| 1 | Site Clearing For Recharge shaft & etc. Complete. As per Market Rate |
| 2 | Providing and drilling for bore well of stre 300 m die. In Soft rock/ boudary rock/hard rock etc, complete. Borewell By Rotary Deitling method, with transportation of Rig machine to site (Ref. Directorate GSDA. Pune Approved Rates for 2022-2023 vide GSDA Circular |
| 3 | Providing 180 mm Dia. (8 kg/cm) PVC casting pipe (TS 4985-1988) etc. complete in Bouldery formation Ref. Directorate GSDA Pune Approved Rates for 2022-2023 vide GSDA Circular (Aavedhan/Kasha 2 Vindhan Kam Dar Nischipantka kr 45/4735/2022, Dr-19/09/2022), Annexure-8, Page No. 2. Sr. ND- U21(Basic rate Rs 1306.78-18% GST R R2352204-Rx1542) |
| 4 | Labour Charges to make Weep holes to PVC Casing Pipe As per Instruction. As per Market Rate (Base rate Rs.456.42-18% GST R. Rs.82.1556-Rs.539) |
| 5 | Lowering180 mm Dia. (6 kgicm) PVC casing pipe (15 4985-1988) tc. till 12 m depth, complete. Ref. Directorate. G.SDA. Pune Approved Rates for 2022 2023 vide GSDA Chudar Aavedhan/Kasha 2 Vindhan Kam Dar Nischuspanja kr 45/4735/2022, D-19/08/2022), Annexure B. Page No-2. St. NO- Usa) (Basic rate Ra92.37-18% GST R R164266-Rs.109) |
| 6 | After completion of drilling work. Yield Test by Air ift Method and 90 Degree V-Notch for half hours etc. complete. Ref. Directorate, G.S.D.A. Pune Approved Rates for 2022 2023 vide GSDA Circular (Aavedhan Kesha-2/ Vindhan Kam Dar Nischiti/panjika kr.- 45/4735/2022, D-19/09/2022), Annexure-B. Page No-1, Sr. NO. AZ(Basic rate 1740/- including GST) |
| 7 | Providing and Fixing Endcap of PVC casting pipe etc. complete [Ref. Directorate, G.S.DA Pune Approved Rates for 2022 2023 vide GSDA Circular (Aavedhan/Kasha-27 Vindhan Kam Dar Nischitt\"panjka kr-45/4735/2022, D-19/09/2022), Annexure-B, |
| 8 | Excavation In all kind of Soll including boulders for filter pit etc. |
| 9 | Excavation In Hard marum including boulders for filter pit etc. Complete |
| 10 | Excavation in Soft rock including boulders for filter pit etc,complete. (Ref. Water Resource Dept.CSR 2021-22, Section-2 Sr.No.3, Page No- 201( Basic rate Rs.128-18% GST Rs Rs.23.04-Rs.151) |
| 11 | Providing Chicken Mesh of wrapping around the PVC casing pipe Including 5% fabrication losses etc. complete. [Ref. SOP of GSDA Pune on Page No. 36, Filter Pit Sr. No. 7(Ref P.W.D. Schedule of Rates 2020 21 Bd-T Sr. No.21, Page no. 458]( Basic rate Rs.65.12 18% GST Rs. R.11.7216-Rs.77) |
| 12 | Providing R.C.C. pipes in standard 2.5 M lengths of NP-II class and 1200 mm diameter 70 mm thick and with 100 mm weep holes for water percolation Including materials labours transportation required etc. complete as directed by Engineer in-charge. Ref. MJP Schedule of Rates 2021-21. Section-1(V):R.C.C Pipes, Page No.-97, St. No Idxvilll(Basic rate Rs.4963-18% GST Rs Rs.893.31-Rx.5856) |
| 13 | Lowering, laying and jointing in proper grade and alignment R.C.C. pipes with collar Joints in C.M. 1:1 proportion including cost of conveyance from stores to site of work, cost of jointing material, labour, etc, compete as directed by Geologist in charge. Ref. MUP Schedule of Rates 2021-21, Section-1(V) RCC Pipes, Page No-98, Sr. No.-2xvill)(Basic rate Rs.1033-18% GST Rs. Rs.185.94- Rs.1219) |
| 14 | Providing & Filling 40 mm guage pebbles as filter media Inside Pi and inside RCC pipe. [Ref. MJP Schedule of Rates 2021-22 section M. Sr.No.10 a. Page No-2301( Basic rate Rs.1688 18% GST Rs. Rs.303.84-Rs.1992) |
| 15 | Providing & Filling 12-20 mm guage pebbles as filter media inside Pit and inside RCC pipe. [Ref. MJP Schedule of Rates 2021-22 section M. Sr.No.10 b, Page No: 2301( Basic rate Rs. 1988-18% GST R Rs.357.84-Rs.2346) |
| 16 | Providing & Filling 6-12 mm guage pebbles as fiber media inside fiter pit and Inside RCC Pipe. [Ref. MJP Schedule of Rates 2021- 21 Section-1(XXI) Page no 230 Item No-10(C)( Basic rate Rs.22:39 +18% GST Rs. Rs.403.02-Rs.2642) |
| 17 | Providing and laying in situ Cement Concrete Cover Cap with GSDA Embossing of trap/ granite/quartzite /gneiss metal for RCC work in foundation like ralt, grillage, strip foundation and footing of RCC columns and steel stanchions including normal dewatering, form work, compaction, finishing and curing, etc. complete in RCC M-150. Providing and fixing RCC precast cover in RCC 1:24 proportion 1.20.M dia and 100 mm thick with 100 mm weep holes including materials labours transportation required etc. completed as directed by Geologist-In-charge 11 0.785 (1.2 1.2) 0.10-0.1130). Ref. MJP Schedule of Rates 2021-21. Section G: PCC RCC, Page No.-49, Sr. No-2jaj Basic rate Rs.6604 18% GST Rs Rs.1188.72-Rs.7793) |
| 18 | Photography & Video Shooting etc. complete per Recharge Shaft (min. 3 Photos & Video Shooting Le.. Initial stage, work in progress stage and completion stage each) (Ref. SOP of GSDA. Basic rate Rs. 150(Per Photo & Video Shooting) 3 Photos - Rs. 4501 Basic rate Rs.450 18% GST Rs Rs81-R531) |