| 1 | FCBT (Feed Condensate and Booster Pump) - FCBT 1(SERVICE COST) |
| 2 | (a) Inspection of Feed pump and condensate pump PTFE bearing along with pencil filters, renew if required. |
| 3 | (b) Misalignment in FCBT hand turning tool slot observed, adjustment of FCBT casing/ Manufacturing of FCBT turning tool as per casing. |
| 4 | (c) Overhauling of regulating wheel along with auto/ manual change over mechanism. |
| 5 | (d) Repair/ renewal of sentinel valve followed by setting and hot trials. |
| 6 | (e) High vibration observed on condensate pump top, inspection of bearing and overhauling of pump if required. |
| 7 | (f) Renewal of working water filter body, change over filter mechanism and elements. QTY- 04. |
| 8 | (g) Overhauling of HP drain 3-way valve view not holding. |
| 9 | (h) Tuning and setting to work of PDR to achieve automatic and remote operation. |
| 10 | (i) Gland packing renewal and tightening of feed pump and condensate pump. |
| 11 | (j) Overhauling of manipulators inclusive of electrical backplane and securing cover. |
| 12 | (k) Operationalization of axial float mechanism of turbine. |
| 13 | (l) Renewal of cooling manifold including diamond flange followed by application of putty. |
| 14 | (m) Overhauling of mechanical control elements inclusive of PDR unit, booster relay, Protection and regulation block, lock up relay. |
| 15 | (n) Operationalization of FCBT RPM indicator. |
| 16 | (o) Hot SDCs of the FCBT pump to be proved. |
| 17 | (p) Ultrasonic thickness gauging of Turbine Casing. |
| 18 | FCBT (Feed Condensate and Booster Pump) - FCBT 2 & 3(SERVICE COST) |
| 19 | (a) Inspection of Feed pump and condensate pump PTFE bearing along with pencil fitters, renew if required. |
| 20 | (b) Overhauling of regulating wheel along with auto/ manual change over mechanism. |
| 21 | (c) Repair/ renewal of sentinel valve followed by setting and hot trials. |
| 22 | (d) Renewal of working water filter body, change over filter mechanism and elements. QTY –04. |
| 23 | (e) Overhauling of HP drain 3-way valve view not holding. |
| 24 | (f) Tuning and setting to work of PDR to achieve automatic and remote operation. |
| 25 | (g) Gland packing renewal and tightening of feed pump and condensate pump. |
| 26 | (h) Overhauling of manipulators inclusive of electrical backplane and securing cover. |
| 27 | (i) Renewal of cooling manifold including diamond flange followed by application of putty. |
| 28 | (j) Overhauling of mechanical control elements inclusive of PDR unit, booster relay. Protection and regulation block, lock up relay. |
| 29 | (k) Operationalization of FCBT RPM indicator. |
| 30 | (l) Hot SDCs of the FCBT pump to be proved. |
| 31 | FCBT (Feed Condensate and Booster Pump) - FCBT 4 & 6 (SERVICE COST) |
| 32 | (a) High vibrationsobservedduringoperation . Under inspection FCBT pumps and Box assembly, overhauling/ renew as necessary. |
| 33 | (b) Overhauling of regulating wheel along with auto/ manual change over mechanism. |
| 34 | (c) Repair/ renewal of sentinel valve followed by setting and hot trials. |
| 35 | (d) Renewal of working water filter body, change over filter mechanism and elements. QTY- 04. |
| 36 | (e) Overhauling of HP drain 3-way valve view not holding. |
| 37 | (f) Tuning and setting to work of PDR to achieve automatic and remote operation. |
| 38 | (g) Gland packing renewal and tightening of feed pump and condensate pump. |
| 39 | (h) Overhauling of manipulators inclusive of electrical backplane and securing cover. |
| 40 | (i) Renewal of cooling manifold including diamond flange followed by application of putty. |
| 41 | (j) Overhauling of mechanical control elements inclusive of PDR unit, booster relay, Protection and regulation block, lock up relay. |
| 42 | (k) Operationalization of FCBT RPM indicator. |
| 43 | (l) Hot SDCs of the FCBT pump to be proved. |
| 44 | FCBT (Feed Condensate and Booster Pump) - FCBT 5 (SERVICE COST) |
| 45 | (a) Inspection of Feed pump and condensate pump PTFE being along with pencil filters Renew if required. |
| 46 | (b) Overhauling of regulating wheel along with auto/ manual change over mechanism. |
| 47 | (c) Repair renewal of sentinel valve followed by setting and hot trials. |
| 48 | (d) Renewal of working water filter body, change over filter mechanism and elements. QTY-04. |
| 49 | (e) Overhauling of HP drain 3-way valve view not holding. |
| 50 | (f) Tuning and setting to work of PDR to achieve automatic and remote operation. |
| 51 | (g) Gland packing renewal and tightening of feed pump and condensate pump. |
| 52 | (h) Overhauling of manipulators inclusive of electrical backplane and securing cover. |
| 53 | (i) Renewal of cooling manifold including diamond flange followed by application of putty. |
| 54 | (j) Overhauling of mechanical control elements inclusive of PDR unit, booster relay. Protection and regulation block, lock up relay. |
| 55 | (k) Operationalization of FCBT RPM indicator. |
| 56 | (l) Hot SDCs of the FCBT pump to be proved. |
| 57 | FCBT (Feed Condensate and Booster Pump) - FCBT 7 & 8 (SERVICE COST) |
| 58 | (a)Inspection of Feed pump and condensate pump PTFE bearing along with pencil filters, renew if required. |
| 59 | (b) Misalignment in FCBT hand turning tool slot observed, adjustment of FC8T casing / Manufacturing of FCBT turning tool as per casing. |
| 60 | (c) Overhauling of regulating wheel along with auto/ manual change over mechanism. |
| 61 | (d) Repair/ renewal of sentinel valve followed by setting and hot trials. |
| 62 | (e) High vibration observed on condensate pump top, inspection of bearing and overhauling of pump if required. |
| 63 | (f) Renewal of working water filter body, change over fitter mechanism and elements. QTY – 04. |
| 64 | (g) Overhauling of HP drain 3-way valve view not holding. |
| 65 | (h) Tuning and setting to work of PDR to achieve automatic and remote operation. |
| 66 | (i) Gland packing renewal and tightening of feed pump and condensate pump. |
| 67 | (j) Overhauling of manipulators inclusive of electrical backplane and securing cover. |
| 68 | (k) Operationalization of axial float mechanism of turbine. |
| 69 | (l) Renewal of cooling manifold including diamond flange followed by application of putty. |
| 70 | (m) Overhauling of mechanical control elements inclusive of PDR unit, booster relay, Protection and regulation block, lock up relay. |
| 71 | (n) Operationalization of FCBT RPM indicator. |
| 72 | (o) Hot SDCs of the FCBT pump to be proved. |
| 73 | (p) Ultrasonic thickness gauging of Turbine Casing. |
| 74 | Hot Lagging & Cladding (SERVICE COST) |
| 75 | 1. 42. 5 Cladding over Steam auxiliary machineries1.42.5.3 FCBT |
| 76 | Boilers and TD Auxiliaries (SERVICE COST) |
| 77 | 1.102 Repair of Outer Insulation materials and Cement lagging TD Auxilliaries (FCBTs) |
| 78 | FCBT (Feed Condensate and Booster Pump) - FCBT 1(MATERIAL COST) |
| 79 | (a) Inspection of Feed pump and condensate pump PTFE bearing along with pencil filters, renew if required. |
| 80 | (b) Misalignment in FCBT hand turning tool slot observed, adjustment of FCBT casing/ Manufacturing of FCBT turning tool as per casing. |
| 81 | (c) Overhauling of regulating wheel along with auto/ manual change over mechanism. |
| 82 | (d) Repair/ renewal of sentinel valve followed by setting and hot trials. |
| 83 | (e) High vibration observed on condensate pump top, inspection of bearing and overhauling of pump if required. |
| 84 | (f) Renewal of working water filter body, change over filter mechanism and elements. QTY- 04. |
| 85 | (g) Overhauling of HP drain 3-way valve view not holding. |
| 86 | (h) Tuning and setting to work of PDR to achieve automatic and remote operation. |
| 87 | (i) Gland packing renewal and tightening of feed pump and condensate pump. |
| 88 | (j) Overhauling of manipulators inclusive of electrical backplane and securing cover. |
| 89 | (k) Operationalization of axial float mechanism of turbine. |
| 90 | (l) Renewal of cooling manifold including diamond flange followed by application of putty. |
| 91 | (m) Overhauling of mechanical control elements inclusive of PDR unit, booster relay, Protection and regulation block, lock up relay. |
| 92 | (n) Operationalization of FCBT RPM indicator. |
| 93 | (o) Hot SDCs of the FCBT pump to be proved. |
| 94 | (p) Ultrasonic thickness gauging of Turbine Casing. |
| 95 | FCBT (Feed Condensate and Booster Pump) - FCBT 2 & 3(MATERIAL COST) |
| 96 | (a) Inspection of Feed pump and condensate pump PTFE bearing along with pencil fitters, renew if required. |
| 97 | (b) Overhauling of regulating wheel along with auto/ manual change over mechanism. |
| 98 | (c) Repair/ renewal of sentinel valve followed by setting and hot trials. |
| 99 | (d) Renewal of working water filter body, change over filter mechanism and elements. QTY –04. |
| 100 | (e) Overhauling of HP drain 3-way valve view not holding. |
| 101 | (f) Tuning and setting to work of PDR to achieve automatic and remote operation. |
| 102 | (g) Gland packing renewal and tightening of feed pump and condensate pump. |
| 103 | (h) Overhauling of manipulators inclusive of electrical backplane and securing cover. |
| 104 | (i) Renewal of cooling manifold including diamond flange followed by application of putty. |
| 105 | (j) Overhauling of mechanical control elements inclusive of PDR unit, booster relay. Protection and regulation block, lock up relay. |
| 106 | (k) Operationalization of FCBT RPM indicator. |
| 107 | (l) Hot SDCs of the FCBT pump to be proved. |
| 108 | FCBT (Feed Condensate and Booster Pump) - FCBT 4 & 6 (MATERIAL COST) |
| 109 | (a) High vibrationsobservedduringoperation . Under inspection FCBT pumps and Box assembly, overhauling/ renew as necessary. |
| 110 | (b) Overhauling of regulating wheel along with auto/ manual change over mechanism. |
| 111 | (c) Repair/ renewal of sentinel valve followed by setting and hot trials. |
| 112 | (d) Renewal of working water filter body, change over filter mechanism and elements. QTY- 04. |
| 113 | (e) Overhauling of HP drain 3-way valve view not holding. |
| 114 | (f) Tuning and setting to work of PDR to achieve automatic and remote operation. |
| 115 | (g) Gland packing renewal and tightening of feed pump and condensate pump. |
| 116 | (h) Overhauling of manipulators inclusive of electrical backplane and securing cover. |
| 117 | (i) Renewal of cooling manifold including diamond flange followed by application of putty. |
| 118 | (j) Overhauling of mechanical control elements inclusive of PDR unit, booster relay, Protection and regulation block, lock up relay. |
| 119 | (k) Operationalization of FCBT RPM indicator. |
| 120 | (l) Hot SDCs of the FCBT pump to be proved. |
| 121 | FCBT (Feed Condensate and Booster Pump) - FCBT 5 (MATERIAL COST) |
| 122 | (a) Inspection of Feed pump and condensate pump PTFE being along with pencil filters Renew if required. |
| 123 | (b) Overhauling of regulating wheel along with auto/ manual change over mechanism. |
| 124 | (c) Repair renewal of sentinel valve followed by setting and hot trials. |
| 125 | (d) Renewal of working water filter body, change over filter mechanism and elements. QTY-04. |
| 126 | (e) Overhauling of HP drain 3-way valve view not holding. |
| 127 | (f) Tuning and setting to work of PDR to achieve automatic and remote operation. |
| 128 | (g) Gland packing renewal and tightening of feed pump and condensate pump. |
| 129 | (h) Overhauling of manipulators inclusive of electrical backplane and securing cover. |
| 130 | (i) Renewal of cooling manifold including diamond flange followed by application of putty. |
| 131 | (j) Overhauling of mechanical control elements inclusive of PDR unit, booster relay. Protection and regulation block, lock up relay. |
| 132 | (k) Operationalization of FCBT RPM indicator. |
| 133 | (l) Hot SDCs of the FCBT pump to be proved. |
| 134 | FCBT (Feed Condensate and Booster Pump) - FCBT 7 & 8 (MATERIAL COST) |
| 135 | (a)Inspection of Feed pump and condensate pump PTFE bearing along with pencil filters, renew if required. |
| 136 | (b) Misalignment in FCBT hand turning tool slot observed, adjustment of FC8T casing / Manufacturing of FCBT turning tool as per casing. |
| 137 | (c) Overhauling of regulating wheel along with auto/ manual change over mechanism. |
| 138 | (d) Repair/ renewal of sentinel valve followed by setting and hot trials. |
| 139 | (e) High vibration observed on condensate pump top, inspection of bearing and overhauling of pump if required. |
| 140 | (f) Renewal of working water filter body, change over fitter mechanism and elements. QTY – 04. |
| 141 | (g) Overhauling of HP drain 3-way valve view not holding. |
| 142 | (h) Tuning and setting to work of PDR to achieve automatic and remote operation. |
| 143 | (i) Gland packing renewal and tightening of feed pump and condensate pump. |
| 144 | (j) Overhauling of manipulators inclusive of electrical backplane and securing cover. |
| 145 | (k) Operationalization of axial float mechanism of turbine. |
| 146 | (l) Renewal of cooling manifold including diamond flange followed by application of putty. |
| 147 | (m) Overhauling of mechanical control elements inclusive of PDR unit, booster relay, Protection and regulation block, lock up relay. |
| 148 | (n) Operationalization of FCBT RPM indicator. |
| 149 | (o) Hot SDCs of the FCBT pump to be proved. |
| 150 | (p) Ultrasonic thickness gauging of Turbine Casing. |
| 151 | Hot Lagging & Cladding (MATERIAL COST) |
| 152 | 1. 42. 5 Cladding over Steam auxiliary machineries1.42.5.3 FCBT |
| 153 | Boilers and TD Auxiliaries (MATERIAL COST) |
| 154 | 1.102 Repair of Outer Insulation materials and Cement lagging TD Auxilliaries (FCBTs) |