|
| 1 | Providing and fixing Arm and Shoulder Wheel of size 1300x1200x1350 mm make of Green Gym or Equivalent fabricated with main post of 140mm dia and 3.0 mm thick rest of the pipe are 40mm dia and 2.5 mm thick all pipes made up of hot rolled tabular steel and hot dipped galvanized, and powder coated using Akzo nobel or equivalent of 80-120 micron thick. All welding joint of pipe are robotic welded with joint scalloped as necessary and dressed off removing sharp egde and burrs. Zinc primer paint to be applied at all welding points prior to finishing Padals shall be made up of Nylon alloy with rounded edge of prevent any impact of injury and seat to be made from virgin LLDPE manufactured by rotational moulding with minimum thickness of plastic 4.00mm, colourful and U V resistant environmental friendly. Bearing shall be maintenance free, duly oiled sealed and self lubricated made by reputed company to be approved by Officer-In-Charge. Equipment to be fitted within built limiter to prevent unwanted movements. All open ends of pipe to be coloured by GI/LLDPE caps for user safety. The equipment to be fixed on ground with concrete of minimum strength M25 and J shaped welded bolt and once the concrete is set, fix the equipment on to it and cover nuts and bolt with the base plate cover, all complete as per direction and approval of Engineer-In-Charge regarding material shape of equipment colour on metal, seat and base cover plate and fixing of equipment etc. |
| 2 | Providing and fixingof Chin up Bar size 26300x305x2640 mm make of Green Gym or Equivalent fabricated with main post of 140mm dia and 3.0 mm thick rest of the pipe are 40mm dia and 2.5 mm thick all pipes made up of hot rolled tabular steel and hot dipped galvanized, and powder coated using Akzo nobel or equivalent of 80-120 micron thick. All welding joint of pipe are robotic welded with joint scalloped as necessary and dressed off removing sharp egde and burrs. Zinc primer paint to be applied at all welding points prior to finishing Padals shall be made up of Nylon alloy with rounded edge of prevent any impact of injury and seat to be made from virgin LLDPE manufactured by rotational moulding with minimum thickness of plastic 4.00mm, colourful and U V resistant environmental friendly. Bearing shall be maintenance free, duly oiled sealed and self lubricated made by reputed company to be approved by Officer-In-Charge. Equipment to be fitted within built limiter to prevent unwanted movements. All open ends of pipe to be coloured by GI/LLDPE caps for user safety. The equipment to be fixed on ground with concrete of minimum strength M25 and J shaped welded bolt and once the concrete is set, fix the equipment on to it and cover nuts and bolt with the base plate cover, all complete as per direction and approval of Engineer-In-Charge regarding material shape of equipment colour on metal, seat and base cover plate and fixing of equipment etc. |
| 3 | Providing and fixing Air Walkerof size 100x550x1480 mm make of Green Gym or Equivalent fabricated with main post of 140mm dia and 3.0 mm thick rest of the pipe are 40mm dia and 2.5 mm thick all pipes made up of hot rolled tabular steel and hot dipped galvanized, and powder coated using Akzo nobel or equivalent of 80-120 micron thick. All welding joint of pipe are robotic welded with joint scalloped as necessary and dressed off removing sharp egde and burrs. Zinc primer paint to be applied at all welding points prior to finishing Padals shall be made up of Nylon alloy with rounded edge of prevent any impact of injury and seat to be made from virgin LLDPE manufactured by rotational moulding with minimum thickness of plastic 4.00mm, colourful and U V resistant environmental friendly. Bearing shall be maintenance free, duly oiled sealed and self lubricated made by reputed company to be approved by Officer-In-Charge. Equipment to be fitted within built limiter to prevent unwanted movements. All open ends of pipe to be coloured by GI/LLDPE caps for user safety. The equipment to be fixed on ground with concrete of minimum strength M25 and J shaped welded bolt and once the concrete is set, fix the equipment on to it and cover nuts and bolt with the base plate cover, all complete as per direction and approval of Engineer-In-Charge regarding material shape of equipment colour on metal, seat and base cover plate and fixing of equipment etc. |
| 4 | Providing and fixing Sit Up Stationof size 1500x1150x650 mm make of Green Gym or Equivalent fabricated with main post of 140mm dia and 3.0 mm thick rest of the pipe are 40mm dia and 2.5 mm thick all pipes made up of hot rolled tabular steel and hot dipped galvanized, and powder coated using Akzo nobel or equivalent of 80-120 micron thick. All welding joint of pipe are robotic welded with joint scalloped as necessary and dressed off removing sharp egde and burrs. Zinc primer paint to be applied at all welding points prior to finishing Padals shall be made up of Nylon alloy with rounded edge of prevent any impact of injury and seat to be made from virgin LLDPE manufactured by rotational moulding with minimum thickness of plastic 4.00mm, colourful and U V resistant environmental friendly. Bearing shall be maintenance free, duly oiled sealed and self lubricated made by reputed company to be approved by Officer-In-Charge. Equipment to be fitted within built limiter to prevent unwanted movements. All open ends of pipe to be coloured by GI/LLDPE caps for user safety. The equipment to be fixed on ground with concrete of minimum strength M25 and J shaped welded bolt and once the concrete is set, fix the equipment on to it and cover nuts and bolt with the base plate cover, all complete as per direction and approval of Engineer-In-Charge regarding material shape of equipment colour on metal, seat and base cover plate and fixing of equipment etc. |
| 5 | Providing and fixing Exercising Barof size 1800x550x1700 mm make of Green Gym or Equivalent fabricated with main post of 140mm dia and 3.0 mm thick rest of the pipe are 40mm dia and 2.5 mm thick all pipes made up of hot rolled tabular steel and hot dipped galvanized, and powder coated using Akzo nobel or equivalent of 80-120 micron thick. All welding joint of pipe are robotic welded with joint scalloped as necessary and dressed off removing sharp egde and burrs. Zinc primer paint to be applied at all welding points prior to finishing Padals shall be made up of Nylon alloy with rounded edge of prevent any impact of injury and seat to be made from virgin LLDPE manufactured by rotational moulding with minimum thickness of plastic 4.00mm, colourful and U V resistant environmental friendly. Bearing shall be maintenance free, duly oiled sealed and self lubricated made by reputed company to be approved by Officer-In-Charge. Equipment to be fitted within built limiter to prevent unwanted movements. All open ends of pipe to be coloured by GI/LLDPE caps for user safety. The equipment to be fixed on ground with concrete of minimum strength M25 and J shaped welded bolt and once the concrete is set, fix the equipment on to it and cover nuts and bolt with the base plate cover, all complete as per direction and approval of Engineer-In-Charge regarding material shape of equipment colour on metal, seat and base cover plate and fixing of equipment etc. |
| 6 | Providing and fixing Seated Chest Pressof size 1800x700x2000 mm make of Green Gym or Equivalent fabricated with main post of 140mm dia and 3.0 mm thick rest of the pipe are 40mm dia and 2.5 mm thick all pipes made up of hot rolled tabular steel and hot dipped galvanized, and powder coated using Akzo nobel or equivalent of 80-120 micron thick. All welding joint of pipe are robotic welded with joint scalloped as necessary and dressed off removing sharp egde and burrs. Zinc primer paint to be applied at all welding points prior to finishing Padals shall be made up of Nylon alloy with rounded edge of prevent any impact of injury and seat to be made from virgin LLDPE manufactured by rotational moulding with minimum thickness of plastic 4.00mm, colourful and U V resistant environmental friendly. Bearing shall be maintenance free, duly oiled sealed and self lubricated made by reputed company to be approved by Officer-In-Charge. Equipment to be fitted within built limiter to prevent unwanted movements. All open ends of pipe to be coloured by GI/LLDPE caps for user safety. The equipment to be fixed on ground with concrete of minimum strength M25 and J shaped welded bolt and once the concrete is set, fix the equipment on to it and cover nuts and bolt with the base plate cover, all complete as per direction and approval of Engineer-In-Charge regarding material shape of equipment colour on metal, seat and base cover plate and fixing of equipment etc. |
