| 1 | Earth work in excavation in foundation, trenches etc. includingdressing of sides and ramming of bottoms, including getting out theexcavated material, refilling after laying pipe/ foundation anddisposal of surplus excavated material at a lead upto 50m suitablesite as per direction of Engineer for following depths, below naturalground / Road top level. 4.10.1 In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.4.10.1.1 Depth upto 1.5 m |
| 2 | Providing and laying in position cement concrete of specified gradeexcluding the cost of centring and shuttering - All work upto plinthlevel :21.1.7 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). |
| 3 | Random rubble masonry with hard stone in foundation and plinth :25.1.1 Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 4 | Random rubble masonry with hard stone in superstructure above plinth level and upto two stories. In Cement mortar 1:6 (1 cement : 6 coarse sand |
| 5 | Extra for random rubble masonry with hard stone in :25.4.1 Square or rectangular pillars |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 21.1.2 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). |
| 7 | Cement plastering including T&P, scaffolding, material and completelabpour, including cost of water, curing, racking of joints etc. with 20mm cement plaster of mix :32.3.3 1:6 (1 cement : 6 fine/ coarse sand) |
| 8 | Cement plastering including T&P, scaffolding, material and completelabpour, including cost of water, curing, racking of joints etc. with 20mm cement plaster of mix : 32.3.3 1:6 (1 cement : 6 fine/ coarse sand) plastering done on moulding cornices or architraves including neat finish to line and level:32.13.1 In one coat |
| 9 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.29.26.2 In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 10 | Painting with synthetic enamel paint of approved brand andmanufacture to give an even shade :32.50.1 Two or more coats on new work |
| 11 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade32.36.1New work (Two or more coats applied @ 1.43 ltr/ 10 sqm. over and including base coat of water proofing cement paint applied @ 2.20 kg/ 10 sqm). |
| 12 | 34.47 Providing and placing on terrace (at all floor levels) polyethylene water storage tank ISI : 12701 marked with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank |