|
| 1 | Taking down chowkats or frames with shutters (without taking off shutters from the frames) not exc. 1.5 Sqm each and removing from site complete all as specified and directed. |
| 2 | Taking down chowkhats or frames with shutters (without taking off shutters from the frame) exc 1.5 Sqm but not exc 4 Sqm each and removing from site complete all as specified and directed. |
| 3 | Taking down shutters of any description not exc 1 Sqm including removing from site complete all as specified and directed. |
| 4 | Taking downshutters of any description exc 1 Sqm but not exc. 2 Sqm each including removing from site complete all as specified and directed. |
| 5 | M&L for second class hardwood plain, solid, straight chowkhat and frames, wrought framed rebated on the solid, rounded or chamfered put together with glue pinned at joints,complete all as specified and directed. |
| 6 | M&L for 35mm thick second class hardwoodglazed & skelton shutters open rebated and prepared to receive glass or gauge etc edges of framing plain chamfered or rounded fitted with cut and mitred beads rebated for securing glass etc; sizes of members of shutters as specified in SSR Part - 1, Section 8, clause 8.24 ( a ) complete all as specified and directed. |
| 7 | M&L for30mm thick flush shutters, solid core construction with block board core & plywood face panels, commercial type on both sidescomplete all as specified and directed. |
| 8 | S&F steel windows with side hung shutters including box type hinges with steel handle, and steel peg stay, complete with glazing bars, dovetailed or welded complete all as specified and directed. |
| 9 | S&F steel windows with side hung shutters including box type hinges with steel handle, and steel peg stay, complete without glazing bars, dovetailed or welded complete all as specified and directed. |
| 10 | S & F Framed work such as grills,gratings, etc.. with ends of barsshouldered and/or riveted, orforged into spikes; framedguard bars; barred iron doors;ladders;framed balusters, walk ways;railings; framework ofwater tanks and similar work conforming to Fe.290.Gde-E-165 |
| 11 | S&F steel ventilators with top hung shutter including two pairs of mild steel cup pivots, catch spring and pulley wheel complete all as specified and directed. |
| 12 | S&F solid PVC frame (single rebated) of size 50mmx47mm made out of 5mm prelam PVC sheet and reinforced with mild steel square tube and edges will be painted to match with prelam sheet complete all as specified and directed |
| 13 | S&F factory made soild PVC moulded door shutter, 28mm to 30 mm thick (stiles) with wood free EPS with 2, 4 or 6 raised panel design with 4mm thick moulded prelam PVC sheet on the front face & 4mm thick prelam sheet on back face complete all as specified and directed. |
| 14 | S&F stainless steel wire cloth 0.36mm nominal dia of wire and average width of aperture 1.40mm and fixed with stainless steel wire staples complete all as specified and directed. |
| 15 | S&F3mm thick sheet glass, ordinary quality and glazing with oil putty in square not exc 0.5 sqm in each pane complete all as specified and directed |
| 16 | M&L for preparation of new wooden surfaces of any description over 10 cm width or girth and applying two coats of synthetic enamel paint over a coat of pink primer complete all as specified and directed. |
| 17 | S&F mild steel work as in bands, straps, clamps, holdfast, hooks, plain angle cleats for securing purlins, and similar small articles conforming to Fe 290Gde E 165 complete all as specified and directed. |
| 18 | M&L for PCC 1:2:4 type C-0 (using 12.50 mm graded stone aggregates) as in bed blocks for hold fast kerbs etc complete all as specified and directed. |
| 19 | S&Faluminum, anodized, barrel tower bolts of extruded section 200 mm long,complete all as specified and directed.. |
| 20 | S&Faluminum, anodized, barrel tower bolts of extruded section 150 mm long,complete all as specified and directed. |
| 21 | S&F 100 mmbutt hinges medium weight, coled rolledand fixed with screws/welding to wooden / steel frames or chowkhats, complete all as specified and directed. |
| 22 | S&F75 mmbutt hinges medium weight, coled rolledand fixed with screws/welding to wooden / steel frames or chowkhats, complete all as specified and directed. |
| 23 | S&F 250 mm long Aluminium alloy anodised Sliding door both with hasp, staple( bolt type) and fixed clips of sheet , cast or extruded sections and fixing bolts and sliding of extruded sections or cast -aluminium alloy and fixed with steel screws complete all as specified and directed. |
| 24 | S&F 150mm long extruded aluminum alloy handle,fabricated type,fabricated type anodizedcomplete all as specified and directed. |
| 25 | S&F 100mm long extruded aluminum alloy handle,fabricated type,fabricated type anodizedcomplete all as specified and directed. |
| 26 | S&F in repair Anodised aluminium window and ventilatorssliding type three trackpowder coated consisting of frame 91.80mmx45mm shutters 39x18mm with rollers and locking arrangementswith 4 mmthick plain glass with rubber gaskitand aluminium bedding, Al handle, aluminium grill withfixing arangement (wt of grill not less than 2.50 kg/Sqm ), Aluminium wire mess 0.45 mm dia etc including necessary cutting holes on wall and floor and confirming to IS complete all as specified and directed. (Al section thickness 1.50mm) |
| 27 | S&F in repair glazedaluminiumdoors powder coatedof any colour consisting of frame of 63x39mm size with shuttersfixed on frame both side openable on pivotal arrangement with including necessary cutting holes in wall & floor Door shutter consists of top rail size 94.45x44.45mm, bottom rail & lock rail size is 101.80x44.45mm &style of door shutter is 83x44.45 mmglazed with 5 mm thick tinted/coloured glassof approved make withhandle 2 NOs in each door, hinges has fitted on frame asrrquired fixed with rubber gasket &aluminium beading on any No ofpanels with aluminium handle, locking arrangement, floor spring and floor door stopper inlc necessary joining cleats , glazing clips etc complete ( aluminium sectionthickness 2 mmconfirming to IS complet all as specified and directe. |
| 28 | S&F 6mm thick asbestos cement, corrugated or semi-corrugated shets in roofs Fixed with L-type or J-type or cranked hook bolts, including dismantling Asbestos cement (corrugated, semicorrugated, etc.) sheets in roof coverings complete all as specified and directed. |
| 29 | S&F asbestos cement, corrugated or semi-corrugated shets in roofs Fixed with L-type or J-type or cranked hook bolts but except sheets, including dismantling Asbestos cement (corrugated, semicorrugated, etc.) sheets in roof coverings complete all as specified and directed. |
| 30 | S&F 6mm thick asbestos cement serrated ridge or hip ridgefor corugated or semi corugated sheets, fixed with L-type or J-type or cranked hook bolts,including dismantling of cement sheet roofing complete all as specified and directed. |
| 31 | Dismantling unframed timber scantlings 40 sq. cm & over in section, in any position complete all as specified and directed. |
| 32 | Dismantlingtimber in fillets, rails, posts, rafters, purlins etc under 40sq cm in section framed/ unframed complete all as specified and directed. |
| 33 | S&F pre- coated coloured galvalume aluminum zinc coating GI based corrugated steel sheet 0.50 mm thick of any colour having tensile strength of 550 mpa (AZ150) as in roof covering/ clading to wall, including crimping sheet at endfixed with self tapping screws, including dismantling of Asbestos cement (corrugated, semi corrugated, etc) sheets roofing complete all as specified and directed. |
| 34 | S&F 0.5 mm thick galvalume sheet pre-coated coloured for ridge or fixing for closing gable truss suitable for profile pattern sheet fixed with self driving screws, including dismantling of Asbestos cement (corrugated, semi corrugated, etc) sheets as ridge complete all as specified and directed. |
| 35 | S&F Steel work as in roof trusses (framed) , trussed, purlins, crane gantries, rails and fastenings and heavy bracket framing (beam, tee, angle channel or flat sections) including distance pieces etc complete all as specified and directed |
| 36 | S&F MS plates (plain or chequered) channels square cut to or notched forming holes with riveted bolted or welded attachment for Fe-410W complete all as specified and directed. |
| 37 | M&L for preparation of new steel surfaces and applying two coats of synthetic enamel paint over a coat of red oxide Zinc chromate primer of surfaces over 10cm width or girth complete all as specified and directed |
| 38 | S& F suspended false ceilling comprising of 4mm thick non asbestos fibre cement bulding boards of size 595mmx595mm,fixed or laid/inserted to powder coatedGI frame work with screws over GI perimeter channel 0.55mm thick with two unequal flanges of 20 and 30 mm and web of 27 mm fixed to sourrounding wall using nylon sleeves and screws at 450mm centre to centre/ intermediate channel 0.9 mm thick having two equal flanges of 15mm each and web of 45mm suspended from soffit at approx 900mm centre to centre with GI cleat and steel expansion fastners with and including ceiling section (not exc 1.2m length) of 0.55mm thickness having kurled web of 50mm and flange of 26mm each with lips of 10.5 mm fixed to the intermediate channel with connecting clips across the intermediate channel at 457 mm center to centre including hangers 4mmm dia GI (upto 1200mm length) adjusting level fixed to roof slabs by means of ceiling cleats made out of GI flat 40x3mm size 60mm long, including dismantling ofany type or ceiling boards in thickness incl cover fillets complete all as specified and directed |
| 39 | M&L for PCC ( 1: 2: 4) type B-0 (using 12.50 mm graded stone aggregate) etcon roof top as a leveling course / paddingto maintainthe slope,and roof kerbs,or mud stops, rounded orchambered on edges etc finished the surface even and fair without using extra cement, including demolition of old PCC in any position and description complete all as specified and directed. |
| 40 | M&L for water proofing rooftreatment to RCC roof with approved modified membrane of thickness not less than 3.00mm thick and weighting not less than 3 kg/ sqmincluding taking down of old roof treatment of any descreption including mud phuska, lime concrete tiles cement plaster padding upto n exc 20 cm depth from roof surface etc including cleaning brushing and watering to joints and grooves and removing debries to a distance exc 1.5 kmcomplete all as specified and directed. The height of the roof may upto 9.00 mcomprising with the following items:-(i)The surface of roof,parpet and gutters drain mouths etc over which water proofing treatment is to be applied shall be cleaned of all foreign matter such as fungus,mass dust etc by wire brushing and dusting.For cast iron drain outlets a groove shall be cut as specified and directed.(ii)Oil based Bitumenprimer conforming to IS-3384-1986 @ 0.3 kgs per sqm to be applied on prepared surface till the surface is properly impregnated. (iii)Applyingone coat of hot blown grade bitumen 85/25 grade @ 1.20 kg/Sqm.(iv)Laying of water proofing treatment of weight not less than 3 Kg / sqm and thickness not less than 3mmAPP modified polymeric water proofing membrane composed of 100 micron (±10% ) high density polyethylene sheet ( HMHDPE) as center core, which is standwiched between high quality polymeric bitumen mix having softening , high heat resistance and cold flexible protected on either side with a thin thermo fusible HMHDPE film with side and laps 75 mm and 100 mm as per manufacture instruction etc.(v) Applyingone coat of hot blown grade bitumen 85/25 grade @ 1.20 kg/Sqmover the membrane. (vi)Applying aluminium paint in two coat @ 100 gm/sqm in each coat on finished membrane surfaces complete all as specified and directedat site . |
| 41 | M & L for PCC 1:4:8, type D-2 (using 40 mm graded stone aggregates) in foundations, filling and mass concrete including demolition of cement concrete of any description andin any position complete all as specified and directed by Engineer-in-charge. |
| 42 | M & Lin repairfor hardwood 2nd coasssectional area exc 15 & n exc 25 sq cm clean sawn battens at 25cm centre complete all as specified and directed. |
| 43 | S & F in repairboarding in floor and skirting of hardwood 2nd coasssectional 30 mmthiknessplaned one sidewith butt joints and fixed with nails supplied anf fixedcomplete all as specified and directed. |
| 44 | M&L for seven stage cleaning and sterilization of inside the RCC/ PVC water storage tankof capacity not exceeding 500 Ltr of any description and in any position comprising following cleaning and sterilization of water tanksthrough bacteriological treatment by using TERBAC G5/Inchlor-5/NB-10/ TERBAC-G-65/ Inoxi-60/NB-69 AND ULTRA VIOLET RAY. Make: rays Cleantech/ Inus watertech/ satya enterprise.Location: SAAseven stages are as under plants:-(a). First Stage is to drain out the water by using exit valve or high capacity dewatering system.(b). Second stage is cleaning all the algae formation inside the tank by using TERBAC G10/ Inoxi-60/NB-69laboratory tested branded chemical of the company ans scrubbing the walls of the tanks.(c). Third strage is fresh water cleaning by high speed jet pump.(d). Fourth stage and first bacteria screening is decertification by using TERBAC-G5/ Inohor-5/NB-10a Govt Laboratory certified brannded halogen compound or E in C approved Equivalentproduct (e). Fifth stage is cleaning the floor of water tank by industrial vaccum cleaner. (f) . Sixth stage is the second bacterio screening and sterilizing method by using ultra violet ray within the tnk and kills all suspended bacteria. (g)Seventh stage of cleaning and third bacteria screening is to sterilize the floor of the water tank by using laboratory certified, branded strong oxidizing agent TERBAC-G65/Inoxi-60/NB-69 or EinC approved equivalent Product.Note:-(i) Company will submit government laboratory test certificate of TERBAC-G5/INCHLOR-5/NB-10, TERBAC-G65/ INOXII-60/NB-69, before cleaning, fix the sticker mentioning the date of cleaning & name of site and also provide certificate confirming the completion of sterilization of water tanks mentioning the name of station and date of cleaning. All the cleaning & sterilization staffs should be under accidental insurance coverage. (ii) Outlet pipe of OHT should be plugged out before cleaning the OHT to avoid entering scales and the same shall be reconnected after cleaning the OHT and the quoted rate is deemed to include for the provision. (iii) Sterilization team will be comprised of at least 30% members who are minimum03 months certificate holder in water tanks sterilization. (iv) contractor will be responsible for rectification of complaints occurred during cleaning the tank ie. No water in tank/over flow due to broken of float valve/ blockage to be included in quoted rate. Note:-The work shall be carried through specialized agency i.e. Rays Cleantech/ Inus Watertech/ Satya Enterprise. |
| 45 | M&L for seven stage cleaning and sterilization of inside the RCC/ PVC water storage tankof capacity exceeding 500 Ltr but not exceeding 1000 Ltr of any description and in any position comprising following cleaning and sterilization of water tanksthrough bacteriological treatment by using TERBAC G5/Inchlor-5/NB-10/ TERBAC-G-65/ Inoxi-60/NB-69 AND ULTRA VIOLET RAY. Make: rays Cleantech/ Inus watertech/ satya enterprise.Location: SAAseven stages are as under plants:-(a). First Stage is to drain out the water by using exit valve or high capacity dewatering system.(b). Second stage is cleaning all the algae formation inside the tank by using TERBAC G10/ Inoxi-60/NB-69laboratory tested branded chemical of the company ans scrubbing the walls of the tanks.(c). Third strage is fresh water cleaning by high speed jet pump.(d). Fourth stage and first bacteria screening is decertification by using TERBAC-G5/ Inohor-5/NB-10a Govt Laboratory certified brannded halogen compound or E in C approved Equivalentproduct (e). Fifth stage is cleaning the floor of water tank by industrial vaccum cleaner. (f) . Sixth stage is the second bacterio screening and sterilizing method by using ultra violet ray within the tnk and kills all suspended bacteria. (g)Seventh stage of cleaning and third bacteria screening is to sterilize the floor of the water tank by using laboratory certified, branded strong oxidizing agent TERBAC-G65/Inoxi-60/NB-69 or EinC approved equivalent Product.Note:-(i) Company will submit government laboratory test certificate of TERBAC-G5/INCHLOR-5/NB-10, TERBAC-G65/ INOXII-60/NB-69, before cleaning, fix the sticker mentioning the date of cleaning & name of site and also provide certificate confirming the completion of sterilization of water tanks mentioning the name of station and date of cleaning. All the cleaning & sterilization staffs should be under accidental insurance coverage. (ii) Outlet pipe of OHT should be plugged out before cleaning the OHT to avoid entering scales and the same shall be reconnected after cleaning the OHT and the quoted rate is deemed to include for the provision. (iii) Sterilization team will be comprised of at least 30% members who are minimum03 months certificate holder in water tanks sterilization. (iv) contractor will be responsible for rectification of complaints occurred during cleaning the tank ie. No water in tank/over flow due to broken of float valve/ blockage to be included in quoted rate. Note:-The work shall be carried through specialized agency i.e. Rays Cleantech/ Inus Watertech/ Satya Enterprise. |
| 46 | S&F rotational moulded polyethylene water storage tanks (cylindrical vertical with closed top) of 500 litres capacity, screwed type lid on top to cover, ISI marked, three layered wall construction, ISI mark embosed, hoisted and fixed in position including connecting up pipes, including 20mm dia PVC float valve and including dismantling of old water tank & removing from site complete all as specified and directed |
| 47 | S&F rotational moulded polyethylene water storage tanks (cylindrical vertical with closed top) of 1000 litres capacity, screwed type lid on top to cover, ISI marked, three layered wall construction, ISI mark embosed, hoisted and fixed in position including connecting up pipes, including 20mm dia PVC float valve and including dismantling of old water tank & removing from site complete all as specified and directed |