| 1 | (Supply Part of HT Line Ts.No. 77/2024-25) |
| 2 | HT Stay Set complete in all respect.(i/c Stay Clamp) |
| 3 | Nuts & Bolts off size. |
| 4 | Dis insulator Sets |
| 5 | Pin insulator |
| 6 | Stay wire (7/3.15mm) (7.0kg per Stay Set) |
| 7 | Cross Arm: Channel Iron (100x50x6mm) , length:1500mm x3 mm |
| 8 | Cross Arm ( Angle Iron 65x65x65) length:1800mmx3no |
| 9 | Steel Tubular Poles (11mtr long) |
| 10 | ACSR 6/1/3.35 (50mm^2) { includes 3 conductor length for 3phase and additional 1% (sa, jumpering and wastage} |
| 11 | Steel Tubular Poles (9mtr long) |
| 12 | Single Continous Earth wire (GI 8SWG) |
| 13 | Half Clamp |
| 14 | Aluminium Paint |
| 15 | Eye Hook for earth wire |
| 16 | Danger plate (250x200x1.6mm) |
| 17 | (Erection PartHT Line Ts.No. 77/2024-25) |
| 18 | Erection ofS/T Pole 11 mtr longfor (Single pole structure) a)Digging of Pit, b)Erection of pole C)Filling of pit+Ramming, D)Drilling of Holes in Poles & X-Arm, e) Fixing of insulator, X-Arm Knee Bracing Set, Top Clamp f) Fixing of Barbed wire, Danger Plate, g) Painting of pole, complete in all respect. |
| 19 | Erection ofS/T Pole 9 mtr longfor (Single pole structure) a)Digging of Pit, b)Erection of pole C)Filling of pit+Ramming, D)Drilling of Holes in Poles & X-Arm, e) Fixing of insulator, X-Arm Knee Bracing Set, Top Clamp f) Fixing of Barbed wire, Danger Plate, g) Painting of pole, complete in all respect. |
| 20 | Erection for Laying of Conductor (ACSR 6/1/3.35 (50mm²)), Stringing and Sagging including binding with insulator complete in all respect. |
| 21 | Erection of Laying and Sagging of GI Wire Guarding complete in all respect. |
| 22 | Erection of HT Stay sets a)Digging of Pit b)Ramming of Pit c) Nozzeling & Tightening d) fixing of Egg insulator complete in all respect. |
| 23 | Providing & Filling of RCC Muffs for Steel tubler Pole. 1800mm with concerete filling. |