Tender For Infrastructure Development Works In Madukka Trdm Settlement Nagar, Chakirimedu In Koruthodu Panchayath , Kanjirappally Block In Kottayam District.
Tender Overview
Project Description
Infrastructure Development Works In Madukka Trdm Settlement Nagar, Chakirimedu In Koruthodu Panchayath , Kanjirappally Block In Kottayam District. 1.Retaining Wall 1.50M Ht. 42M 2.Retaining Wall 1.00M Ht. - 23M 3.Retaining Wall 1.20M Ht. - 20M 4.Retaining Wall 2.55M Ht. - 17M 5.Retaining Wall 2.00M Ht. - 33M 6.Retaining Wall 0.50M Ht. 5M
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 21-Jan-2025 | Infrastructure devolopment works in Madukka TRDM settlement Nagar, Chakirimedu in Koruthodu panchayath , Kanjirappally Block in Kottayam District. | Date | 25-Jan-2025 |
| 2 | 27-Jan-2025 | Infrastructure devolopment works in Madukka TRDM settlement Nagar, Chakirimedu in Koruthodu panchayath , Kanjirappally Block in Kottayam District.1 | Date | 30-Jan-2025 |
BOQ
| Sl. No. | Item Description |
| 1 | Retaining wall 1.50 M Ht.-42M |
| 2 | 2.6.1Earth work in excavation by mechanical means (Hydraulic excavator)/manual meansover areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposedearth to be levelled and neatly dressed.All kinds of soil |
| 3 | OD1062/2024-2025DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site |
| 4 | 5.9.1Centering and shuttering including strutting, etc. and removal of form for:Foundations,footings, bases of columns, etc for mass concrete |
| 5 | 5.22.6 Steel reinforcement for RCC work including straghtening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more |
| 6 | 5.1.2 Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work upto plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mmnominal size |
| 7 | Retaining wall 1.00 M Ht.- 23 M |
| 8 | 2.6.1Earth work in excavation by mechanical means (Hydraulic excavator)/manual meansover areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposedearth to be levelled and neatly dressed.All kinds of soil |
| 9 | OD1062/2024-2025DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site |
| 10 | 5.9.1Centering and shuttering including strutting, etc. and removal of form for:Foundations,footings, bases of columns, etc for mass concrete |
| 11 | 5.22.6 Steel reinforcement for RCC work including straghtening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more |
| 12 | 5.1.2 Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work upto plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mmnominal size |
| 13 | Retaining wall 1.20 M Ht.- 20 M |
| 14 | 2.6.1Earth work in excavation by mechanical means (Hydraulic excavator)/manual meansover areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposedearth to be levelled and neatly dressed.All kinds of soil |
| 15 | OD1062/2024-2025DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site |
| 16 | 5.9.1Centering and shuttering including strutting, etc. and removal of form for:Foundations,footings, bases of columns, etc for mass concrete |
| 17 | 5.22.6 Steel reinforcement for RCC work including straghtening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more |
| 18 | 5.1.2 Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work upto plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mmnominal size |
| 19 | Retaining wall 2.55 M Ht.- 17 M |
| 20 | 2.6.1Earth work in excavation by mechanical means (Hydraulic excavator)/manual meansover areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposedearth to be levelled and neatly dressed.All kinds of soil |
| 21 | OD1062/2024-2025DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site |
| 22 | 5.9.1Centering and shuttering including strutting, etc. and removal of form for:Foundations,footings, bases of columns, etc for mass concrete |
| 23 | 5.22.6 Steel reinforcement for RCC work including straghtening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more |
| 24 | 5.1.2 Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work upto plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mmnominal size |
| 25 | Retaining wall 2.00 M Ht.- 33 M |
| 26 | 2.6.1Earth work in excavation by mechanical means (Hydraulic excavator)/manual meansover areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposedearth to be levelled and neatly dressed.All kinds of soil |
| 27 | OD1062/2024-2025DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site |
| 28 | 5.9.1Centering and shuttering including strutting, etc. and removal of form for:Foundations,footings, bases of columns, etc for mass concrete |
| 29 | 5.22.6 Steel reinforcement for RCC work including straghtening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more |
| 30 | 5.1.2 Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work upto plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mmnominal size |
| 31 | Retaining wall 0.5 M Ht.- 5 M |
| 32 | 2.6.1Earth work in excavation by mechanical means (Hydraulic excavator)/manual meansover areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposedearth to be levelled and neatly dressed.All kinds of soil |
| 33 | OD1062/2024-2025DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site |
| 34 | 5.9.1Centering and shuttering including strutting, etc. and removal of form for:Foundations,footings, bases of columns, etc for mass concrete |
| 35 | 5.22.6 Steel reinforcement for RCC work including straghtening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more |
| 36 | 5.1.2 Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work upto plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mmnominal size |
| 37 | nominal size |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.