Tender For Supply, Installation, Testing And Commissioning Of Pre And Post Chlorination System For 45 Mld And 110 Mld Wtp Along With Replacement Of Old System And Its Associated Items With Leak Absorption System At Babina Distt. Jhansi, Jhansi-Uttar Pradesh
TDR : 47035368
Tender Notice
BOQ
Expired
Jhansi
Uttar Pradesh
Tender For Supply, Installation, Testing And Commissioning Of Pre And Post Chlorination System For 45 Mld And 110 Mld Wtp Along With Replacement Of Old System And Its Associated Items With Leak Absorption System At Babina Distt. Jhansi
Name of Work: Supply, Installation, Testing and Commissioning of Pre and Post Chlorination systemfor 45 MLD and 110 MLD WTP along with replacement of old system and its associated items with leak absorption system at Babina Distt. Jhansi
Sl. No.
Item Description
1
PRE CHLORINATION AT 110 MLD WTP
2
CHLORINATION SYSTEM FOR 110 MLD PRE DOSING : A1 CHLORINATION EQUIPMENT1. Supply of Vacuum Type Solution Feed Chloro Tech make Chlorination Plant, Capacity : 15 Kg / Hr, Consist of:- 1) Remote Vacuum Regulator, 2) Remote Injector, 3) Chlorine Flow Meter (Rota Meter), 4) Chlorine Rate Control Valve,5) Primary Check Valve, 6) Vent & Vacuum Tubing, 7) Cabinet - 2 Nos. (1W+1S) 2. Vacuum Gauge -2 Nos.3. Skid for Chlorinator1 Set A2 CHLORINE GAS ACCESSORIES FOR CHLORINATOR4. 100 mm Chlorine Pressure Gauge On Header Line. 1 Nos.5. 18 NB Schedule 80 Carbon Steel Gas Manifold As PerT.M. B. 106, suitable for 3 nos. toner connection and 2 nos. RVR 1 Nos.6. C.S. 1 Moisture Trap - 1 Nos.7. Copper Tubing of 1.5 Mtr. Length -3 Nos.8. Isolation Valve On Gas Manifold And Chlorinator Inlet - 6 Nos.9. Auxiliary Yoke Clamp with Adaptor -3 Nos.10. Skid for Gas Manifold -1 Nos.11. Roller support for 2 nos. toner -6 nos.
3
A3 BOOSTER PUMP WITH PIPING/VALVES & SOLUTION DOSING ACCESSORIES12. 100 mm Water Pressure Gauge On Ejector Inlet. 2 Nos.13. Booster Pump, 9m3/hr flow @ 40 mtr. head 2 Nos.14. 1.5” PVC Ejector Inlet & Outlet Valve 4 Nos.15. 1.5” NRV On Solution Line 2 Nos.16. Strainer for Booster Pump suction 2 Nos.17. Ball Valve for Inlet & Outlet with interconnecting of Booster pump 5 Nos.18. Diffuser 1 Nos.19. C-Class materials such as nut/bolt/gasket etc. 1 Lot
4
CHLORINATION SYSTEM FOR 110 & 45 MLD POST DOSING : B1 CHLORINATION EQUIPMENT1. Supply of Vacuum Type Solution FeedChlorination Plant, Capacity : 15 Kg / Hr, Consist of:- 1) Remote Vacuum Regulator, 2) Remote Injector, 3) Chlorine Flow Meter (Rota Meter), 4) Chlorine Rate Control Valve,5) Primary Check Valve, 6) Vent & Vacuum Tubing, 7) Cabinet -2 Nos. (1W+1S)2. Vacuum Gauge 2 Nos. 3. Skid for Chlorinator 1 SetB2 CHLORINE GAS ACCESSORIES FOR CHLORINATOR4. 100 mm Chlorine Pressure Gauge On Header Line. 1 Nos.5. 18 NB Schedule 80 Carbon Steel Gas Manifold As Per A.S.T.M. B. 106, suitable for 3 nos. toner connection and 2 nos. RVR -1 Nos.6. C.S. 1 Moisture Trap-1 Nos.7. Copper Tubing of 1.5 Mtr. Length -3 Nos.8. Isolation Valve On Gas Manifold And Chlorinator Inlet - 6 Nos.9. Auxiliary Yoke Clamp with Adaptor - 3 Nos.10. Skid for Gas Manifold 1 Nos.11. Roller support for 2 nos. toner - 6 nos.
5
B3 BOOSTER PUMP WITH PIPING/VALVES & SOLUTION DOSING ACCESSORIES12. 100 mm Water Pressure Gauge On Ejector Inlet. 2 Nos.13. Booster Pump, 9m3/hr flow @ 40 mtr. head 2 Nos.14. 1.5” PVC Ejector Inlet & Outlet Valve 4 Nos.15. 1.5” NRV On Solution Line 2 Nos.16. Strainer for Booster Pump suction 2 Nos.17. Ball Valve for Inlet & Outlet with interconnecting of Booster pump 5 Nos.18. Diffuser 1 Nos.19. Flow meter on solution line with interconnecting valve 2 Nos.20. C-Class materials such as nut/bolt/gasket etc. [C] PIPING FOR RAW WATER & CHLORINE SOLUTION DOSING FOR PRE & POST DOSING : 1. UPVC Pipe for Water Suction & Discharge of booster pump for both pre &Post, Size : 1.5”, 2” & 2.5” -40 Mtr.2. UPVC Pipe for Chlorine solution dosing for both pre & Post,Size : 2” & 2.5” -500 Mtr.
6
SAFETY ITEMS
7
1. Chlorine Leak Detector with single sensor - 1 Nos.2. Self Contained Air Breathing Apparatus Set - 1 Nos.3. Safety Shower with Eye Wash - 1 Nos.4. Ammonia Torch with Bottle - 1 Nos.5. Canister type Gas Mask - 1 No.6. Protective Clothing - 1 No.7. First Aid Box - 1 No.8. Emergency Repair Kit - 1 Set
8
E. CHLORINE TONNER LEAK ABSORPTION SYSTEM:I Mechanical Items1. FRP Hood -6 Nos.2. PVC Duct Line -As Per Ga 6”3. Blower (Cs+Frp) -2 Nos. 1500m3/h@300mmwc 4. Packed Column Absorption Tower -1 Nos. 1 Ton Dissolved 5. Caustic Storage Tank -1 Nos. 6+0.5 m36. Caustic Circulation Pump -2 Nos. 20 M3/Hr.@30 M. 7. Damper Valve At Blower Inlet/Outlet -2 Nos. 6” 8. PP Isolaiton Ball Valve At Caustic Pump Interconnecting And Drain Line -10 Nos 2”9. PP NRV -1 Nos.2” 10. PP Y Type Strainer -1 Nos.2” 11. PVC Ball Valve For Flushing -5 Nos.1/2\" 12. Caustic Circulation Line -30 Mtr. 3” 13. Flexible Hose 3 Mtr.2” 14. Ball Valve For Level Gauge -2 Nos.1” 15. Valves For Instruments -2 Nos. 1/2\" -IiElectrical & Instrument Items16. Motor For Blower -1 Nos.3.7 Kw@1500 Rpm 17. Motor For Caustic Circulation Pump -1 Nos.3.7 Kw/2900 Rpm Abb18. Pressure Gauge for Caustic Pump -1 Nos.0-6 Kg/Cm219. Pressure Gauge at Blower Discharge -1 Nos.0-600 Mmwc 20. Level Switch High/Low -2 No. Float Type 21. Level Gauge -1 No. Magnetic Type
9
Necessary arrengement for chlorine leak absorption system complete with material , labour etc complete in all respect.
10
Note :- Salvage value of old material will be deducted @ 0.1% of tender value.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.