Name of Work: CONST. OF FOOTPATH FROM BRINAN HOUSE TOWARDS DEVEN HOUSE, SANSAD IX(A)
Sl. No.
Item Description
1
Surface dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed.
2
Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming.
3
Cost of stone boulder 150 mm size delivered ans stacked at site.
4
Hire and labour charges for shuttering with centering and necessary staging(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction ofEngineer-In-Charge. Squpto 4 m using approved stout props and thick hard wood planks of approvedthickness with required bracing for concrete slabs, beams and columns,lintels curved or straight including fitting, fixing and striking out aftercompletion of works (upto roof of ground floor(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of
5
Ordinary cement concrete(mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttring and reinforcement, if any, in ground floor as per relevant IS codes. (b) River bazree.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.