdigital type of size 96mm x 96mm, AC Volt meter 0- 500 Volts including wiring with 1.5 Sqmm PVC insulated stranded copper conductor cable complete all as specified and directed. |
| 74 | Supply fixing and testing in replacement of UNSVdigital type of size 96mm x 96mm, AC Amp meter 0- 200 Amps with including 3 Nos C.T of Ratio 200/5 of class-1.0 including wiring with 1.5 Sqmm PVC insulated stranded copper conductor cable complete all as specified and directed. |
| 75 | Supply fixing and testing in replacement of UNSV insulated connectors 4 pole 100 amps rating including testing complete, all as specified and directed |
| 76 | Supply fixing and testing in replacement of UNSV insulated connectors 4 pole 63 amps rating including testing complete, all as specified and directed |
| 77 | Supply fixing and testing in replacement of UNSV Electronic timers415 Volts, 50 Hz, AC supply, with delay period of 9-30-Seconds complete all as specified and directedmake L&T or equievelent model of specified make as approved by the GE |
| 78 | Supply fixing and testing in replacement of UNSVpush button ON/OFF complete in the existing panel Complete connecting electrically all as specified and directed |
| 79 | Supply fixing and testing in replacement of UNSVindicator light red/yellow /green complete in the existing panel Complete connecting electrically all as specified and directed |
| 80 | Supply, fixing, connecting and testing in replacement of UNSVthermostat heating/cooling of any description complete,all as specified and directed. |
| 81 | Supply, fixing, connecting and testing in replacement of UNSV MCCB Triple pole, 250 Amps 415 volts, 50 Hz having breaking capacity 35/36 KA , with adjustable thermal and fixed magnetic setting fixed in existing panel Complete all as specified and directed. Make : L&T /INDO ASIAN/Havells |
| 82 | Supply, fixing, connecting and testing in replacement of UNSVMCCB Triple pole, 200 Amps 415 volts, 50 Hz having breaking capacity 36 KA , with adjustable thermal and fixed magnetic setting fixed in existing panel Complete, all as specified and directed. Make : L&T /INDO ASIAN/Havells |
| 83 | Supply, fixing, connecting and testing in replacement of UNSVMCCB Triple pole, 100 Amps 415 volts, 50 Hz having breaking capacity 25 KA , with adjustable thermal and fixed magnetic setting fixed in existing panel Complete, all as specified and directed. Make : L&T /INDO ASIAN/Havells |
| 84 | Supply, fixing, connecting and testing in replacement of UNSVHoneywell CN7510A2001 valve actuator suitable for existing air cooled air conditioner plant 45 TR complete, all as specified and directed. (Installed at Large OpticsBuilding) |
| 85 | Supplying, installing, testing & commissioning in replacement of 10 HP horizontal centrifugal pump, 3 phase, 50 hz as per existing head complete all as specified and directed. |
| 86 | Supplying, installing, testing & commissioning in replacement of existing BMS (Building Management System) which monitor sensors that measure temperature, humidity, system pressure etc.including existing software testing, controller/server & sensors testing work at site complete all as specified and directed. (Installed at Large Optics Building) |
| 87 | Disconnecting, dismantling and taking out the existing Air conditioner Split type of any description, any make and in any position 1.5 TR/2 TR capacity,both indoor and outdoor unit single phase, strip opening , cleaning and servicing of the AC with using caustic soda/detergent solution, cleaning of suction air filter and coil of indoor unit and brazing the discharge and suction line, reassembling, fixing and testing of the AC complete, all as specified and directed. Note:(Applicable for Sch ‘A’ Item No.1& 2). (i) Window/Split type AC\"s shall be taken from department on \"as and where installed\" basis.(ii) Window/Split type AC\"s are to be maintained for heating as well cooling , where this provision is in the machine. (iii) The spare parts measured & paid separately as supply only rates. Rate for fixing of spare parts (ie compressor, condensing coil, cooling coil & blower motor) under relevant items shall be included in item No.1&2).(iv) The contractor shall ensure and asses at the site any initial maintenance required, to make the allWindow/Split type AC\"s in proper working condition, at the time of taking over and he shall be laible to make all listed handed over units functional. (ii) Charging of gas, if required, shall be measured and paid for separately under appropriate item of Schedule `A\". However, vacuum and pressure leakage testing with nitrogen (N2), if any required, is deemed to be included under the unit rate quoted by the contractor for this item. |
| 88 | Supply only repaired compressor sealed unit of suitable capacity/ model in the unit properly for 1.5/2.0 TR window/Split type AC complete, all as specified and directed by Engineer-in-Charge. (Make : EMERSON COPELAND /L.G / HITACHI / TECUMSEH ) |
| 89 | Supply only new Rotory type compressor sealed unit of suitable capacity/ model in the unit properly for 1.5 TR window/Split type AC complete, all as specified and directed by Engineer-in-Charge. (Make : EMERSON COPELAND /L.G / HITACHI / TECUMSEH ) |
| 90 | Supply only new Rotory type compressor sealed unit of suitable capacity/ model in the unit properly for 2.0 TR window/Split type AC complete, all as specified and directed by Engineer-in-Charge. (Make : EMERSON COPELAND /L.G / HITACHI / TECUMSEH ) |
| 91 | Supply only new condensing coil unit for Split type AC of any type/ any capacity complete, all as specified and directed. (Make : EMERSON COPELAND /L.G / HITACHI / TECUMSEH ) |
| 92 | Supply only blower motor including fan blade, capacitor complete suitable for windo type AC2 ton/ capacity 1/8 HP, 220 Volts, single phasecomplete, all as specified and directed. |
| 93 | Supply only blower motor including fan blade, capacitor complete suitable for split type AC 1.5ton capacity 1/8 HP, 220 Volts, single phasecomplete, all as specified and directed. |
| 94 | M&L for charging refrigerant gas in the system of window/Split type AC of 1.5/2.0 ton capacity complete, all as specified and directed.(Note : The refrigerant gas measured and paid separately under relevant items as applicable as ‘supply only’). |
| 95 | M&L for replacement of unserviceable starting capacitor 80/100 MFD 230 V AC for window/Split type AC 1.5 Ton/2.0 Ton capacity/water cooler complete, all as specified and directed. (Make : Universal/Sarda ) |
| 96 | M&L for replacement of unserviceable running capacitor 36/45/50 MFD 230 V for window/Split type AC 1.5 Ton/2.0 Ton capacity complete, all as specified and directed. (Make : Universal/Sarda ) |
| 97 | M&L for replacement of unserviceable overload protection coil (1622) 230 Volts for window/Split type AC 1.5 Ton/2.0 Ton capacity complete, all as specified and directed. |
| 98 | M&L for replacement of unserviceable Relay (1622) suitable for window/Split type AC 1.5 Ton/2 Ton capacity complete, all as specified and directed. |
| 99 | M&L for replacement of unserviceable capillary tube and stainer for window/Split type AC of 1.5 ton/2 ton capacity complete, all as specified and directed. |
| 100 | M&L for replacement of unserviceable PVC air filter for Split type AC of 1.5 ton/2.0 ton capacity complete, all as specified and directed. |
| 101 | M&L for replacement of unserviceable capacitor for blower motor suitable for window /Split type AC 1.5 ton/2.0 ton capacity complete, all as specified and directed. |
| 102 | M&L for replacement of unserviceable fan blade for blower motor suitable for window /Split type AC 1.5 ton/2.0 ton capacity complete, all as specified and directed. |
| 103 | M&L for replacement of unserviceable swinging motor with louvers as per existing make for Split type AC 1.5 ton/2.0 ton capacity complete, all as specified and directed. |
| 104 | M&L for replacement of unserviceable remote control assembly with PCB plate complete with connections suitable for Split AC 1.5TR/2TR singlephase capacity complete all as specified and directed . |
| 105 | M&L for replacement of unserviceable Inverter PCB for Indoor complete with connections suitable for Split AC 1.5TR/2TR singlephase capacity complete all as specified and directed . |
| 106 | M&L for replacement of unserviceable Inverter PCB for outdoor complete with connections suitable for Split AC 1.5TR/2TR singlephase capacity complete all as specified and directed . |
| 107 | M&L for replacement of unserviceable LCD / LED display unit for Window/split type AC 1.5 / 2.0 ton capacity complete, all as specified and directed. |
| 108 | M&L for replacement of unserviceable 15/20 mm bore PVC flexible conduit complete, all as specified and directed. |
| 109 | Supply and fixing in replacing refrigerant copper tubing5/8\" / 1/2\" dia (as per existing one) with 22 gauge , fixed on wall / ceiling with saddle as per site requirement including making joints by brazing / flairing and checking for any leakage complete, all as specified and directed. |
| 110 | Supply and fixing in replacing refrigerant copper tubing3/8\" / 1/4\" dia (as per existing one) with 22 gauge , fixed on wall / ceiling with saddle as per site requirement including making joints by brazing / flairing and checking for any leakage complete, all as specified and directed. |
| 111 | Supply and fixing in replacment foam type insulation sleeve for copper tubing5/8\" / 1/2\"/ 3/8\" / 1/4\" dia (as per existing one) binding and securing the insulation firmly with copper tubing as per site requirement complete, all as specified and directed. |
| 112 | M&L for replacement of unserviceable reverse cycle valve in window/Splittype AC of 1.5 / 2 TR cap. and welding, brazing with copper tubing and testing complete all as specified and directed. Make : Renutrol/Pacific |
| 113 | M&L for replacement of unserviceable internal wiring of AC, water cooler, refrigerator of any capacity and rewiring the same with 2.5 Sqmm size multi stranded copper cable incl testing checking etc complete all as specified and directed. |
| 114 | Supply only refrigerant gas R-22. |
| 115 | Supply only refrigerant gas 134A. |
| 116 | Supply only refrigerant gas R-407/R-410 (HYDRO CARBON) |
| 117 | M&L for replacement of angular valve of size 1/2\" suitable for split type AC complete. all as specified &directed by Engineer-in-Charge |
| 118 | M&L for replacement of angular valve of size ¼\" suitable for split type AC complete all as specified & directed. |
| 119 | M&L for replacement of angular valve of size 5/8\" suitable for split type AC complete all as specified & directed. |
| 120 | M&L for replacement of angular valve of size 3/8\" suitable for split type AC complete all as specified & directed. |
| 121 | Supply only Remote control for split/ Window type AC of LG/Samsung/existingmake of 1.5 TR/2 TR with battery complete all as specified & directed.. |
| 122 | M & L for dismantling of unserviceable voltage stablizer of capacity 3 KVA/4 KVA/5 KVA in various location for repair/replacement of unserviceable parts, cleaning, servicing, checking, reassembling, testing and handed over to MES in serviceable condition complete all as specified & directed. (Note :- The spare parts measured and paid separately as supply only rates. Rates for fixing of spare parts under relevant items shall be included in item) |
| 123 | Installation only split type AC including indoor/outdoor unit of capacity 1.5 Ton/2 Tonafter carried out the repair under item No.105 & 106atnew location as directed including providing necessary chiseling/ cutting for fix the indoor/outdoor unitby means of suitable size of nut, bolt, angle iron structure, masonry work and making good the disturbed surface withPCC, plastering,white wash works,testing & checking complete all as specified & directed.(Note :- The spare parts measured & paid separately as supply only rates. Rate for fixing of spare parts (ie compressor, condensing coil, blower motor and nut bolt angle iron structure) under relevant items shall be included in this item) complete all as specified & directed. |
| 124 | Supply &Fixing in replacement of unserviceable Oudoor unitbody complete with out compressor unitsuitable for existing Split type AC of 1.5 TR capacity,complete all as specified & directed. |
| 125 | Supply &Fixing in replacement of unserviceableindoor unitbody complete suitable for existing Split type AC of 1.5 TR capacity, complete all as specified & directed. |
| 126 | Supply &Fixing in replacement of unserviceablemild steel work as split type AC outdoor/watercooler wheel stand /supporting /protection cage etc. ofsuitable size of flat iron/Angle iron etc.,cut to shape, including bending and welding as necessary, etc.conforming to Fe.290.Gde-E-165, with andincluding applying two coats of synthetic enamel paint over a coat of red oxide primer complete, all as specified and directed. |
| 127 | Supply &Fixing in replacement of unserviceable plug top3 pin, 15/16 Amp capacity complete all as specified and directed.Make : Anchor (Penta deluxe) or equivalent as approved by GE. |
| 128 | Disconnecting and removing the water and electric connections carefully from the existing Geyser of capacity 25/50 ltrs, any makeand taking out the same in any position from the existing location.cleaning and de-scaling the inner tank using de-scaling solution mixed with water in suitable proportion till the complete deposits /scale is removed as approved by Engineer-in-Charge, brazingfor stopping leakage of copper inner tank/gas welding for inner steel tank, re- assembling the complete Geyser after cleaning,Fixing and installation of Geyser in position and testing to the entire satisfaction of Engineer-in-Charge.Opening the Geyser for inspection, repairs and reassembling the same as per the original assembly after repairs/ replaceing the wourn out unserviceable parts with new parts as orderedincludingre-fixing same position of the Geyser and making electric connection, water inlet and outlet connection, testing andchecking of all the functioning of water inlet outlet valves connected with geysers.complete all as specified & directed. Note :- Spare parts if any requires replacement shall be measured and paid for separately. |
| 129 | Supply only Rubber PVC gasket to ensure water tightness for 25/50 liters capacity complete all as specified & directed. |
| 130 | Supply only MS base plate cup any type with screws of suitable size as per requirement complete all as specified & directed. |
| 131 | Supply only Heating element of the 1.5/ rating as required at site including rubber washers of any make and type complete all as specified & directed. |
| 132 | Supply only Heating element of the /2 KW rating as required at site including rubber washers of any make and type complete all as specified & directed. |
| 133 | Supply only Steelinner tank of 25 litre capacity geyser tank by made out of steel sheets appropriate thickness complete all as specified & directed. |
| 134 | Supply only Steelinner tank of 50 litre capacity geyser tank bymade out of steel sheets appropriate thickness complete all as specified & directed. |
| 135 | Supply only Insulating material (glass wool for Geyser) complete all as specified & directed. |
| 136 | Supply only Non return valve 15 mm dia cast copper alloyISI mark complete all as specified & directed. |
| 137 | Supply only Safety valve/Fusible plug 15mm complete all as specified & directed. |
| 138 | Supply only Chromium plate copper connecting tube 450 mm long with two brass adopters suitable for 15 dia pipe and connecting up complete with washers complete all as specified & directed. |
| 139 | M&L in replacement of unserviceable bottom plate of geysers 25/50 liters capacity, same sizes and shape complete all as specified & directed. |
| 140 | M&L in replacement of unserviceable air release valve 15 mm bore for geyser as per existing typecomplete all as specified and directed. |
| 141 | Supply only assembly type round heating element of the 1.5KW rating as required at site including rubber washers of any make and type complete all as specified & directed. |
| 142 | Supply only assembly type round heating element of the 2 KW rating as required at site including rubber washers of any make and type complete all as specified & directed. |
| 143 | Supply onlyPVC hot and cold connecting tube 600 mm long with two brass adopters suitable for 15 mm dia pipe and fixing in position ,superior quality complete all as specified & directed. |
| 144 | Supply and fixing sheet metal box with MCB 20A and with 3 pin socket and top etc complete all as specified & directed superior quality as approved by Engineer-in-charge. |
| 145 | Supply only Thermostat cut out bellow type with setting range 00°Cto100°Csuitable for230 volts AC, electric supply complete all as specified and directed, Make – Recold / Bajaj,/ Daspass |
| 146 | Supply and fixing fastener of size 3\" /4\" fixing of geyser complete all as specified and directed. |
| 147 | Supply and fixing \"U\" assembly 6 hole for 25 ltr geyser complete all as specified and directed. |
| 148 | Supply and fixing \"U\" assembly6 hole for 50 ltr geyser complete all as specified and directed. |
| 149 | Supply and fixing \"U\" assembly9 hole for 25 ltr geyser complete all as specified and directed. |
| 150 | Supply and fixing \"U\" assembly9 hole for 50 ltr geyser complete all as specified and directed. |
| 151 | Disconnecting , taking down & removing carefully the existing ceiling fan,etc. of any description, any sweep and from any position / locations (i.e. Md Accn/ OTM Accn/ Md Hostel/ Workshop/ Installations etc) for repairs / servicing / overhauling / painting / numbering etc., dismantling & opening of the fans, checking serviceability of parts, overhauling by necessary cleaning, oiling & greasing , fixing the serviceable parts in position, removing & replacement of defective/ unserviceable parts, if any, with new parts, reassembling the fans, making necessaryadjustment and proper alignment of blades, hanging / fixing the repaired fans in position, connecting to existing electric sources and testing at site to the entire satisfaction of Engineer-in-Charge complete, all as specified and directed. |
| 152 | Disconnecting , taking down & removing carefully the existingexhaust fans etc. of any description, any sweep and from any position / locations (i.e. Md Accn/ OTM Accn/ Md Hostel/ Workshop/ Installations) for repairs / servicing / overhauling / painting / numbering etc., dismantling & opening of the fans, checking serviceability of parts, overhauling by necessary cleaning, oiling & greasing , fixing the serviceable parts in position, removing & replacement of defective/ unserviceable parts, if any, with new parts, reassembling the fans, making necessaryadjustment and proper alignment of blades, hanging / fixing the repaired fans in position, connecting to existing electric sources and testing at site to the entire satisfaction of Engineer-in-Charge complete, all as specified and directed. |
| 153 | Disconnecting,taking down and removing carefully the existing table fan, Air circulator wall mounting fan,pedestalfan, of any description, any sweep and from any position / locations for repairs / servicing / overhauling / painting / numbering etc., dismantling & opening of the fans, checking serviceability of parts, overhauling by necessary cleaning, oiling & greasing , fixing the serviceable parts in position, removing & replacement of defective/ unserviceable parts, if any, with new parts, reassembling the fans, making necessaryadjustment and proper alignment of blades, connecting the fans to existing electric sources and testing at site to the entire satisfaction of Engineer-in-Charge complete, all as specified and directed.Note for item 1 to item 3 here in before :(i) The replacement of defective / nonfunctional parts shall be measured & paid for separately as “Supply only” under appropriate item of Sch ‘A’ and fixing charges for new items are deemed to be included under this item. (ii) Burnt out windings replaced, shall be measured and paid for separately under appropriate item of Sch ‘A’ for rewinding.(iii)The rates for above items are deemed to include for transportation to & fro of fans to workshop if required and approved by the Engineer-in-charge for necessary repairs.(iv)Cost of minor repair i.e. loose connection tightening, oiling greasing, tightening nut- bolts, insulating wire etc deemed to be inclusive in the item rate above.(v) Writing of fan No. and painting of fans shall be measured and paid for separatelyunder appropriate item of Sch ‘A’ |
| 154 | Supply only the following new parts suitable for the ceiling/ exhaust fans, wall bracket fans & pedestal fans, air circulating fans etc. of any description, any sweep :- Note :- Fixing & testing charges of these items are deemed to be included in the rates quoted by the tenderer for Sch ‘A’ item No. 153 and 154 above |
| 155 | Supplying only ball bearing No 6200(Make SKF/NRB/NBC) |
| 156 | Supplying only ball bearing No 6201 (Make SKF/NRB/NBC) |
| 157 | Supplying only ball bearing No 6202 (Make SKF/NRB/NBC) |
| 158 | Supplying only ball bearing No 6203 (Make SKF/NRB/NBC) |
| 159 | Supply only gun metal bushes of any description and size to suit existing motor shaft. |
| 160 | Supplying only capacitor of capacity 2.5 mfd (PVC body) (Make:- EPCOS/JYOTI/ USHA) |
| 161 | Supplying only capacitor of capacity 4 mfd(PVC body) (Make:- EPCOS/JYOTI/USHA) |
| 162 | Supply only complete hanging assembly set comprising with rubber reel, MS clamps, nuts, bolts with lock pins suitable for any type of fans & down rods of length 300mm. |
| 163 | Supplying only aluminium cast metal fan blade assembly with necessary MS nuts, bolts & washers suitable for ceiling/ exhaust fans, wall bracket fans & pedestal fans, air circulating fans of any descriptions & of any mm sweep. Note: (i) Set of three blades shall be measured as one unit.(ii) Make of the blade assembly shall be as approved by GE |
| 164 | Supply only PVC insulated and sheathed, round flexible cable, three core of size 0.50 Sqmm with copper conductor in pieces for connecting fans. ( Make :Havell’s / Finolex / Gloster / National/ Plaza ) |
| 165 | Supply only MS tube medium grade 15mm dia duly finished with white colourtwo coats over a coat of red oxide cutting in desired length from 300mm to 1500mm, cutting slot and drilling hole for down rod of fan complete all as specifieda and directed. |
| 166 | Taking out & removing old burnt-out windings of electric fans of any description and rewinding of fan motor with appropriate size super enameled copper wire (Make : Atlas/Finolex/Devi Dayal)as approved by the Engineer-in-charge including insulating material such as illuminous paper, Letherized paper, cotton tape, glass sleeving, insulating varnish etc testing at workshop and transportation to site, connecting and testing on full load to the entire satisfaction of Engineer-in-chargefor the following Fans:- |
| 167 | Rewinding of motor of ceiling fans 1200 mmsweep. |
| 168 | Rewinding of motor of ceiling fans 1400 mmsweep. |
| 169 | Rewinding of motor of exhaust fan of 230/300 mm sweep. |
| 170 | Rewinding of motor of exhaust fan of 450 mm sweep. |
| 171 | Rewinding of motor of wall mounted fan of 400 mm sweep. |
| 172 | Rewinding of motor of air circulating fan of 610 mm sweep. |
| 173 | Rewinding of motor of table fan/ pedestal fan of 400 mm sweep. |
| 174 | Taking down existing worn out louversof any description , in any position and supplying & fixing new louversfor exhaust fan of 230/300mm/ sweepcomplete all as specified & directed. ( Note: The louvers shall be of shape, size and pattern as approved by the Engineer-in-Charge duly painted with two coat of synthetic enamel paint over a coat of red oxide primer) |
| 175 | Taking down existing worn out louversof any description , in any position and supplying & fixing new louversfor exhaust fan of 450mm sweepcomplete all as specified & directed.( Note: The louvers shall be of shape, size and pattern as approved by the Engineer-in-Charge duly painted with two coat of synthetic enamel paint over a coat of red oxide primer) |
| 176 | Disconnecting and taking out old existing unserviceable ceiling fan modular regulator of any description and in any position/ location and supply and fixing ceiling fan modular regulator electronic, step type, 1M size modular type , suitable for ceiling fans of any capacity, pre-wired 230 volts AC 50Hz supplycomplete all as specified and directed. (Make :- Anchor/Cona/Havells/Legrand/HPL) |
| 177 | M & L for painting of existing fans of any description of ceiling fan of 1200/1400mm sweepwith applying one coat of synthetic enamel paint (White) by spray machine including preparation of existing decorated surfaces of fans complete, all as specified and directed. |
| 178 | M & L for painting of existing fans of any description of exhaust fan of 230/300/450mm sweep with applying one coat of synthetic enamel paint grey by spray machine including preparation of existing decorated surfaces of fans complete, all as specified and directed. |
Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail