| 1 | Dismantling plain Cementconcrete |
| 2 | Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification. |
| 3 | Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by thedepartmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. |
| 4 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 5 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundationincluding dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification |
| 6 | Random Rubble masonry work in CM 1:5 ( One of cement and five of sand) Using selected stones and bond stones in foundation and basement including dewatering wherever necessary proper setting, curing etc., complete in all respectscomplying with relevant standard Specifications. |
| 7 | Providing form work for shuttering the soffits of all reinforcement cement concrete surfaces including Secondaryting to the required height with M.S.Sheets of 90 x 60cm x 10 gauge stiffened with welded M.S angle of size 25x25x3mm laid over silver oak joints of size 10cm x 6.50cm spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at 75cmcentre to centre complying with standard specification and as directed. |
| 8 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) |
| 9 | Providing and laying in position, standardised concrete Mix M-20 Grade in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials). |
| 10 | a. Foundation and Basement |
| 11 | b. Super Structure |
| 12 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification.(Contractor has to make his own arrangements for the supply of steel and binding wire) |
| 13 | Brick workusing CountryBricks of size 8-3/4\" x 4-1/4\" X2-3/4\"\" in Cement Mortar 1:5 (One cement and five crushed stone sand) including curing neat finishing, etc., complete complying with standard specifiction. |
| 14 | a. Foundation and Basement |
| 15 | b. Ground floor |
| 16 | Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers. |
| 17 | Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stoneSand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers |
| 18 | UPVC WindowSpecification:Supplying and fixing UPVC (Un-Plasticized PolyvinylChloride) Windows of casement type (open) from theprofile the size of outer frame 60mm x 58mm andshutter profile are reinforcement with GI/1mm 125GSMand 100% corrosion free, the profiles are multichambered sections with wall thick of 2mm. The EPDMrubber (black colour) covered with over all the edges offrame and shutter the shutter will be provided withEspag multi power point locks and also it operates ashandle. The corners and joints should be welded andcleaned. Radiations free pin headed plain or browncolour glass 4mm thick should be provided to theshutter and it should not allow leakage of water evenat most ranging storms and should have key lockableaction, security protective hinges, strong lockingsystems and as per size for arresting noise and energyloss. The connecting mechanism between sash andouter frame that enables opening of the window. Thewindow should be fixed to the wall with 100% packingwith screws and silicon packing all round the frames.The window should be got approved from the ExecutiveEngineer before use on work |
| 19 | Supplying and fixing of flush door shuyyer using teak wood frame of size 127mmX76mm and door shutter single leaf in position using 35mm thick solid core flush shutter with teak play on both sides with teak wood lipping alround including cost and labour for fixing the hold fasts and furniture fittings etc complete as directed by the departmental officers complying with std specification. |
| 20 | Best tiled roofing with Mangalore tiles,over ceiling tiles of best qualityincludingCW reepers -10Sqm |
| 21 | Scaffolding charges for Vimanans andgopurams with casurina posts coconut or plamtrees wherever necessaryfor main, form work and providing with coconut keeth coverings, providing ladder arrangements, country wood pland for working, inpection etc, complete hire charges only for erection, maintainance and removing the same on completion of the work1 sq,ft. |
| 22 | Scraping the decayed lime plaster from the surface of wall. |
| 23 | Scraping the decayed lime plaster from the surface of Vimanams and Gopurams, carefully including isolated bricks or brickwork without damaging the vari vargams, racking out the joints, cleaning the surface with water, includinng all working in heights, hire charges for special tooks, brushes complete superficial area including all folds - 100sft. |
| 24 | Plastering with Lime Mortar 1:1.5 (One Lime and One and Half Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. |
| 25 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. |
| 26 | Washing of plastered surface with soap, soda and water (or with soda lime, brush and water) |
| 27 | Supplying and fixing mild steel grills for windows, ventilators, rtc., including priming coat and cost and conveyance of all material and labour charges etc., complete. |
| 28 | Supplying and fixing in position 15mm dia brass CP screw down tap / Pillar tap (heavy duty) of approved make conforming to BIS specifications and quality including cost of shellac, thread, etc., complete complying with standard specification and including cutting and threading wherever necessary.(Taps should be got approved by the Executive Engineer before use on the works) |
| 29 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 30 | Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Combination Mortor1:1:4 complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plasteringwith Combination Mortor1:1:4 and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area.for kalkaram The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.(upto 25\"ft) |
| 31 | Providing new sudhai vigrahams in the vimanams and Rajagopurams with galvanised iron rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in Lime Mortor1:1.5 finishing the same with Lime Mortor1:1.5bringing to the correct shape (Lakshana) in conformift with silpa sastra inclusive of special ornaments, wiapons, peedam etc., complete and providing C.M. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and G.I. rods.binding wire all labour for working in heights, curing lifiting of materials etc., complete including Panchavarnam 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is pt\rovided the rate with peetam may be adopted as datailed hereunder) The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works. |
| 32 | a. Sudhai size above1\" 0\" upto 2\" 6\" |
| 33 | b. Sudhai size above2\" 6\" upto 3\" 6\" |
| 34 | Painting with Water based exterior emulsion paintcomplete for the Vinamans/Gopurams, inculding costand conveyence of all materials, lobour charges inculdinf Artist painter, working in heights, lifting of material, cost of brushes etc,complete-which including all extra for foldings-100sft, superficial area. |
| 35 | Painting two coats with Exterior Emulsion paint of first class quality and approved colour, including priming coat and through scrapping and clean removal of dirt etc., complete as per standared specification. |
| 36 | Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over one coat of red oxide priming coat in all floors including cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) |
| 37 | Flooring with cut stone slab off size 0.60 x 0.60m and other sizes suitable for site requirement not less than 100mm thick with machine ccut edges and top surface dressed as ddirected by the deparment officers including cost and conveyance of all materials to site and labour charges for paving and pointing with cement mortar 1:5 et., complete as per tandard specifications. |
| 38 | a. Single Line Dressing |
| 39 | b. Three Line Dressing |
| 40 | Paving the floor with fine polished cuddapah stone slab of following thickness over Cement Mortar 1:3 (One Cement and Three crushed stone Sand) 20mm thick over the existing bed of Cement Concrete 1:5:10, (One Cement, Five crushed stone sandand Ten aggregate) and pointing the joints to full depth of slabs with same mortar mixed with black oxide and the top surface rendered smooth, curing, etc., The cuddapah stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete complying with standard specification. |
| 41 | Wiring with 2 x 1.5 sq.mm. (22 / 0.3) PVC insulated unsheathed single core copper conductor of 1100V grade insuitable PVC rigid pipe on wall and ceiling with PVC accessories with TW switch box with 5A FT switch inflush withwall covered with hylem sheet of 3mm thick with painting of suitable colour for open PVC light point / fan point (forelectronic regulator) |
| 42 | Supply and fixing of 4\"40W twin box type fluorescent fittting complete with copper choke and condensor with conduitpipe suspension from ceiling with PVC unsheathed copper leads from terminals to the fitting with fluorescent Tubes |
| 43 | Gst 18% |