| 1 | Item No-1 Excavation in all kinds of soil & Soft murum including boulders up to 0.6 m diameter (0.113 cum) for canal, seating of embankment, filter drains / catch water drains etc., and placing the excavated stuff neatly in dump area or for formation of service road / embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc. complete with leads as below and all lifts as directed. Basic rate as per SWCD/CSR2022-23 Section-2 Labour facilites (kamgar kalyan) 1% |
| 2 | Item No-2 Excavation in hard murum including boulders up to 0.6 m diameter (0.113 cum) for canal, seating of embankment, filter drains / catch water drains etc., and placing the excavated stuff neatly in dump area or for formation of service road / embankment including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc., complete with leads as below and all lifts as directed. Basic rate as per SWCD/CSR2022-23 Section-2 Labour facilites (kamgar kalyan) 1% |
| 3 | Item No - 3Excavation in soft rock without blasting including boulders up to 0.6 m diameter (0.113 cum) for canal, seating of embankment, filter drain / catch water drains etc., and placing the excavated soft rock neatly in dump area or for formation of service road including cost of all materials, machinery, labour, dressing bed sides to required level and profile etc. complete with leads as below and all lifts as directed. Basic rate as per SWCD/CSR2022-23 Section-2 Labour facilites (kamgar kalyan) 1% |
| 4 | Item No.15:- Providing casing embankment using selected pervious material available directly from excavation in layers including cost of all materials, machinery, labour, all other operations such as collection of material, spreading material in layer of specified thickness, sorting out, breaking clods, leveling. sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compactor including cost of water etc. complete with lead up to1 km and all lifts as directed. Basic rate as per SWCD/CSR2022-23 Section-2 Labour facilites (kamgar kalyan) 1% |
| 5 | ITEM NO. 31:- Providing and laying in situ cement concrete of grade M-15 of trap / granite / gneiss / quartzite / graded metal for PCC with or without surface reinforcement/ RCC concreting requiring heavy or special type of shuttering for works of gallery, sluice, spillway crest, spillway downstream face, energy dissipating structures, intake structures, training walls, piers, abutments etc. with Concrete Mixer with shuttering and scaffolding, placing, compacting, curing with an initial lead of 1 km and all lifts etc. complete as directed. Basic rate as per SWCD/CSR2022-23 Section-3 Extra lead charges for cement 0.26 255.23 Total 02 Labour facilites (kamgar kalyan) 1% |
| 6 | Extra Lead charges for requried materials for CNB M150Materials Dist in KM Qty Required/UnitAs Per Lead Chart/Cmt Metal25.00 0.89373.63 Sand45.00 0.45663.02Water5.001.0 57.85 |
| 7 | Providing, erecting, & laying steel shuttering form work and making surface for concreting including dismantling etc. Complete as direct.(69B)Basic Rate as Per SWCD/CSR2022-23 Section-3 Labour Facilites (kamgar kalyan) 1% |
| 8 | Providing, erecting, & laying steel shuttering form work and making surface for concreting including dismantling etc. Complete as direct. (70A)Basic Rate as Per SWCD/CSR2022-23 Section-3 Labour Facilites (kamgar kalyan) 1% |
| 9 | Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. Including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete as directed.Basic rate as per SWCD/CSR2022-23 Section-3Binding wireK g^ * Rate 6.0070.40Add extra lead charges30.00 KmLabour facilites (kamgar kalyan) 1% |
| 10 | Item No.23A :- Providing and constructing dry rubble rock-toe using rubble and stone chips from approved source including cost of all materials, machinery, labour, hand packing rubble and stone chips, finishing top and sides to required slopes etc., complete with lead up to 1 km and all lifts as directed.Basic rate as per SWCD/CSR2022-23 Section-3Add extra Lead charges Apron work.Materialsdist in km.Qty/unit. As per lead chart./cmt.Rubble5.00 1.00110.78Labour facilites (kamgar kalyan) 1% |
| 11 | GST 18% |
| 12 | Royalti Charges for Materials |