| 1 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete. |
| 2 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete |
| 3 | Compacting the hard murum side widths including laying in layers on each side with vibratory roller including artificial watering etc. complete. |
| 4 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. |
| 5 | Excavation for foundationin soft rock including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete.a) Upto 1.50m lift Normal Rateb) 1.50m to 3.00m lift, Add 10%c) 3.00m to 4.50m lift, Add 20%d) 4.50m to 6.0m lift, Add 30% |
| 6 | Providingsoling using80mm sizetrapmetalin15cm.layerincludingfilling voidswith Crushed sand/grit, ramming, watering etc. complete. |
| 7 | Providing and laying in situ / ready mix cement concrete of M-10 proportion with trap/ granite/ quartzite/ gneiss metal in foundation including necessary form work, compacting and curing etc. complete. (with reversible drum type mixer with SCADA with fine agreegates of required specifications (Natural sand / VSI sand finely washed etc ) |
| 8 | Providing cast in situ / ready mix M10 grade cement concrete for head walls of CD work / retaining walls etc. including necessary form work, compaction, finishing and curing etc. complete. (with reversible drum type mixer/ concrete batch mix plant (pan mixer)with SCADA with fine agreegates of required specifications (Natural sand / VSI sand finely washed etc ), cement 4.05 bags/cumt) |
| 9 | Providing and fixing stream lined M-20 grade RCC guard stone including mild steel bar reinforcement etc. complete. |
| 10 | Providing and laying cement concrete pipe of IS 458:2003 NP-2 class of 1200mm diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and curing etc. complete. |
| 11 | Providing and laying in situ / ready mix M-20 cement concrete of trap /granite /quartzite /gneiss metal for approach slab / Rigid pavement including compacting, finishing, curing etc. complete. (excluding reinforcement) (with reversible drum type mixer/ concrete batch mix plant (pan mixer)with SCADA with fine agreegates of required specifications (Natural sand / VSI sand finely washed etc ), cement 6.40 bags/cumt) |
| 12 | Providing and fixing board displaying information, such as \"Name of work, Tender cost, Name of Contractor, Work completion and liability period etc\", having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge |
| 13 | OTHER MINERAL Supply of Rubble, Murum, Soil, 60mm./40mm. metal (Hand broken), royalty charges are not included in the rates.Any revision in Royalty charges and surcharge shall be included in the rate analysis of the respective item. If there is variation in these rates the difference shall be paid extra over the items to the contractor and shall be recovered if these rates are reduced by Govt.i.e Revenue department[As per Govt. of Maharashtra, Revenue and Forest Departments Gazette No.67 Dt.15 May,2015. States that the royalty charges ofRs.141.34/Cu.M. ) are considered. The surcharge levied on Royalty shall also be payable to the contractor. |
| 14 | BITUMANPenetration, Softening Point, Flash & Fire Point, Specific Gravity |
| 15 | AGGREGATEWater Absorption, Specific Gravity,Impact Value, Crushing Value |
| 16 | ADD GOODS AND SERVICE TAX 18 % FOR COST OF WORK |
| 17 | ADD INSURANCE 0.50 % FOR COST OF WORK |