| 1 | Supply & Delivery Of 150-200 WPSolar panel (ERTL & Flash tested), the module shall contain poly crystalline silicon solar cell and must have a testing confirming to IEC 61215 edition II certified, with building Blocking Diode with 10 years warranty , shall have device life more than 25 years limited power less not more than 10% of nominal output at the end of 10 years and not more than 20% at the end of 25years.The solar module shall be able to withstand the temp extremes ranging from -10*C to + 85*C and the wind load of wind speed @120km/hr. Maximum mean hour rain fall of 40mm, humidity level up to 90% MNRE approved grade solar panel. Cell material - Poly crystal silicon solar cell. Capacity - The power output of the module (s) should not less than 140 Watt peak. the operating voltage corresponding to the power output mention above should be 16.5v .The pcb of the PV module under STC should be at least 21v.calculation under average daily isolation of 5.5KWhr/sq.mt, on a horizontal surface. (MAKE - Philips/ Surya /Benlo/ any MNRE approved) WARRANTY-5 YEARS. |
| 2 | Supply & Delivery Of Battery 12.8V , 36-42 AH Lithium Ferro battery ,with in-built BMS Control technology ,BMS should be >10Amp, DOD>80%. The battery should be of >1600cycle life. (MAKE- Exide/ Philips/ Benlo/ any MNRE approved). WARRANTY-5 YEARS. |
| 3 | Supply & Delivery of 40 watt 5600 Lumenes led flood light 140 Lumen/watt.1.Primary Thermal Managment : single piece MCPCB with thermal pads.2.Secondary Thermal Managemet:High Presure Aluminium Die Cast.3.Driver Efficiency:>85%4.LED Working Voltage 2.9V (700ma current)5.cool white ,warm white6.color Temperature: 5500K-6500K7.working life :50000Hrs8.Dusk –to –Dawn charge controller (inbuilt)9.Certication :ISO10.First 6Hrs 100% Brightness and then 50% Brightness.11. The light source will beof white LED type. The Luminous performance of LEDs use should not be less than 30 lumen/watt. Use of LEDs, Which emit Ultraviolet light, must be avoided. (MAKE- Philips/ Surya/ Benlo/ any MNRE approved)., WARRANTY-5 YEARS |
| 4 | Supply & Delivery of 9 mtr multigonal high mast tower, made from hot dip galvanised and suitable for wind 180km/h, thikness 3 mm,along with climbing function and light holding arm in accordance with BS-745. The arm structure must have provision to adjust its angle of inclination to the horizontal between 0 and 45, so that the module can be oriented at the specified angle.I.Pole hight 9.0 mtr (Bottom Dia 335/280mm, Top Dia 125mm (MAKE- BPP/ Galpole/ Calcutta Pole/ any ISI Make.) |
| 5 | Supply & Delivery of Module mounting structure made with G.I. angle for holding solar panel and withstand wind of 120 km/h. |
| 6 | The pole foundation & erection (Civil work) Erection single GI Modular pole of length as given below with /without sole place & cap etc in ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm) foundation of size 0.5m x 0.5m maximum squre base block below sole plate /pole jhama metal incl. cc (1:3:6) upto 1 meter withM-20, gradeconcreteconsideringSBCofsoilas10T/sqmtr. Incl. supplyof cement,stone chips,Bricks, sand androd etc.withdiggingearthasrequiredasperdirectionof E.I.C. |
| 7 | Supply & Delivery of Cables as per requirement (Havells/ Polycab/ Finolex) and Accessories as required. The electric cable used shall be 3 core PVC insulated copper cable of size 4 sqmm . The size of wire between solar module and battery .The all wire cover by insulating PVC pipe . the battery lead should be provided with the suitable battery clip. |
| 8 | Supply & Delivery of Charge controller : A new generation programmable charge controller to charge the system with maximum operation ability and with facilities like battery over charge cut off system and battery reverse polarity in built system etc. (MAKE- Philips/ Surya/ Benlo/ any MNRE approved), WARRANTY- 5 YEARS |
| 9 | Earthing with 50 mm dia & 3.04 mtr long 3.64 mm thick G.I. pipe . Connection shall be made with 25*5 mm G.I. strips for the mast( Make by TATA medium) |
| 10 | Supply of G.I. strips for earthing of 25* 6 mm |
| 11 | Installation ,Testing & Commissioning of System by using hydra, rope, lodder and truck. |
| 12 | Supply & erection of Informatory Board as per direction of Engineer-in-Charge at foundation with granite plaque. |
| 13 | Sub Total |
| 14 | GST 18% |
| 15 | CESS 1% |