}

Bids Are Invited For Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site Unit 5 And 6; Preventive Maintenance Including Spares Of 1 Point 5 And 2 Ton Window Air Conditioners Along With Breakdown Maintenance Total Q, Chittorgarh-Rajasthan

Nuclear Power Corporation Of India Limited has published Bids Are Invited For Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site Unit 5 And 6; Preventive Maintenance Including Spares Of 1 Point 5 And 2 Ton Window Air Conditioners Along With Breakdown Maintenance Total Q. Submission Date for this Tender is 13-01-2025. Air Conditioner Tenders in Chittorgarh Rajasthan. Bidders can get complete Tender details and download the document.




Tender Notice

47022825
Bids Are Invited For Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site Unit 5 And 6; Preventive Maintenance Including Spares Of 1 Point 5 And 2 Ton Window Air Conditioners Along With Breakdown Maintenance Total Q
Open Tender
Indian
Rajasthan
Chittorgarh
13-01-2025

Tender Details

Bids Are Invited For Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR site unit 5 and 6; Preventive maintenance including spares of 1 point 5 and 2 Ton window air conditioners along with breakdown maintenance Total quantity 1 is equal t.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR site unit 5 and 6; Preventive maintenance including spares of 1 point 0 and 2 Ton split air conditioners along with breakdown maintenance Total quantity 1 is equal to.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR site unit 5 and 6; Preventive maintenance including spares of Water coolers Capacity 40 80 150 and 200 Lit along with breakdown maintenance Total quantity 1 is equal .. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR site unit 5 and 6; Preventive maintenance including spares of Deep Freezers Bottle Cooler and Vertical Freezers along with breakdown maintenance Total quantity 1 is e.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR site unit 5 and 6; Preventive maintenance including spares of Refrigerator Capacity 165 and 230 and 300 Lit along with breakdown maintenance Total quantity 1 is equal.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR site unit 5 and 6; Preventive maintenance including spares along with daily condition monitoring of 5 Ton 1X5T 2Nos 15 Ton 3X5T 5 Nos and 10Ton 2X5T 6Nos package air .. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR site unit 5 and 6; Preventive maintenance including spares of Desert Coolers along with breakdown maintenance Total quantity 1 is equal to 100 for each year of two ye.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR unit 5 and 6; Preventive maintenance including spares of Water Purifiers along with breakdown maintenance Total quantity 1 is equal to 27 for each month of two y.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR site unit 5 and 6; Preventive maintenance including spares of Hydrogen Coolers along with breakdown maintenance Total quantity 1 is equal to 04 for each month of two .. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR site unit 5 and 6; Preventive maintenance including spares of 3Ton CASSETTE model Air Conditioners Roof mounted along with breakdown maintenance Total quantity 1 is e.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR site unit 5 and 6; Removal shifting and installation of 1 point 5 and 2 Ton window type air conditioners as in scope of work Total quantity 1 is equal to 20 for two y.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR site unit 5 and 6; Removal shifting and installation of 1 and 2 ton split air conditions as in scope of work Total quantity 1 is equal to 30 for two years; Service Pr.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR site unit 5 and 6; Removal shifting and installation of Water coolers as in scope of work Total quantity 1 is equal to 13 for two years; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR site unit 5 and 6; Supply and Charging of Freon gas deep freezers water coolers as in scope of work Total quantity 1 is equal to 18 for two years; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR site unit 5 and 6; Supply and Charging of Freon Gas in Window by Split air conditioner as in scope of work Total quantity 1 is equal to 60 for two years; Service Prov.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR site unit 5 and 6; Replacement of compressor of package air conditioners of 5 Ton compressor including spares Total quantity 1 is equal to 10 for two years; Service P.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR site unit 5 and 6; Supply installation of Thermal Insulation on Copper Cooling Tubes Size 5 by 8 X 1 by 4 and 3 by 8 X 1 by 4 Total quantity 1 is equal to 500 for two... Total Quantity :

Key Value

Document Fees
Refer document
EMD
INR 199397.0 /-
Tender Value
INR 99.69 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail