| 1 | Supply of following material required forheight raising work between LOC No. 153 to 157 of132 KV Sirathu-Manauri & 132 KV Sirathu-Manjhanpur DC line Under ETD-IV, Prayagraj |
| 2 | Supply of GI tower part Including stubs (C+0-02No, C+10-02Nos) |
| 3 | Nuts, Bolts& washer suitable for above GI tower parts |
| 4 | Accessories for tower |
| 5 | Number Plates |
| 6 | Phase Plate |
| 7 | Danger Board |
| 8 | Circuit plate (set of two) |
| 9 | Earthing material pipe type |
| 10 | Accessories for ACSR Panther Conductor. |
| 11 | Vibration Damper |
| 12 | Mid span compression joint |
| 13 | Repair sleeve |
| 14 | Performed armour rod |
| 15 | Hardware and insulator |
| 16 | Compression type Single Tension fitting with D-shackle suitable for ACSR Panther Conductor. |
| 17 | Compression type Double Tension fitting with D-shackle suitable for ACSR Panther Conductor. |
| 18 | Disc Insulator 120KN |
| 19 | OPGW Wire Accessories |
| 20 | Hardware for OPGW 24 fibre |
| 21 | Joint Box(24 Fibre) |
| 22 | 24 fibre OPGW Fibre Optic Cable |
| 23 | Following work required for height raising of 132 KV Manajhanpur-Sirathu & 132 KV Sirathu-Manauri DC Line under ETD-IV, Prayagraj. |
| 24 | Dismantling of all 3phase of existing ACSR Panther conductor, all Hardware fittings & Accessories e.g., armor rod, Vibration damper, insulator string etc. of existing line and re-rolling of dismantled conductor on empty drum for reuse, safely transportation of all removed material to UPPTCL store. |
| 25 | Dismantling of OPGW/Earthwireby using suitable T&P and skilled labors, complete with all allied works required for diversion of line. |
| 26 | Dismantling of entire tower with foundation including cutting of weilded nuts &bolts & all fabrication works. |
| 27 | Carriage of all dismantled materials like tower parts, earth wire, disc insulator and other minor work to be done for completion of the work distance approx.- 30 Km. This works also include loading of dismantaled material from site by using hydraulic crane/manpower and unloading at S/S Storewith stacking of tower parts and rolling of OPG in drum as per direction of SDO/JE upto complition of job satisfactorly. |
| 28 | Survey including preparation of schedule of materials, marking of locations(route length ), GPS survey of line with co-ordinates of each tower (the length of line shall be authenticated by GPS survey. |
| 29 | Check survey including final peg marking. |
| 30 | Soil investigation of foundation pits including all earth work with all technical aspects etc. (Kit will be provided by contractor on their own cost). |
| 31 | Excavation of foundation pits including all earth work, backfilling & leveling etc. |
| 32 | Setting of stubs of tower foundation with help oftemplate & all other associated T&P material will be provided by contractor at his own cost. |
| 33 | DC+0and DC+10 Type |
| 34 | Cost of concreting for all type of foundation including cost of dewatering, shoring, shuttering ramming and curing excluding cost or reinforcement bars but including cost of cement and all other materials with. |
| 35 | 1:2:4 mix, RCC concreting |
| 36 | Installation of steel reinforcement bars in R.C.C foundation including cost of steel cutting, bending, placing, binding etc. |
| 37 | Transportation of all line material from UPPTCL store to work site carriage of all required material from store to work site including loading, unloading, shifting, counting, sorting and proper stacking including transportation through local carriers as well. As head load etc. as per site condition including its proper temporary storage with care of safety by providing choukidar through completion of all the work. (approx. distace 30 Km. ) |
| 38 | Erection of super structures of 132 KV towers and their extensions wherever required including all work above ground level excluding hoisting of insulator, hardware & accessoriesbut including fitting of danger number plate, phase plate & punching of nuts & bolts. |
| 39 | Tack welding of all the bolts up to the height of one section of the tower or 5 meters from ground level whichever is higher with three tacks at 1200 separation of minimum 10mm thickness with 3.15/4mm electrode and application of zinc rich Al. paints on the affected surface including cost of all material (including tack welding of tower). |
| 40 | Laying stringing, tensioning, clamping, jointing etc. of ACSRpanther conductors complete including hoisting of insulators, fitting of all necessary hardware and accessories i.e. fitting, Armourd rods, vibration dampers etc.on all three phases. |
| 41 | All six phase of 132 KV DClines |
| 42 | Installation, Laying, test & commissioning, Splicingof Joint Box of links etc.of 24 Fiber (DWSM) OPGW Fibre Optic cable alongwith all necessary Hardware sets excluding Joint Box. |
| 43 | Dismantaling of earlier foundationwhich include exavation, breaking of foundationupto 2mtr depth and removal of concreate, cutting, removing of stuband steel reinforcement, backfilling, levelling and making field suitable for agriculture. |
| 44 | Grounding work including earthwork etc. for pipe type grounding excluding cost earthing materials. |