| 1 | Towan Hall |
| 2 | Site clearing work SI NO. 259 |
| 3 | E/work in filling up to 3kmin black cotton soil in bundelkhand area SI NO. 253 |
| 4 | E/work in excavation in black cotton soil in bundelkhand area requiring use of special tools and plants such as pick axes and sabbal etc. S.I. NO. 257 |
| 5 | Stone dust filling in plinth including supply of necessary quantity of sand approved quarry from the site of work & including watering, dressing etc. Rate to include cost of all materials, labour and tools & plants etc. |
| 6 | R.c.c work 1:2:4 withcement, coarse sand &20mm stone grit including centering and shutteringbut excluding cost of reinforcement. Ch. No. 5 |
| 7 | Mild steel or iron work in plain worksuch as reinfprced cement concrete wrought to required shape as necessery including bending for proper complition of the workand including supply of all steel and wastage & overlapping & hooks. Ch. 10 504 |
| 8 | Dismanting cement concrete or brick or granolithic floors including base concrete and including stacking of dismantled materials as directed by Engineer-in-charge with in a distance of 60 mt. (200 feet) SI NO. 697 |
| 9 | Provinding and laying Granual Sub Base (G.S.B) including all materials, labour, T&P etc complete. |
| 10 | M-150 Class brickwork with 1:4 cement &coarse sand mortar in foundation up to plinth etc. all comp. S.I.NO. 305 |
| 11 | 12mm thick cement plaster with 1:4 cement &sand mortar etc. all comp.S.I.NO. 17.58 |
| 12 | laying of 80 mm thick interlocking CC block laid in stone dust base & fill joint with2.36 mm stone dust at joint filled with S/D after laveling & dressing base including all materials labour T&P etc. New 9tem3 |
| 13 | Providing & laying of 80 mm thick interlocking CC block laid in stone dust base & fill joint with2.36 mm stone dust at joint filled with S/D after laveling & dressing base including all materials labour T&P etc.New9tem3 |
| 14 | Providing and Laying Cement conc. With 1:2:4 cement ,coarse sand & 20mm gauge stone/ballast etc. all comp. (Rate as per S.I.NO. New item (a)) |
| 15 | Cement concrete flooring 1:2:4 (1 cement :2 coarse sand :4 graded stone aggregate of size 20 mm nominal size) laid in one layer finished with floating cost of neat cement (40 mm thick floor) |
| 16 | Mild steel or iron work in small of size such as trusses , roof work of wrought to requirsd shape & size including cutting ,welding and grinding as reired for completion of work S.I. NO. 504 |
| 17 | Painting or varnishing on new work with one coat of mixing primer and one coat of superior quality paint or varnish i/c all complete as directed by engineer in charge as of chapter 15 |
| 18 | Providing and applyiong P.O.P. of 2 mm thickness over plastered surface .. Ch- 15 new item no. 13.26 |
| 19 | Painting of wall with one priming coat and one coat oil distempered on new work but two coat after the first coat including all.Ch 15 item( 649+650+651) |