| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. |
| 2 | All kinds of soil |
| 3 | Ordinary Rock |
| 4 | Earth work in excavation in trenches for foundation, drain, pipes, cables etc ( not exceeding 1.5 m in width ) and for shafts, wells. Cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 m inciuding disposal of excavated earthin: All kind of soil lead up to 250mtr. |
| 5 | Providing and laying in position cement concrete 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size): of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) |
| 7 | Dry random rubble masonry with hard stone in foundation and plinth Without bond stone |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns etc. for mass concrete. |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for: 2 Walls (any thickness) attached pilasters, buttresses, plinth and string courses etc. |
| 10 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating eachdeposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 11 | construction of CIB (includes concrete pedestal/brick size 3\"x2\" plastering, painting all complete job as per direction of engineer in charge |
| 12 | Carriage of material from source to site of work by MT including loading, unloading and stacking complete. |
| 13 | Cement 50 KM by M.T and 400 metres by A.T/H.L |
| 14 | Sand 50 KM by M.T and 400 metres by A.T/H.L |
| 15 | Agg 50 KM by M.T and 400 metres by A.T/H.L |
| 16 | Stone 300 metres by A.T/H.L |