| 7 | Providing and fixing Twisterof size 1700x1300x1300 mm make of Green Gym or Equivalent fabricated with main post of 140mm dia and 3.0 mm thick rest of the pipe are 40mm dia and 2.5 mm thick all pipes made up of hot rolled tabular steel and hot dipped galvanized, and powder coated using Akzo nobel or equivalent of 80-120 micron thick. All welding joint of pipe are robotic welded with joint scalloped as necessary and dressed off removing sharp egde and burrs. Zinc primer paint to be applied at all welding points prior to finishing Padals shall be made up of Nylon alloy with rounded edge of prevent any impact of injury and seat to be made from virgin LLDPE manufactured by rotational moulding with minimum thickness of plastic 4.00mm, colourful and U V resistant environmental friendly. Bearing shall be maintenance free, duly oiled sealed and self lubricated made by reputed company to be approved by Officer-In-Charge. Equipment to be fitted within built limiter to prevent unwanted movements. All open ends of pipe to be coloured by GI/LLDPE caps for user safety. The equipment to be fixed on ground with concrete of minimum strength M25 and J shaped welded bolt and once the concrete is set, fix the equipment on to it and cover nuts and bolt with the base plate cover, all complete as per direction and approval of Engineer-In-Charge regarding material shape of equipment colour on metal, seat and base cover plate and fixing of equipment etc. |
| 8 | Providing and fixing DOUBLE ARC SWING having dimensionProduct Area 3.20m x 1.50m.Including supply of all material labour T&P etc all complete workincluding GST |
| 9 | Providing and fixing MULTIACTIVITY PLAY SYSTEM(MAPS) Product Area 6.4m x 8.10m (20.9ftx26.5Ft). Modal and Design no.MAPS-07 Including supply of all material labour T&P etc all complete workincluding GST |
| 10 | PART-B |
| 11 | S/F of 20 mtr High Mast shaft of approved make with rising system hot dip glavanized inside & out side dip, having pole sheet thickness 4mm. Top dia minimum 150mm, Bottom dia 410 mm base plate 32mm thick suitable for wind velocity as per IS 875 part 3 & having no circumferential weld, with accessories for high mast such as head frame suitable for 6 to 12 luminaries & its control gear boxes 1.5HP power tool motor, 3 point suspension system with steel wire rope 8mm dia, double drum winch, including making suitable foundation as per manufacture drawing/site reuiment along with foundation bolts, nuts, washers, anchor plates etc complete in all respect. [SOR No. 653/2018] |
| 12 | S/F of Factory wired integral LED Flood Light luminaires (Philips/Halonix/Havells make) with die cast aluminium housing built with driver set suitable for 170 to 200 watt. Cofirming to IP-66 protection complete in all respect. [CAT-AAA SOR No. 1455/2018] |
| 13 | S/L of Aluminium Conductor PVC insulated armoured served sheathed cables 1100 Volts grade at a depth of 750 m below ground level over a cushion of 75mm thick sand alround and protected with burnt bricks on both sides and on top. On surface the cable run shall be fixed on M.S clamps at of suitable size or as directed by the Engineer-In-Charge complete in all respect.The armouring of the Cable shall be properly connected with the earth conductor by clamps etc. complete all respect as per direction of E/I. 25 SqmmX3.5 Core [PWD SOR No. 501 (i)/2018] |
| 14 | Supply and burying earth for lighting conductor of 900mm x 900mm x 3mm copper plate vertically with itstop at least 3 metres below ground level complete with 20mm dia G.I. pipe for watering funnel, 30cm square C.I.frame with hinged cover masonry housing alternate layers of charcoal/coke and salt at least 150mm thick alroundetc. as per directions of Engineer-in-charge complete inall respect.(SOR NO 709/2018) |
| 15 | S/F of 100Amp 415V metal clad TPN HRC Type switch fuse unit complete with HRC fuse on angel iron bracket complete in all respect CAT-B [SOR No. 328/2018] |
| 16 | Supply and Wiringof Submain with two nos of2.5 Sqmm FRLSH PVC insulated 1100V Grade single core multistrand Copper Conductor Cable in existing conduit complete with supply of all material labour and T&P required for proper completion of work as direction by Engineer-In-Charge.(SOR No.-289/2018) |