Tender For Completion Of Shamshan Ghat Near Shiv Mandir In Mc Kalanaur.
Tender Value
6.77 Lakhs
Estimated cost
Bid Submission
07 Jan 2025
0 days left
EMD
16000
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
kalanaur → Haryana
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Completion Of Shamshan Ghat Near Shiv Mandir In Mc Kalanaur.
BOQ
| Sl. No. | Item Description |
| 1 | HSR Item 6.34.6-Steel reinforcement for R.C.C. work, wherenot included in the complete rate of RCC, includingstraightening, cutting, bending, placing in position, binding,wastage, overlaps, welded joints, spacer bars, chairs, stays,hangers and annealed steel wire etc. complete in all respectabove plinth level Note:- Reinforcement shall be measured inlength including hooks, if any, separately for differentdiameters as actually used in work , excluding overlaps.Wastage, overlaps, couplings, welded joints, spacer bars,chairs, stays, hangers and annealed steel wire or othermethods of binding & placing shall not be measured and costof these items shall be deemed to be included in the rates forreinforcement. 6. Thermo-Mechanically Treated bars of gradeFe-500D or more.HSR Rate(Rs.) 68.00 Through Rate |
| 2 | HSR Item 6.30.6-Centering and shuttering including strutting,propping etc. and removal of form for 6. Columns, Pillars,Piers, Abutments, Posts and StrutsHSR Rate(Rs.) 262.00 Through Rate |
| 3 | HSR Item 6.16-Reinforced cement concrete work in beams,suspended floors, roofs having slope up to 15° landings,balconies, shelves, chajjas, lintels, bands, plain window sills,staircases and spiral stair cases above plinth level up to floorfour level, excluding the cost of centering, shuttering, finishingand reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).HSR Rate(Rs.) 6113.00 Through Rate |
| 4 | HSR Item 4.14.1-Earth work in excavation by mechanicalmeans (Hydraulic excavator) / manual means in foundationtrenches or drains (not exceeding 1.5 m in width or 10 sqm onplan), including dressing of sides and ramming of bottoms, liftup to 1.5 m, including getting out the excavated soil anddisposal of surplus excavated soil as directed, within a lead of50 m. 1. All kinds of soil.HSR Rate(Rs.) 83.00 Through Rate |
| 5 | HSR Item 10.100.2-Cement Concrete 1:8:16 Flooring 2.Cement Concrete 1:8:16 with stone aggregate 40 mm size infoundation and plinth.HSR Rate(Rs.) 1863.00 Through Rate |
| 6 | HSR Item 7.21.2-Brick work with common burnt clay nonmodular bricks of class designation 10.5 in foundation andplinth in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand)HSR Rate(Rs.) 3968.00 Through Rate |
| 7 | HSR Item 7.22.2-Brick work with common burnt clay nonmodular bricks of class designation 10.5 in superstructureabove plinth level up to floor IV level in all shapes and sizes in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand)HSR Rate(Rs.) 4488.00 Through Rate |
| 8 | HSR Item 11.5.3-12 mm cement plaster of mix : 3. 1:4 (1cement: 4 fine sand) HSR Rate(Rs.) 113.00 Through Rate |
| 9 | HSR Item 12.158.1-Providing and fixing 12 mm thickprelaminated particle board flat pressed three layer or gradedwood particle board conforming to IS: 12823 Grade l Type ll,in panelling fixed in aluminium doors, windows shutters andpartition frames with C.P. brass / stainless steel screws etc.complete as per architectural drawings and directions ofengineer-in-charge. 1. Pre-laminated particle board withdecorative lamination on one side and balancing laminationon other side HSR Rate(Rs.) 747.00 Through Rate |
| 10 | HSR Item 5.7.4-Demolishing brick work manually/ bymechanical means including stacking of serviceable materialand disposal of unserviceable material within 50 metres leadas per direction of Engineer-in-charge. 4. In cement mortarHSR Rate(Rs.) 585.00 Through Rate |
| 11 | HSR Item 12.144.2-Providing and fixing to existing doorframes. 2. 30 mm thick Fibreglass Reinforced Plastic (F.R.P.)flush door shutter in different plain and wood finish made withfire retardant grade unsaturated polyester resin, moulded to 3mm thick FRP laminate all around, with suitable woodenblocks inside at required places for fixing of fittings andpolyurethane foam (PUF)/Polystyrene foam to be used asfiller material throughout the hollow panel, castedmonolithically with testing parameters of F.R.P. laminateconforming to table - 3 of IS: 14856, complete as per directionof Engineer-in-charge. HSR Rate(Rs.) 3253.00 Through Rate |
| 12 | HSR Item 11.6.2-15 mm cement plaster on the rough side ofsingle or half brick wall of mix : 2. 1:6 (1 cement: 6 fine sand)HSR Rate(Rs.) 127.00 Through Rate |
| 13 | HSR Item 6.15.1-Reinforced cement concrete work in walls(any thickness), including attached pilasters, buttresses, plinthand string courses, fillets, columns, pillars, piers, abutments,posts and struts etc. above plinth level up to floor four level,excluding cost of centering, shuttering, finishing andreinforcement : 1. 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size)HSR Rate(Rs.) 5969.00 Through Rate |
AI Tender Summary
Tender Timeline
Jan 01, 2025
11:30 IST
Tender Published
Tender notice published.
CompletedJan 07, 2025
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJan 08, 2025
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents