Housing Urban and Rular Development Government Departments Closing in 0 days TDR #46964086

Tender For Under The Nabard Scheme, Widening And Strengthening Work From The Dahirpur Nala (Km 5) Of Jaunpur-Malhani-Khuthan Road To The Lumbini-Dudhi Road (Other District Road) Km 236. (Including 5-Year Maintenance) - Excavation For Roadwork In Soil With

Issued by Government Departments · jaunpur, Uttar Pradesh
Tender Value
6.12 Crore
Estimated cost
Bid Submission
04 Mar 2025
0 days left
EMD
12.24 Lakhs
Bank guarantee accepted
Document Fee
5590
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
jaunpur → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender For Under the NABARD scheme, widening and strengthening work from the Dahirpur Nala (km 5) of Jaunpur-Malhani-Khuthan road to the Lumbini-Dudhi road (other district road) km 236. (Including 5-year maintenance) - Excavation for roadwork in soil with hydraulic excavator including cutting and loading in uppers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections and transporting to the embankment location within all lifts and lead upto 1000m (including all taxes, labour cess etc but excluding GST.) 2 Construction of embankment with approved material obtained from borrow pits (lead 2.00 Km.) with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Cartage Earth upto 2 Km) (including all taxes, labour cess etc but excluding GST.) 3 Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. ( Compaction Only).(including all taxes, labour cess etc but excluding GST.) 4 Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 (including all taxes, labour cess etc but excluding GST.) 5 Scarifiying existing bituminos surface by machanical means disposal of scarified material within all lifts and leads up to 100m. (including all taxes, labour cess etc but excluding GST.) 6 Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (including all taxes, labour cess etc but excluding GST.) 7 Providing and applying primer coat with SS2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. (Including cost of material,Labour cess etc but Excluding Bitumen & GST.) 8 Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 4.5 per centby weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Including cost of material,Labour cess etc but Excluding Bitumen & GST.) 9 Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (Including cost of material,Labour cess etc but Excluding Bitumen & GST.) 10 Providing and laying bituminous concrete withhigher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder(VG-30) @ 5.4per centof mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Including cost of material,Labour cess etc but Excluding Bitumen & GST.) 11 Construction of subgrade and earthen shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrowpits ( lead2.00 Km.) with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement to Table 300-2 (without lead). (Including cost of all material and Labour, all taxes and labour Cess etc but Excluding Cost of GST) 12 Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MORTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. As per MORTH Sr.No. 13.10 and 710.1.4.of IRC:78 and 2200(including all taxes, labour cess etc but excluding GST.) 13 Plain cement concrete 1:3:6 with crushed stone nominal mix in foundation aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curring for 14 days. (including all taxes, labour cess etc but excluding GST.) 14 RCC Grade M30 using batching plant transit mixer & manual placing as per MORTH SI. No. 12.9 Case-II and specification No.1500, 1700, 2100 (including all taxes, labour cess etc but excluding GST.) 15 Supplying, fitting and placing HYSD reinforcement complete in sub-structure drawing as per and Technical Specification As per MORTH Sr.No. 12.40 and Specification No. 1600 (including all taxes, labour cess etc but excluding GST.) 16 Plain cement concrete in open foundation complete and as per drawing technical specifications. (M- 15) As per MORTH Sr.No. 12.8 and Specification No. 1500, 1700 & (including all taxes, labour cess etc but excluding GST.) 17 Providing and laying Pitching on slopes laid including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. As per MORTH Sr.No. 15.4 and Specification No. 2504(including all taxes, labour cess etc but excluding GST.) 18 Providing weep holes in Brick work /plain /reinforced concrete abutment, wing wall/ return wall with 100mm dia AC pipe extended through the full width of structure with slope of 1V:20H towards drawing foce. Complete as per drawing and technical specifications No. 2706 & 2200(including all taxes, labour cess etc but excluding GST.) 19 RCC Grade M20Plain/Reinforced Cement Concrete complete as per Drawing and Technical Specifications. 20 PART BMaintainance cost :- Maintainance cost will be paid year wise as perGovernment order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknoworder No. 3689COPRMC/Mul-23-24 Date 17.02.2024 . Maintainance cost will adjusted as per final cost of construction and will be paid accordingly. 21 1st year- maintainance cost 0%on Bituminous, CC & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 22 2nd year- maintainance cost 0.25% on Bituminous, CC & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 23 3rd year- maintainance cost 0.50 %on Bituminous, CC & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 24 4th year- maintainance cost 0.75% on Bituminous, CC & drain Work(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 25 5th year- maintainance cost 1.00 % on Bituminous, CC & drain Work(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 07-Jan-2025 Date 7 Date 13-Jan-2025
2 13-Jan-2025 DateCorrigendum12 Date 21-Jan-2025
3 21-Jan-2025 Date 45 Date 25-Jan-2025
4 25-Jan-2025 Date 40 Date 28-Jan-2025
5 27-Jan-2025 DateCorrigendum 17 Date 04-Feb-2025
6 04-Feb-2025 Date 6D Date 07-Feb-2025
7 07-Feb-2025 Date 5D Date 11-Feb-2025
8 11-Feb-2025 Date 7D Date 15-Feb-2025
9 15-Feb-2025 Date 8D Date 19-Feb-2025
10 19-Feb-2025 Date 6C Date 25-Feb-2025
11 25-Feb-2025 Date 7Dd Date 04-Mar-2025

BOQ

Name of WorktkSuiqj eYguh [kqVgu ekxZ ds fdeh05 nghjiqj ukys ls yqfEcuh nq)h ekxZ ds fdeh0 236 rd ¼vU; ftyk ekx½ pkSM+hdj.k ,oa lqn`<+hdj.k dk dk;ZA
Sl. No. Item Description
1Excavation for roadwork in soil with hydraulic excavator including cutting and loading in uppers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections and transporting to the embankment location within all lifts and lead upto 1000m (including all taxes, labour cess etc but excluding GST.)
2Construction of embankment with approved material obtained from borrow pits (lead 2.00 Km.) with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Cartage Earth upto 2 Km) (including all taxes, labour cess etc but excluding GST.)
3Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. ( Compaction Only).(including all taxes, labour cess etc but excluding GST.)
4Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 (including all taxes, labour cess etc but excluding GST.)
5Scarifiying existing bituminos surface by machanical means disposal of scarified material within all lifts and leads up to 100m. (including all taxes, labour cess etc but excluding GST.)
6Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (including all taxes, labour cess etc but excluding GST.)
7Providing and applying primer coat with SS2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. (Including cost of material,Labour cess etc but Excluding Bitumen & GST.)
8Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 4.5 per centby weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Including cost of material,Labour cess etc but Excluding Bitumen & GST.)
9Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (Including cost of material,Labour cess etc but Excluding Bitumen & GST.)
10Providing and laying bituminous concrete withhigher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder(VG-30) @ 5.4per centof mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Including cost of material,Labour cess etc but Excluding Bitumen & GST.)
11Construction of subgrade and earthen shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrowpits ( lead2.00 Km.) with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement to Table 300-2 (without lead). (Including cost of all material and Labour, all taxes and labour Cess etc but Excluding Cost of GST)
12Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MORTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. As per MORTH Sr.No. 13.10 and 710.1.4.of IRC:78 and 2200(including all taxes, labour cess etc but excluding GST.)
13Plain cement concrete 1:3:6 with crushed stone nominal mix in foundation aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curring for 14 days. (including all taxes, labour cess etc but excluding GST.)
14RCC Grade M30 using batching plant transit mixer & manual placing as per MORTH SI. No. 12.9 Case-II and specification No.1500, 1700, 2100 (including all taxes, labour cess etc but excluding GST.)
15Supplying, fitting and placing HYSD reinforcement complete in sub-structure drawing as per and Technical Specification As per MORTH Sr.No. 12.40 and Specification No. 1600 (including all taxes, labour cess etc but excluding GST.)
16Plain cement concrete in open foundation complete and as per drawing technical specifications. (M- 15) As per MORTH Sr.No. 12.8 and Specification No. 1500, 1700 & (including all taxes, labour cess etc but excluding GST.)
17Providing and laying Pitching on slopes laid including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. As per MORTH Sr.No. 15.4 and Specification No. 2504(including all taxes, labour cess etc but excluding GST.)
18Providing weep holes in Brick work /plain /reinforced concrete abutment, wing wall/ return wall with 100mm dia AC pipe extended through the full width of structure with slope of 1V:20H towards drawing foce. Complete as per drawing and technical specifications No. 2706 & 2200(including all taxes, labour cess etc but excluding GST.)
19RCC Grade M20Plain/Reinforced Cement Concrete complete as per Drawing and Technical Specifications.
20PART BMaintainance cost :- Maintainance cost will be paid year wise as perGovernment order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknoworder No. 3689COPRMC/Mul-23-24 Date 17.02.2024 . Maintainance cost will adjusted as per final cost of construction and will be paid accordingly.
211st year- maintainance cost 0%on Bituminous, CC & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
222nd year- maintainance cost 0.25% on Bituminous, CC & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
233rd year- maintainance cost 0.50 %on Bituminous, CC & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
244th year- maintainance cost 0.75% on Bituminous, CC & drain Work(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
255th year- maintainance cost 1.00 % on Bituminous, CC & drain Work(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

AI Tender Summary

OUR REF NO 46964086
AUTHORITY Government Departments
TENDER VALUE 6.12 Crore
LAST DATE 04-03-2025
Authority
Authority Name Public Works Department
Work Description Tender For Under the NABARD scheme, widening and strengthening work from the Dahirpur Nala (km 5) of Jaunpur-Malhani-Khuthan road to the Lumbini-Dudhi road (other district road) km 236. (Including 5-year maintenance) - Excavation for roadwork in soil with hydraulic excavator including cutting and loading in uppers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections and transporting to the embankment location within all lifts and lead upto 1000m (including all taxes, labour cess etc but excluding GST.) 2 Construction of embankment with approved material obtained from borrow pits (lead 2.00 Km.) with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Cartage Earth upto 2 Km) (including all taxes, labour cess etc but excluding GST.) 3 Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. ( Compaction Only).(including all taxes, labour cess etc but excluding GST.) 4 Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 (including all taxes, labour cess etc but excluding GST.) 5 Scarifiying existing bituminos surface by machanical means disposal of scarified material within all lifts and leads up to 100m. (including all taxes, labour cess etc but excluding GST.) 6 Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (including all taxes, labour cess etc but excluding GST.) 7 Providing and applying primer coat with SS2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. (Including cost of material,Labour cess etc but Excluding Bitumen & GST.) 8 Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 4.5 per centby weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Including cost of material,Labour cess etc but Excluding Bitumen & GST.) 9 Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (Including cost of material,Labour cess etc but Excluding Bitumen & GST.) 10 Providing and laying bituminous concrete withhigher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder(VG-30) @ 5.4per centof mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Including cost of material,Labour cess etc but Excluding Bitumen & GST.) 11 Construction of subgrade and earthen shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrowpits ( lead2.00 Km.) with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement to Table 300-2 (without lead). (Including cost of all material and Labour, all taxes and labour Cess etc but Excluding Cost of GST) 12 Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MORTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. As per MORTH Sr.No. 13.10 and 710.1.4.of IRC:78 and 2200(including all taxes, labour cess etc but excluding GST.) 13 Plain cement concrete 1:3:6 with crushed stone nominal mix in foundation aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curring for 14 days. (including all taxes, labour cess etc but excluding GST.) 14 RCC Grade M30 using batching plant transit mixer & manual placing as per MORTH SI. No. 12.9 Case-II and specification No.1500, 1700, 2100 (including all taxes, labour cess etc but excluding GST.) 15 Supplying, fitting and placing HYSD reinforcement complete in sub-structure drawing as per and Technical Specification As per MORTH Sr.No. 12.40 and Specification No. 1600 (including all taxes, labour cess etc but excluding GST.) 16 Plain cement concrete in open foundation complete and as per drawing technical specifications. (M- 15) As per MORTH Sr.No. 12.8 and Specification No. 1500, 1700 & (including all taxes, labour cess etc but excluding GST.) 17 Providing and laying Pitching on slopes laid including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. As per MORTH Sr.No. 15.4 and Specification No. 2504(including all taxes, labour cess etc but excluding GST.) 18 Providing weep holes in Brick work /plain /reinforced concrete abutment, wing wall/ return wall with 100mm dia AC pipe extended through the full width of structure with slope of 1V:20H towards drawing foce. Complete as per drawing and technical specifications No. 2706 & 2200(including all taxes, labour cess etc but excluding GST.) 19 RCC Grade M20Plain/Reinforced Cement Concrete complete as per Drawing and Technical Specifications. 20 PART BMaintainance cost :- Maintainance cost will be paid year wise as perGovernment order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknoworder No. 3689COPRMC/Mul-23-24 Date 17.02.2024 . Maintainance cost will adjusted as per final cost of construction and will be paid accordingly. 21 1st year- maintainance cost 0%on Bituminous, CC & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 22 2nd year- maintainance cost 0.25% on Bituminous, CC & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 23 3rd year- maintainance cost 0.50 %on Bituminous, CC & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 24 4th year- maintainance cost 0.75% on Bituminous, CC & drain Work(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 25 5th year- maintainance cost 1.00 % on Bituminous, CC & drain Work(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Basic Detail
Tender No 5136/Camp/SE Tender/jnp-gzp circle/24 date 07-12-2024
Bidding Type Tender
Location
City jaunpur
State Uttar Pradesh
Key Dates
Publish Date 25 Feb 2025
Submission Date 04 Mar 2025
Open Date 04 Mar 2025
Finance
Tender Value 6.12 Crore
Tender Fee 5590
EMD 12.24 Lakhs
Exemption Available
Document List
5143c64c-8850-4500-a498-9a21381f8a7d.html
AdendumDahirpur.pdf
BOQ_1743585.xls
SBD1.pdf
SBD2.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Feb 25, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
Jan 13, 2025
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 21, 2025
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 25, 2025
18:00 IST

Corrigendum-3 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 28, 2025
18:00 IST

Corrigendum-4 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 04, 2025
18:00 IST

Corrigendum-5 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 07, 2025
18:00 IST

Corrigendum-6 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 11, 2025
18:00 IST

Corrigendum-7 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 15, 2025
18:00 IST

Corrigendum-8 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 19, 2025
18:00 IST

Corrigendum-9 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 25, 2025
18:00 IST

Corrigendum-10 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 04, 2025
18:00 IST

Corrigendum-11 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 04, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Mar 04, 2025

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

5143c64c-8850-4500-a498-9a21381f8a7d.html

pdf

AdendumDahirpur.pdf

xls

BOQ_1743585.xls

pdf

SBD1.pdf

pdf

SBD2.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender