| 1 | CMS Software And Hardware |
| 2 | The range of applications to be monitored by CMS will include, but not be limited to, the following systems Security Operational Applications & Dashboards like: • CCTV & Alarm Monitoring (VMS/NVR) - 800nos• Recording of cameras - 800nos (Upgrade existing or propose new)• Video Analytic Edge based as per camera available.• Plot available Components over given map• Videowall Integration• PA system• IPBAX System• Incident Management dashboard ICCC• Access Control System (Optional -Phase 2)• Fire System (Optional -Phase 2)• FRS System(Optional -Phase 2)• Reporting system • System Health dashboard |
| 3 | The minimum specifciation of Management Server with N:1 Failover with below minimum specification or better as per application need 48 Core (or 16 x3 ) per server Intel Xeon, 144 GB Per Server, 1 Gbit with Redundant network ports, 10TB HDD, 48 PHYSICAL /96 VIRTUAL, Windows Server 2019 R2, Standard Edition or above |
| 4 | Minimum Intel Xeon 10 core Processor, 2.4 GHz or better. RAM 32 GB DDR4 or better.480/512 GB SSD for OS Application (Consider 2 units for Raid1)Video Storage (Consider as actual)NIC: 4x 1GbE or better.OS:Linux/Windows 2016 / Windows 10 PRO or better. |
| 5 | Storage for Surveillance and IT data upto 2PB raw storage with minimum 300 TB usable after RAID 6 configuration. |
| 6 | MS SQL Server Standard Edition 2019 or above |
| 7 | Videowalls and Controller |
| 8 | 55\" Video wall display, 500 Cd/m2, HDMIX 2, 55 Inch , 0.88 mm Bezel to BezelDisplay, USB x 1, 24/7 operation |
| 9 | Video Wall Controller System : Video Wall Controller (Hardware) for connecting 6 x 4K screens 2U display controller, 6 x HD/4K outputs, 6 HD decodes per screen |
| 10 | Display and Panneling |
| 11 | Providing and fixing18mm at Videowall back wall & 12 mm at embosed boxing wooden plywood pasted over GI/wooden frame work upto 150 mm +- deep for wires & channels with all required carpentry work complete.cost including cutting of power plates in new partion - 5nos. |
| 12 | Providing and applying satin black or as per selective laquer glass painting on existing surface as per requirement with all required works complete. |
| 13 | Providing and fixing Skin of 5mm thk black or selective color laqured glass, fixed to the existing base skin ply on partition with smooth edges, glass to be fixed on to the plywood with compatible neutral cure silicon sealant. |
| 14 | Providing and fixing Skin of 5mm thk running border upto 12 inches black or selective color laqured glass, fixed to the existing base skin ply on partition with smooth edges, glass to be fixed on to the plywood with compatible neutral cure silicon sealant. |
| 15 | Miscellaneous like Clamps,Flexible and Accessories |
| 16 | Key Management |
| 17 | Key management Locker for 24 Key slots |
| 18 | CONTROL DESK FOR CMS Operators |
| 19 | Supplyof Workstation with Intel i7 Processor CPU 13th gen 13700 16 CORES ,32GB RAM,1x 480 GB M2. SSD FOR OS ,1x1TB HDD, Windows 10 Prof-64 Bit, Wireless Keyboard and Mouse, NVIDIA QUADRO - 4 GB GPU dual port card with Converter |
| 20 | Supplyof Workstation with Intel i7 Processor CPU 13th gen 13700 16 CORES ,32GB RAM,1x 480 GB M2. SSD FOR OS ,1x1TB HDD, Windows 10 Prof-64 Bit, Wireless Keyboard and Mouse, NVIDIA QUADRO - 4 GB GPU dual port card with Converter |
| 21 | Supplyof Workstation with Intel i7 Processor CPU 13th gen 13700 16 CORES ,32GB RAM,1x 480 GB M2. SSD FOR OS ,1x1TB HDD, Windows 10 Prof-64 Bit, Wireless Keyboard and Mouse, NVIDIA QUADRO - 4 GB GPU dual port card with Converter |
| 22 | Supply of 21\" LED monitor with Spiral Cover wire Horizontally mount with HDMI/DP/Mini DP Cable to Workstation |
| 23 | Supply of CONTROL DESK FOR DUAL MONITOR Folded Construction systemSpecifications 1) Overall Dim:- 680+75+15 (H) X 1500 (W) X 1100(650) (D)mm 2) Material Main Frame - 2mm thk. CRCASide sheet – 1.6mm thk. CRCADesktop – 2mm thk. CRCAFront Door – 1.6mm thk. CRCARear Door – 1.6mm thk. CRCABase frame – 3mm thk. CRCAC.G. Plate – 3mm thk. CRCA4) Cable Entry – Bottom5) Lock – IP Lock 6) Gasket –PU foam7) Antivibration Pad – 15mm thk.8) Finishing- Powder Coating- Min thk. 60Micron a) External - RAL -7035, Soft Grey (Structure finish) b) Internal – RAL -7035, Soft Grey (Structure finish) c) Base Frame – Black9) Access- Front & Rear 10) Electrical Items :-02 Nos. 10A MCB DP01 No. Spike Booster 4Way01 No. Power Socket5/15A02 Nos. Door Switch01 No. LED Tube light 230 V AC, 50Hz02 No. Exhaust Fan 4\" , 230V AC01 No. Toggle Switch01 No. CU Busbar 25x3A/R Terminal Block(UK2.5) Suitable for 2.5sqmm wire, |
| 24 | Office Chair,High Back Mesh Ergonomic Home Office Desk Chair,Adjustable Armrests,Adjustable Lumbar Support,Tilt Lock Mechanism |
| 25 | Surveillance System |
| 26 | Supplyof Fixed lens bullet camera given as per RFP specs. |
| 27 | Supplyof Fixed lens Dome camera given as per RFP specs. |
| 28 | Supplyof VF lens bullet camera given as per RFP specs. |
| 29 | Supply of PTZ camera with Housing given as per RFP specs. |
| 30 | Supply of 9U loaded RACK with UPS required as per site. |
| 31 | Supply of Other Miscellaneous accessories for surveillance system (6 core fiber, CAT 6 Cable, Power Cable, Casing,reinforce pipe,tube,Mounting Plate,tags,feruls,nuts,Bolts and Clamps,C-Terminals,Lugs and Galnd) |
| 32 | Network Active and Passive Components |
| 33 | L2 Managed 24-Port 1G PoE Switch with 04 nos. SFP modules |
| 34 | L2 Managed 08-Port 1G PoE Switch with 02 nos. SFP modules |
| 35 | Next Generation Firewall with minimum 25 Users |
| 36 | NTP Server for processing up to 1200 NTP client requests per second |
| 37 | POE Extender (Base + Edge Unit) |
| 38 | PIPES,CONDUIT AND MISCELLANEOUS ACCESSORIES( D ) |
| 39 | Supply & Installation of Other Miscellaneous for Upgradation of Control Room System (6 core fiber, CAT 6 Cable, Power Cable, Casing,reinforce pipe,tube,Mounting Plate,tags,feruls,nuts,Bolts and Clamps,C-Terminals,Lugs and Galnd)with Control Roomwork finishing wall chipping and Painting for Wall to mounting LED pan |
| 40 | 06mtr pole with required accessiories for fixing the cctv camera. |
| 41 | PROJECT MANAGEMENT AND SERVICES € |
| 42 | Services and Installation for Videowall with proper allignment setting of Bracket |
| 43 | Services and Installation for Interior work and Panelling work with Laquer glass frame |
| 44 | Service for Cabling and rack installation, UPS Installation and Wiring for Videowall and termination |
| 45 | Installation, Testing and Commissioning of CMS, Camera, and other accessories |
| 46 | Project Management including training, documentation and Outlocation charges |