Tender For Retrofitting Of Gps Kundi-Dhar Block A (Sr. No. 1 To 20), Gps Kundi-Dhar Block B (Sr. No. 21 To 36), Gps Dand Block A (Sr. No. 37 To 54),Gps Dand Block B (Sr. No. 55 To 69), Gps Dand Block C (Sr. No. 70 To 87)

Issued by Boards / Undertakings / PSU · chamba, Himachal Pradesh
Tender Value
28.81 Lakhs
Estimated cost
Bid Submission
17 Jan 2025
0 days left
EMD
59700
Bank guarantee accepted
Document Fee
1500
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
chamba → Himachal Pradesh
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender For Retrofitting of GPS Kundi-Dhar Block A (Sr. No. 1 to 20), GPS Kundi-Dhar Block B (Sr. No. 21 to 36), GPS Dand Block A (Sr. No. 37 to 54),GPS Dand Block B (Sr. No. 55 to 69), GPS Dand Block C (Sr. No. 70 to 87)

BOQ

Name of Work: etrofitting of GPS Kundi-Dhar Block A (Sr. No. 1 to 20), GPS Kundi-Dhar Block B (Sr. No. 21 to 36), GPS Dand Block A (Sr. No. 37 to 54),GPS Dand Block B (Sr. No. 55 to 69), GPS Dand Block C (Sr. No. 70 to 87)
Sl. No. Item Description
1Demolishing cement concrete manually/ by mechanical means including disposal of material within all leads as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
2Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within all leads. All kinds of soil.
3Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within all leads.
4Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level and up to floor two level. 1:4:8 (1 Cement : 4 coarse sand : 8)graded stone aggregate 40 mm nominal size)
51:3:6 (1 Cement : 3 coarse sand) : 6 graded stone aggregate 20 mm nominal size)
6Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level and up to floor two level. Hot rolled deformed bars
7Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size)
8Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
9Columns, Pillars, Piers, Abutments, Posts and Struts and up to floor two level.
10Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc
11Providing and fixing hard drawn steel wire fabric of size 75x25 mm mesh or other suitable size wire mesh to be fixed & firmly anchored to the concrete surface by means of “L” shaped mild steel shear key welded with existing reinforcement including the cost of materials, labour, tool & plants as approved by Engineer-in-charge.
12CEMENT PLASTER (IN COARSE SAND) 20 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand)
13Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Proposed Angle Iron Braces (50 x 50 x 6) @ 4.5 kg/Mt
14Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqm : 12 mm average thickness.
15Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specificationsTwo or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr /10 sqm
16Painting wood work with Deluxe Multi Surface Paint of required shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @0.75 ltr/10 sqm of approved brand and manufacture
17Providing and injecting approved grout in proportion recommended by the manufacturer into cracks/honeycomb area of concrete/ masonry by suitable gun/pump at required pressure including cutting of nipples after curing etc. complete as per directions of Engineer-inCharge. (The payment shall be made on the basis of actual weight of approved grout injected.) Stirrer mixed Acrylic Polymer of approved make @ 2% of weight of cement used) modified Cement slurry made with non shrink compound in concrete/RCC work
18Providing and fixing plain multipurpose cement board(Hight pressure steam cured) with suitable screws for cement particle board in ceiling etc. complete (frame work to be paid seperatately) 6 mm thick Cement fiber board as per IS: 14862
19Electrical fitting charges( per room)
20Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. MS Frame for water tank-1000 ltr (50x50x5mm Angle Iron Frame)
21Demolishing cement concrete manually/ by mechanical means including disposal of material within all leads as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
22Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within all leads.
23Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level and up to floor two level. 1:4:8 (1 Cement : 4 coarse sand : 8)graded stone aggregate 40 mm nominal size)
24Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level and up to floor two level. Hot rolled deformed bars
25Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size)
26Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
27Columns, Pillars, Piers, Abutments, Posts and Struts and up to floor two level.
28Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc
29Providing and fixing hard drawn steel wire fabric of size 75x25 mm mesh or other suitable size wire mesh to be fixed & firmly anchored to the concrete surface by means of “L” shaped mild steel shear key welded with existing reinforcement including the cost of materials, labour, tool & plants as approved by Engineer-in-charge.
30CEMENT PLASTER (IN COARSE SAND) 20 mm cement plaster of mix :1:4 (1 cement: 4 coarse sand)
31Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts integral crystalline slurry : 1 part water) for horizontal surfaces and applying the same from negative (internal) side with the help of synthetic fiber brush. The material shall meet the requirements as specified in ACI- 212-3R-2010 i.e by reducing permeability of concrete by more than 90% compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline slurry shall be capable of self-healing of cracks up to a width of 0.50mm. The work shall be carried out all complete as per specification and the direction of the engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage. For horizontal surface one coat @1.10 kg per sqm.
32Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqm : 12 mm average thickness
33Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specificationsTwo or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr /10 sqm
34Painting wood work with Deluxe Multi Surface Paint of required shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @0.75 ltr/10 sqm of approved brand and manufacture
35Providing and injecting approved grout in proportion recommended by the manufacturer into cracks/honeycomb area of concrete/ masonry by suitable gun/pump at required pressure including cutting of nipples after curing etc. complete as per directions of Engineer-inCharge. (The payment shall be made on the basis of actual weight of approved grout injected.) Stirrer mixed Acrylic Polymer of approved make @ 2% of weight of cement used) modified Cement slurry made with non shrink compound in concrete/RCC work
36Electrical fitting charges(per room)
37Demolishing cement concrete manually/ by mechanical means including disposal of material within all leads as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
38Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil asdirected, within all lead All kinds of soil.
39Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within all leads.
40Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level and upto floor two level. 1:4:8 (1 Cement : 4 coarse sand : 8)graded stone aggregate 40 mm nominal size)
411:3:6 (1 Cement : 3 coarse sand) : 6 graded stone aggregate 20 mm nominal size)
42Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level and upto floor two level. Hot rolled deformed bars
43Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size)
44Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
45Columns, Pillars, Piers, Abutments, Posts and Struts and upto floor two level.
46Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
47Cement plaster (in coarse sand) 20 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand)
48Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete Proposed Angle Iron Braces (50 x 50 x 6) @ 4.5 kg/Mt
49Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqm 12 mm average thickness.
50Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr /10 sqm
51Painting wood work with Deluxe Multi Surface Paint of required shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @0.75 ltr/10 sqm of approved brand and manufacture
52Providing and injecting approved grout in proportion recommended by the manufacturer into cracks/honeycomb area of concrete/ masonry by suitable gun/pump at required pressure Stirrer mixed Acrylic Polymer of approved make @ 2% of weight of cement used) modified Cement slurry made with non shrink compound in concrete/RCC work including cutting of nipples after curing etc. complete as per directions of Engineer-inCharge. (The payment shall be made on the basis of actual weight of approved grout injected.)
53Electrical fitting charges(per room)
54Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. MS Frame for water tank-1000 ltr (50x50x5mm Angle Iron Frame)
55Demolishing cement concrete manually/ by mechanical means including disposal of material within all leads as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
56Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil asdirected, within all lead.All kinds of soil.
57Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level and upto floor two level. 1:4:8 (1 Cement : 4 coarse sand : 8)graded stone aggregate 40 mm nominal size)
581:3:6 (1 Cement : 3 coarse sand) : 6 graded stone aggregate 20 mm nominal size)
59Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level and upto floor two level. Hot rolled deformed bars
60Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size)
61Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc
62CEMENT PLASTER (IN COARSE SAND) 20 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand)
63Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Proposed Angle Iron Braces (50 x 50 x 6) @ 4.5 kg/Mt
64Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqm 12 mm average thickness
65Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specificationsTwo or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr /10 sqm
66Painting wood work with Deluxe Multi Surface Paint of required shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @0.75 ltr/10 sqm of approved brand and manufacture
67Providing and injecting approved grout in proportion recommended by the manufacturer into cracks/honeycomb area of concrete/ masonry by suitable gun/pump at required pressure including cutting of nipples after curing etc. complete as per directions of Engineer-inCharge. (The payment shall be made on the basis of actual weight of approved grout injected.) Stirrer mixed Acrylic Polymer of approved make @ 2% of weight of cement used) modified Cement slurry made with non shrink compound in concrete/RCC work
68Providing and fixing plain multipurpose cement board(Hight pressure steam cured) with suitable screws for cement particle board in ceiling etc. complete (frame work to be paid seperatately). 6 mm thick Cement fiber board as per IS: 14862
69Electrical fitting charges(per room)
70Demolishing cement concrete manually/ by mechanical means including disposal of material within all leads as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
71Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within all lead. All kinds of soil.
72Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within all leads.
73Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level and upto floor two level. 1:4:8 (1 Cement : 4 coarse sand : 8)graded stone aggregate 40 mm nominal size)
741:3:6 (1 Cement : 3 coarse sand) : 6 graded stone aggregate 20 mm nominal size)
75Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level and upto floor two level. Hot rolled deformed bars
76Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size)
77Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
78Columns, Pillars, Piers, Abutments, Posts and Struts and upto floor two level.
79Providing and fixing hard drawn steel wire fabric of size 75x25 mm mesh or other suitable size wire mesh to be fixed & firmly anchored to the concrete surface by means of “L” shaped mild steel shear key welded with existing reinforcement including the cost of materials, labour, tool & plants as approved by Engineer-in-charge.
80CEMENT PLASTER (IN COARSE SAND) 20 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand)
81Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts integral crystalline slurry : 1 part water) for horizontal surfaces and applying the same from negative (internal) side with the help of synthetic fiber brush. The material shall meet the requirements as specified in ACI- 212-3R-2010 i.e by reducing permeability of concrete by more than 90% compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline slurry shall be capable of self-healing of cracks up to a width of 0.50mm. The work shall be carried out all complete as per specification and the direction of the engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage. For horizontal surface one coat @1.10 kg per sqm.
82Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Proposed Angle Iron Braces (50 x 50 x 6) @ 4.5 kg/Mt
83Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqm 12 mm average thickness.
84Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specificationsTwo or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr /10 sqm
85Painting wood work with Deluxe Multi Surface Paint of required shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @0.75 ltr/10 sqm of approved brand and manufacture
86Providing and injecting approved grout in proportion recommended by the manufacturer into cracks/honeycomb area of concrete/ masonry by suitable gun/pump at required pressure including cutting of nipples after curing etc. complete as per directions of Engineer-inCharge. (The payment shall be made on the basis of actual weight of approved grout injected.) Stirrer mixed Acrylic Polymer of approved make @ 2% of weight of cement used) modified Cement slurry made with non shrink compound in concrete/RCC work
87Electrical fitting charges(per room)

AI Tender Summary

OUR REF NO 47111983
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 28.81 Lakhs
LAST DATE 17-01-2025
Authority
Authority Name Himachal Pradesh School Education Society
Work Description Tender For Retrofitting of GPS Kundi-Dhar Block A (Sr. No. 1 to 20), GPS Kundi-Dhar Block B (Sr. No. 21 to 36), GPS Dand Block A (Sr. No. 37 to 54),GPS Dand Block B (Sr. No. 55 to 69), GPS Dand Block C (Sr. No. 70 to 87)
Basic Detail
Tender No NO. 7120-23 Dated 30.12.2024
Bidding Type Tender
Location
City chamba
State Himachal Pradesh
Key Dates
Publish Date 08 Jan 2025
Submission Date 17 Jan 2025
Open Date 17 Jan 2025
Finance
Tender Value 28.81 Lakhs
Tender Fee 1500
EMD 59700
Exemption Available
Document List
88fdbc70-ed1a-4501-91ad-36d6ea191b2a.html
Biddocument.pdf
BOQ_143398.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jan 08, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
Jan 17, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jan 17, 2025

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

88fdbc70-ed1a-4501-91ad-36d6ea191b2a.html

pdf

Biddocument.pdf

xls

BOQ_143398.xls

pdf

Tendernotice_1.pdf