Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
chamba → Himachal Pradesh
EMD Exemption
Available
Quantity
Not Available

Project Description

Retrofitting of GMS Garima Block A (Sr. No. 1 to 19), GMS Garima Block B (Sr. No. 20 to 35), GPS Serkaow Block A (Sr. No. 36 to 52),GPS Serkaow Block B (Sr. No. 53 to 68), GPS Thalla (Sr. No. 69 to 86

BOQ

Name of Work:Retrofitting of GMS Garima Block A (Sr. No. 1 to 19), GMS Garima Block B (Sr. No. 20 to 35), GPS Serkaow Block A (Sr. No. 36 to 52),GPS Serkaow Block B (Sr. No. 53 to 68), GPS Thalla (Sr. No. 69 to 86)
Sl. No. Item Description
1Demolishing cement concrete manually/ by mechanical means including disposal of material within all leads as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
2Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within all leads.All kinds of soil.
3Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within all leads.
4Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level and up to floor two level. 1:4:8 (1 Cement : 4 coarse sand : 8)graded stone aggregate 40 mm nominal size)
51:3:6 (1 Cement : 3 coarse sand) : 6 graded stone aggregate 20 mm nominal size)
6Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level and up to floor two level. Hot rolled deformed bars
7Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size)
8Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
9Columns, Pillars, Piers, Abutments, Posts and Struts and up to floor two level.
10Providing and fixing hard drawn steel wire fabric of size 75x25 mm mesh or other suitable size wire mesh to be fixed & firmly anchored to the concrete surface by means of “L” shaped mild steel shear key welded with existing reinforcement including the cost of materials, labour, tool & plants as approved by Engineer-in-charge.
11CEMENT PLASTER (IN COARSE SAND) 20 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand)
12Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqm :12 mm average thickness
13Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
14Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specificationsTwo or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr /10 sqm
15Painting wood work with Deluxe Multi Surface Paint of required shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @0.75 ltr/10 sqm of approved brand and manufacture
16Providing and injecting approved grout in proportion recommended by the manufacturer into cracks/honeycomb area of concrete/ masonry by suitable gun/pump at required pressure including cutting of nipples after curing etc. complete as per directions of Engineer-in Charge. (The payment shall be made on the basis of actual weight of approved grout injected.) Stirrer mixed Acrylic Polymer of approved make @ 2% of weight of cement used) modified Cement slurry made with non shrink compound in concrete/RCC work
17Providing and fixing plain multipurpose cement board(Hight pressure steam cured) with suitable screws for cement particle board in ceiling etc. complete (frame work to be paid seperatately). 6 mm thick Cement fiber board as per IS: 14862
18Electrical fitting charges(per room)
19Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. MS Frame for water tank-1000 ltr (50x50x5mm Angle Iron Frame)
20Demolishing cement concrete manually/ by mechanical means including disposal of material within all leads as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
21Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within all lead.
22Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level and up to floor two level. 1:4:8 (1 Cement : 4 coarse sand : 8)graded stone aggregate 40 mm nominal size)
23Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level and up to floor two level. Hot rolled deformed bars
24Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size)
25Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
26Columns, Pillars, Piers, Abutments, Posts and Struts and up to floor two level.
27Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc
28CEMENT PLASTER (IN COARSE SAND) 20 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand)
29Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqm : 12 mm average thickness
30Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
31Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr /10 sqm
32Painting wood work with Deluxe Multi Surface Paint of required shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @0.75 ltr/10 sqm of approved brand and manufacture
33Providing and injecting approved grout in proportion recommended by the manufacturer into cracks/honeycomb area of concrete/ masonry by suitable gun/pump at required pressure including cutting of nipples after curing etc. complete as per directions of Engineer-in Charge. (The payment shall be made on the basis of actual weight of approved grout injected.) Stirrer mixed Acrylic Polymer of approved make @ 2% of weight of cement used) modified Cement slurry made with non shrink compound in concrete/RCC work
34Providing and fixing plain multipurpose cement board(Hight pressure steam cured) with suitable screws for cement particle board in ceiling etc. complete (frame work to be paid seperatately). 6 mm thick Cement fiber board as per IS: 14862
35Electrical fitting charges(4000/-per room)
36Demolishing cement concrete manually/ by mechanical means including disposal of material within all leads as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
37Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within all leads.
38Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level and up to floor two level. 1:4:8 (1 Cement : 4 coarse sand : 8)graded stone aggregate 40 mm nominal size)
39Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level and up to floor two level. Hot rolled deformed bars
40Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size)
41Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
42Columns, Pillars, Piers, Abutments, Posts and Struts and up to floor two level.
43Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc
44Providing and fixing hard drawn steel wire fabric of size 75x25 mm mesh or other suitable size wire mesh to be fixed & firmly anchored to the concrete surface by means of “L” shaped mild steel shear key welded with existing reinforcement including the cost of materials, labour, tool & plants as approved by Engineer-in-charge.
45CEMENT PLASTER (IN COARSE SAND) 20 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand)
46Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Proposed Angle Iron Braces (50 x 50 x 6) @ 4.5 kg/Mt
47Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqm :12 mm average thickness
48Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specificationsTwo or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr /10 sqm
49Painting wood work with Deluxe Multi Surface Paint of required shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @0.75 ltr/10 sqm of approved brand and manufacture
50Providing and injecting approved grout in proportion recommended by the manufacturer into cracks/honeycomb area of concrete/ masonry by suitable gun/pump at required pressure including cutting of nipples after curing etc. complete as per directions of Engineer-in Charge. (The payment shall be made on the basis of actual weight of approved grout injected.) Stirrer mixed Acrylic Polymer of approved make @ 2% of weight of cement used) modified Cement slurry made with non shrink compound in concrete/RCC work
51Electrical fitting charges(per room)
52Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. MS Frame for water tank-1000 ltr (50x50x5mm Angle Iron Frame)
53Demolishing cement concrete manually/ by mechanical means including disposal of material within all leads as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
54Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within all leads.
55Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level and up to floor two level. 1:4:8 (1 Cement : 4 coarse sand : 8)graded stone aggregate 40 mm nominal size)
56Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level and up to floor two level. Hot rolled deformed bars
57Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size)
58Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
59Columns, Pillars, Piers, Abutments, Posts and Struts and up to floor two level.
60Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc
61CEMENT PLASTER (IN COARSE SAND) 20 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand)
62Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Proposed Angle Iron Braces (50 x 50 x 6) @ 4.5 kg/Mt
63Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqm : 12 mm average thickness
64Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specificationsTwo or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr /10 sqm
65Painting wood work with Deluxe Multi Surface Paint of required shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @0.75 ltr/10 sqm of approved brand and manufacture
66Providing and injecting approved grout in proportion recommended by the manufacturer into cracks/honeycomb area of concrete/ masonry by suitable gun/pump at required pressure including cutting of nipples after curing etc. complete as per directions of Engineer-in Charge. (The payment shall be made on the basis of actual weight of approved grout injected.) Stirrer mixed Acrylic Polymer of approved make @ 2% of weight of cement used) modified Cement slurry made with non shrink compound in concrete/RCC work
67Providing and fixing plain multipurpose cement board(Hight pressure steam cured) with suitable screws for cement particle board in ceiling etc. complete (frame work to be paid seperatately). 6 mm thick Cement fiber board as per IS: 14862
68Electrical fitting charges(per room)
69Demolishing cement concrete manually/ by mechanical means including disposal of material within all leads as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
70Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within all leads.All kinds of soil.
71Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within all leads.
72Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level and up to floor two level. 1:4:8 (1 Cement : 4 coarse sand : 8)graded stone aggregate 40 mm nominal size)
731:3:6 (1 Cement : 3 coarse sand) : 6 graded stone aggregate 20 mm nominal size)
74Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level and up to floor two level. Hot rolled deformed bars
75Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size)
76Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
77Columns, Pillars, Piers, Abutments, Posts and Struts and up to floor two level.
78Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc
79CEMENT PLASTER (IN COARSE SAND) 20 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand)
80Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Proposed Angle Iron Braces (50 x 50 x 6) @ 4.5 kg/Mt
81Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqm 12 mm average thickness.
82Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specificationsTwo or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr /10 sqm
83Painting wood work with Deluxe Multi Surface Paint of required shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @0.75 ltr/10 sqm of approved brand and manufacture
84Providing and injecting approved grout in proportion recommended by the manufacturer into cracks/honeycomb area of concrete/ masonry by suitable gun/pump at required pressure including cutting of nipples after curing etc. complete as per directions of Engineer-in Charge. (The payment shall be made on the basis of actual weight of approved grout injected.)Stirrer mixed Acrylic Polymer of approved make @ 2% of weight of cement used) modified Cement slurry made with non shrink compound in concrete/RCC work
85Electrical fitting charges(per room)
86Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. MS Frame for water tank-1000 ltr (50x50x5mm Angle Iron Frame)

AI Tender Summary

OUR REF NO 47111969
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 21.93 Lakhs
LAST DATE 17-01-2025
Authority
Authority Name Himachal Pradesh School Education Society
Work Description Retrofitting of GMS Garima Block A (Sr. No. 1 to 19), GMS Garima Block B (Sr. No. 20 to 35), GPS Serkaow Block A (Sr. No. 36 to 52),GPS Serkaow Block B (Sr. No. 53 to 68), GPS Thalla (Sr. No. 69 to 86
Basic Detail
Tender No NO. 7120-23 Dated 30.12.2024
Bidding Type Tender
Location
City chamba
State Himachal Pradesh
Key Dates
Publish Date 08 Jan 2025
Submission Date 17 Jan 2025
Open Date 17 Jan 2025
Finance
Tender Value 21.93 Lakhs
Tender Fee 1000
EMD 43900
Exemption Available
Document List
eeefb67c-d004-4057-976c-9d7bcf0485f2.html
Biddocument.pdf
BOQ_143391.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jan 08, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
Jan 17, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jan 17, 2025

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

eeefb67c-d004-4057-976c-9d7bcf0485f2.html

pdf

Biddocument.pdf

xls

BOQ_143391.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders