| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 06-02-2025 | Corrigendum 6 | Date | 13-02-2025 |
| 2 | 30-01-2025 | Corrigendum 5 | Date | 06-02-2025 |
| 3 | 23-01-2025 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 30-01-2025 |
| 4 | 17-01-2025 | Corrigendum 3 | Technical Bid | 23-01-2025 |
| 5 | 16-01-2025 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 23-01-2025 |
| 6 | 04-01-2025 | Corrigendum 1 | BOQ | 16-01-2025 |
| 7 | 27-12-2024 | UN PRICE SCHEDULE | Technical Bid | 16-01-2025 |
| Sl. No. | Item Description |
| 1 | SUPPLY OF PRIMERS & PAINTS (Supply shall be as per preferred makes mentioned in Appendix-A) |
| 2 | Supply of Primers & Paints for Plant & Equipment, Pipe lines, valves, compensators, all type supports, fittings etc. and all Steel structures covered under packages (SE-752A & SE-814) including schedule Sl. 07.06 as per Appendix-A or as per the recommendation of BSL/MECON.Quantity of paints shall be estimated progressively during application by the successful tenderer. |
| 3 | Supply of bituminous paint, wrapping tape on pipe surface of Fire Fighting System |
| 4 | Supply of fire-retardant paint on cables |
| 5 | Supply of fire barrier (fire sealant) at the opening of walls, floors for entry / exit of cables |
| 6 | SUPPLY OF ELECTRICS FOR TOPR & CONSTRUCTION POWER SUPPLY |
| 7 | Free standing, floor mounted, modular type Construction power supply board.(I/c - 400Ax1: OG - 63Ax3, 250Ax1, 100Ax3) |
| 8 | Sheet steel clad, wall mounted Sub-Lighting distribution board (SLDB) |
| 9 | Industrial Well glass fittings, integral type suitable for 40 W LED Light fitting complete with control gear etc. (efficacy >1.10) |
| 10 | Industrial Flood Light fittings, integral type suitable for 200 W LED Light fitting complete with control gear etc. (efficacy >1.10). |
| 11 | 24 V, 250V Lighting Transformer 415 /24V, in sheet steel enclosure with 15/5A combination switch/socket for TOPR |
| 12 | 3-Way Junction Box, in 2 mm in sheet steel enclosure (Size: 200 x 200 x 100 mm) with elemex connectors. |
| 13 | XLPE insulated power cable of size 3.5x185 sq. mm on existing structure or buried underground from BSL’s existing Substation up to the the construction board |
| 14 | XLPE insulated 1.1kV, 4C x 16 sq. mm grade Al. Armoured Power cable for lighting conforming to TS |
| 15 | XLPE insulated 1.1kV, 3C x 2.5 sq. mm grade Cu. Armoured Power cable for lighting conforming to TS |
| 16 | XLPE insulated 1.1kV, 2C x 2.5 sq. mm grade Cu. Armoured Power cable for lighting conforming to TS |
| 17 | Cable glands, termination sleeves / ferules, lugs, marker, tape, etc. for termination of 3.5C x 185 sq. mm grade Al. Armoured Power cable. |
| 18 | Cable glands, termination sleeves / ferules, lugs, marker, tape, etc. for termination of 4C x 16 sq. mm grade Al. Armoured Power cable for lighting. |
| 19 | Cable glands, termination sleeves / ferules, lugs, marker, tape, etc. for termination (Both ends) of 3C x 2.5 sq. mm grade Cu. Armoured Power cable for lighting. |
| 20 | Cable glands, termination sleeves / ferules, lugs,marker, tape, etc. for termination of 2C x 2.5 sq. mm grade Cu. Armoured Power cable for lighting. |
| 21 | Earthing material including GI strips, flats, cable tray, conduits, pipes etc. |
| 22 | Consumables including cable glands, lugs, ferrules, tapes, termination kit etc. |
| 23 | SUPPLY OF STRUCTUREa. Quantities indicated in the schedule of items are approximate. Final quantity of actual execution shall be calculated based on drawing weight and may vary (+/-15%). b. Only sheets of standard length and width shall be supplied.c. Steel may be procured from any integrated steel producers /SAIL.d. Drawings shall be issued to the successful tenderer progressively to match the overall schedule of the Project.e. Inspection, testing including radiographic & ultrasonic testing and commissioning of all steel structures if any shall be the part of the scope of work of the bidder.Refer clause 1.2, Chapter-4, Chapter-5 & Chapter 6 of TS No. MEC/S/E254/A/10/12/0814 for detailed scope of work before quote |
| 24 | Procurement& Supplyof 22G thick , CGS ( Corrugated Galvanized sheets, Zinc coating 275g/m2)sheeting for TOPR,Protective shed, including sheeting for other miscellaneous areas along with ridge pieces (1.0 mm thick plain galvanized sheet) as per technical specification and drawings (Net laid area to be measured). |
| 25 | Procurement & Supply of Plain GI sheets 1.0 mm thicksheeting for “Lift structures” side cladding as per technical specification and drawings . Zinc coating 275g/m2(Net laid area to be measured). |
| 26 | Procurement & Supply ofPlain GI sheets 1.6 mm thicksheeting for “Lift structures” Door side cladding as per technical specification and drawings . Zinc coating 275g/m2(Net laid area to be measured). |
| 27 | SUPPLY OF STEEL STRUCTURES AS PER SITE REQUIREMENT |
| 28 | Supply of Steel Structures (angle, channel, plates, chequered plates, beams etc.) for fabrication as per site requirement. |
| 29 | SUPPLY OF PIPE, FITTINGS, FASTENERS ETC. AS PER SITE REQUIREMENT |
| 30 | a) Supply of Pipes, fittings, fasteners etc. as per site requirement. |
| 31 | b) Supply of Gaskets (non asbestos). |
| 32 | Tenderer to note that supply of woods for charging into ovens before charging of coal into ovens during commissioning is also under scope of supply. The cost of same shall also be included in price.[Size (100-150) x (400-500) x (100-150)] |
| 33 | FABRICATION OF STEEL STRUCTURES AND PIPE LINES FITTINGS ETC. AS PER SITE REQUIREMENT |
| 34 | Fabrication of steel structures and Pipe lines & fittings etc. as per site requirement of items specified in schedule Sl. No. 07.01(IV & V).(Erection rate shall be as per Sl. No. 07.11 (SE-814) for structural items and as per Sl. No. 07.04 (VII) for pipes & fittings etc. |
| 35 | DISMANTLINGDismantled material will be disposed-off approx. 8 km from work site or as directed by MECON / BSL(Refer clause 02.0, 03.0 & 04.01 of TS No. MEC/S/E254/A/10/C1/0752 for detailed scope before quoting) PLANT & EQUIPMENTDismantling of pipe line in By-Product area. Including civil and structural dismantling if required.(Refer clause 02.0, 03.0 & 04.0 of TS No. MEC/S/E254/A/10/C1/0752 for detailed scope before quoting) |
| 36 | MS Pipeline in by-product area consisting of Pipe DN700 – 580 m & Pipe DN500 – 100 m from existing trestle / route including valves, pipe & fittings.Supports & maintenance platforms of above pipe line shall be dismantled in case of damaged one or as per instruction of engineer-in-charge. |
| 37 | Service water pump-21 (2950 m3/hr capacity, 39 m head) - Dismantling of 1 no. service water pump-21 along with motor, electrics and associated accessories etc. at same existing position in service water pump house. |
| 38 | Dismantling of Temporary Stoves for Pre-Heating with 4 nos. end supports |
| 39 | Dismantling of Temporary Heating up Pipelines with supports etc. |
| 40 | Dismantling of two nos. 5T x 15m span under-slung cranes along with assiciated electrics and accessories etc. |
| 41 | Dismantling of CO gas header DN 600 at Coal Tower (upto ~20m) |
| 42 | Dismantling of Tracks (CR100 /52 kg rail) |
| 43 | DISMANTLINGDismantled material will be disposed-off approx. 8 km from work site or as directed by MECON / BSL(Refer clause 02.0, 03.0 & 04.01 of TS No. MEC/S/E254/A/10/C1/0752 for detailed scope before quoting) STRUCTURESRefer clause 1.2, Chapter-4, Chapter-5 & Chapter 6 of TS No. MEC/S/E254/A/10/12/0814 for detailed scope of work before quote. |
| 44 | Dismantling ofTOPRRoof Structures alongwith 2 Nos. Under slung Crane supporting beamsincluding handling, transporting and stacking in sequence to a max. distance of8 km from worksite or as directed by the MECON / BSL, submission of handing over certificate from BSL authority. |
| 45 | Dismantling ofTOPRStructuressheetings only, handling, transporting and stacking in sequence to a max. distance of8 km from worksite or as directed by the MECON / BSL, submission of handing over certificate from BSL authority.(Net laid area to be measured) |
| 46 | Dismantling of steel structures of Protective Shed, Old Lift welland all other steel structures for which dismantling is mentioned under scope of work ,including handling, transporting & stacking the dismantled material to a distance of max.8 km from worksite or as directed by the MECON / BSL. |
| 47 | Dismantling of Sheeting of Protective Shed, Old Lift and all other steel structures for which dismantling is mentioned under scope of work , including handling, transporting the dismantled material to a distance of max.8 km from worksite or as directed by the MECON / BSL.(Net laid area to be measured) |
| 48 | PRIMARY COOLING TOWER NO. 1 (3 CELLS)Details of Cooling Tower - 3 cells, capacity of each cell – 1350 m3/hr, Mechanical induced draft Cross flow type (RCC), Cooling tower overall dimensions: – 22.8 m x 25.24 m, Individual cell dimension: 9 m x 18.5 m (bottom) & 9 m x 22.8 m (top), Cooling tower height: 10.5 m approx. (from FGL), Cooling tower basin : below ground. Including civil and structural if required.(Refer clause 02.05 of TS No. MEC/S/E254/A/10/C1/0752 for detailed scope before quoting) |
| 49 | a) Dismantling of complete fan assembly (fan dia 7315 mm approx., MOC : FRP/GRP/Aluminum alloy) with drive shaft, Flexible coupling & Gear box for each cell at Fan deck level (10.5 m from FGL ).b) Dismantling of complete motor set for cooling tower (motor rating : 55 KW each(Approx.) at fan deck level for each cell ( 10.5 m from FGL).c) Dismantling ofPVCfill comprising of PVC V bars, fill supported grids, miscellaneous fill support component,nozzles, PVC drift eliminator, SS -Nut, bolts & washers etc. for each cell {From GFL to 10 m level).d) Dismantling of centre beam (structural support) for supporting drive shaft connecting fan gear box and Motor at fan deck level (10.5 m from FGL).e) Dismantling of water distribution system including piping, manual flow control valves for each cell at fan deck level (10.5 m from FGL). |
| 50 | Common areaa) Dismantling of Riser pipe (DN 500) & distribution header at fan deck level (DN 700 & DN 500).b) Dismantling of 2 nos. of DN 500 Gate valve along with operating platform. c) Dismantling of hand railings at fan deck level and along cooling tower stairs. |
| 51 | ERECTION OF PLANT & EQUIPMENT (P&E) AND STRUCTURES TECHNOLOGICALSTRUCTURES (Refer clause 02.0, 03.0 &04.0 of TS No. MEC/S/E254/A/10/C1/0752 for detailed scope before quote) |
| 52 | Anchorage of Battery - Buckstays & its accessories including Spring Loading arrangement, Small & Auxiliary Anchorage, Measuring Device, Beam for reinforcement, Holding Down Device, etc |
| 53 | Longitudinal Tie Rods with welding / cutting |
| 54 | Transverse Tie Rods (Top & Bottom) assembly with its Accessories |
| 55 | SS Pipe Sleeve (1 no is supplied in three pieces) for Transverse Tie Rod including welding / cutting |
| 56 | Springs for Anchorage |
| 57 | Brackets for Expansion Measurements |
| 58 | Side tunnel bogie including bogie track – P/s & C/s |
| 59 | AP (Stand Pipe) - P/S |
| 60 | AP (Stand Pipe) - C/S |
| 61 | T-Pipe |
| 62 | Heat shield |
| 63 | Fixed Door Racks |
| 64 | Fixed Door Racks with Door Frame Fixing Arrangement |
| 65 | Number Plates |
| 66 | HEAT RESISTANCE CASTINGS / ORDINARY CASTINGS |
| 67 | Flash plate (P/S & C/S) with fixing of Temporary Tie Rod & Erection set of Flash Plate during erection of flash plates |
| 68 | Charging Holes Frames & Lids with Dummy Frames & Lids |
| 69 | Inspection Hole Frames & Lids |
| 70 | Base Casting for AP |
| 71 | Goose Neck Assembly (Bend Pipe Assembly) |
| 72 | Isolation Valve Assembly |
| 73 | Supply, Melting of Coal Tar pitch and pouring in spigot joint (between Bend & Isolation Valve Box - 138 nos.) before commissioning of Battery for required sealing |
| 74 | Waste Heat Box Assembly Type 4 |
| 75 | Waste Heat Box Assembly Type 1 |
| 76 | Right Hand Reducing Branch Pipe with Plugs |
| 77 | Left Hand Reducing Branch Pipe with Plugs |
| 78 | Automatic Gates in Flue (2 nos. gates) |
| 79 | Hand Operated Gate in Common Flue |
| 80 | CI Paving of Service Bench & between buckstays at P/S & C/S |
| 81 | Grated Grill for Pusher Car Track Drain |
| 82 | Spray nozzles for |
| 83 | A) Tar Chasing |
| 84 | B) HPALA |
| 85 | C)G C Main & Cross Over Main |
| 86 | D) Goose Neck |
| 87 | E)GCM End Connection |
| 88 | Door Assembly - P/S |
| 89 | Door Assembly - C/S |
| 90 | Door Frame Assembly (P/S & C/S) with erection set |
| 91 | Water Sealed AP lid Assembly (P/S & C/S) |
| 92 | Reversing Mechanism & Reversing Winch (Including fabricated parts, Chains & Sprockets etc.) |
| 93 | Hydraulic Cylinders & Jacks: Telescopic cylinder / Differential cylinder / Hydraulic jack / Pumping units etc. |
| 94 | Hydraulic Power Pack (Medium Pressure hydraulic system for reversing mechanism) |
| 95 | Handling, erection, installation, alignment, minor civil & grouting, initial fills & consumables for trial run, testing & trial run of Pumps with motors & other associated electrics, inter connecting piping (inlet, outlet etc.), fittings, supports, packing, shims, etc. as per TS, approved drawings & instruction of Engineer-In-Charge.(Refer clause 02.0, 03.0 & 04.0 of TS no. MEC/S/E254/A/10/C1/0752 for detailed scope before quoting) |
| 96 | Self-priming Dewatering Pump (10 m3/h, 10m head) with electric & its accessories for sump pit for Gas condensate |
| 97 | Self-priming Sump pump (8 m3/h, 5 head) with electrics & its accessories for industrial water for 4-point seal pot |
| 98 | Booster (drinking water) Pump (5 m3/h, 45 head) with electrics in Coal Tower no. 3 |
| 99 | Sump Pump (10 m3/h, 10m head) with electrics & its Accessories for Chimney Pit |
| 100 | Service water pump-21 (2950 m3/hr capacity, 39 m head) - Erection of 1 no. service water pump-21 along with motor, electrics and associated accessories etc. at same existing position in service water pump house. |
| 101 | Handling, Fabrication, Welding (MS to MS, MS to SS & SS to SS) for connection, Puncturing upto DN1300 pipes, Bending (upto DN 200), Erection & Underground routing of pipelines,(Standard length / Fabricated / IS:1239 Part-I / IS 3589/ASTM A 106 Gr-B / SS Quality/ Galvanised, etc.) along with associated pipe fittings including erection of pedestal / saddle support / U-Clamps and other structural supports, structural platforms etc. as per approved drawings / instruction of Engineer-In-Charge, testing with associated fittings & valves and obtaining IBR approval as required.(Refer clause 02.0, 03.0 & 04.0 of TS No. MEC/S/E254/A/10/C1/0752 for detailed scope before quoting) |
| 102 | Rich Gas Pre-heater with safety relief valve & steam traps as per drawing / instruction of Engineer-In-Charge. |
| 103 | Centralized grease lubrication system with electrics - Pipes & Fittings for lubrication system, support and other accessories. |
| 104 | Accessories for under firing with CO gas with Gland outlet cock with straight outlet (NB 6mm - 560 nos.) |
| 105 | Seamless SS Riser Pipe of OD 38.0±0.15 mm x 2.0 mm thk., Length – 1450 mm |
| 106 | Banana brick adjustment pipe cover with fittings |
| 107 | High Pressure water jet door cleaner system (P/s & C/s) along with electrics including equipment, pump, electrics & associated accessories in common pump house |
| 108 | HPALA Pumps with motors along with electricsin HPALA Pump House |
| 109 | Booster Pumps with motors along with electrics for sealing of HPALA Pumpin HPALA Pump House |
| 110 | Door lowering rack (P/s & C/s) with winch, motors, electrics & other associated items |
| 111 | Accessories for heating with Mixed gas |
| 112 | Gas collecting Main (DN1400) including bleeder, hydro-seal, T-pipes etc. – P/s & C/s |
| 113 | Cross over gas main (DN1100) with gland compensator |
| 114 | Suction main (DN1200) with gland compensator & vents etc. |
| 115 | CO Gas Mains with mounted accessories |
| 116 | Mixed Gas Mains with Gland Compensator |
| 117 | Temporary Stoves for Pre-Heating with 4 nos. end supports |
| 118 | Temporary Heating up Pipelines with fittings, valves, control valves, supports including Compressed air line for control valves etc. |
| 119 | Condensate Seal Pot for 4 Points |
| 120 | Condensate Seal Pot for 9 Points |
| 121 | PLACEMENT OF EQUIPMENT AS PER INSTRUCTION BY ENGINEER-IN-CHARGE |
| 122 | Dry Gunniting Machine with all accessories including portable compressor and special tools and tackles |
| 123 | Bench Vice with bench |
| 124 | Carriage for servicing for heating in cellar |
| 125 | Pedestal type Roughing & Grinding machine with electrics in IBB No.11 |
| 126 | Drilling machine of dia. 25 mm in IBB No. 11 |
| 127 | Multi-point Welding machine in IBB No. 11 |
| 128 | Bob Cat (1.5m3 grab bucket capacity). |
| 129 | Hydra (16t) |
| 130 | MACHINE TRACKS & FITTINGS (including Thermit welding of track as required)(Refer clause 02.0, 03.0 & 04.0 of TS No. MEC/S/E254/A/10/C1/0752 for detailed scope before quoting) |
| 131 | Pusher Car Track with fittings (CR-100 Rail) |
| 132 | Quenching Car Track with fittings (Rail 52 kg/m) |
| 133 | Thermit welding of tracks (52 kg rail) |
| 134 | Thermit welding of tracks (CR 100 rail) |
| 135 | Wooden sleepers for Quenching Car track |
| 136 | Ballast Stone |
| 137 | Charging Car Track with fittings (Rail 52 kg/m) |
| 138 | Guide Car Track with fittings (Rail 52 kg/m) |
| 139 | PIPES & FITTINGSHandling, fabrication (cutting, welding, fitting etc.), fixing, welding (MS to MS, MS to SS & SS to SS), puncturing, bending, alignment, erection, laying of Pipeline (Fabricated / standard length / IS:1239 Part-I (CS & Galvanized) / IS 3589 / ASTM A 106 Gr-B / SS Quality / IBR Quality etc.) at all level, testing with associated fittings, Gland Compensator / Expansion Bellows, Flanges / companion flanges with fasteners / gaskets / ropes / hose / rainhood / pedestals / U-clamp / saddle supports / structural supports / Gaskets cutting / hanger supports / tapping for Instruments upto root valves and fabrication (wherever required) of tees, elbows, bracings, reducers, supports and other pipeline fittings for Pipes (Service Water / industrial water -incl. Line & fittings in Pusher Side Stockade at interval of 10m for cleaning at the stockade area, Compressed Air, RAL, Pipes & fittings in communication tunnel, Gas Condensate, Gas bleeder, vent, Seal Pot Sump Pump Line, Steam line and its condensate, rain water, drinking water, make-up water, compressed air line for chimney etc.) in Battery Proper and By-product area as per technical specification drawings / as per instruction of Engineer-in – Charge. Obtaining IBR approval of steam pipeline including fittings as required.(Refer clause 02.0, 03.0 & 04.0 of TS No. MEC/S/E254/A/10/C1/0752 for detailed scope before quoting) |
| 140 | STANDARD GALVANIZED, SCREWED END |
| 141 | DN 15 |
| 142 | DN 25 |
| 143 | DN 40 |
| 144 | DN 50 |
| 145 | STANDARD SEAMLESS PIPES |
| 146 | DN 15 |
| 147 | DN 20 |
| 148 | DN 25 |
| 149 | DN 40 |
| 150 | DN 50 |
| 151 | DN 80 |
| 152 | DN 100 |
| 153 | DN 150 |
| 154 | DN 200 |
| 155 | DN 300 |
| 156 | STANDARD ERW PIPES |
| 157 | DN 15 |
| 158 | DN 25 |
| 159 | DN 32 |
| 160 | DN 40 |
| 161 | DN 50 |
| 162 | DN 65 |
| 163 | DN 80 |
| 164 | DN100 |
| 165 | DN150 |
| 166 | DN200 |
| 167 | STANDARD PIPES (IBR) |
| 168 | DN100 |
| 169 | DN65 |
| 170 | DN50 |
| 171 | DN40 |
| 172 | DN32 |
| 173 | DN25 |
| 174 | DN20 |
| 175 | DN15 |
| 176 | Standard pipes of following area mentioned below are covered package SM-605. |
| 177 | Fabricated pipes & Fittings of Flushing Liquor Line (Battery) |
| 178 | Fabricated pipes & Fittings of HPALA line for battery proper including piping for HPALA pump house with Y-strainer DN 150 |
| 179 | Fabricated pipes & Fittings of Return Ammonia Liquor Line (Battery Proper) |
| 180 | Fabricated pipes & Fittings of Pipe Line for water sealed A P lid |
| 181 | Erection of pipe line in By-Product area. Including civil and structural dismantling if required.(Refer clause 02.0, 03.0 & 04.0 of TS No. MEC/S/E254/A/10/C1/0752for detailed scope before quoting) |
| 182 | Erection of MS Pipeline in byproduct area consisting of Pipe DN700 (approx.~ 580 m), Pipe DN500 (approx.~ 100 m) & Pipe DN50 from PGC to DETP (approx.~ 100 m) including valves, fabrication and erection of pipe & fittings, fabrication and erection of supports, fabrication and erection of maintenance platforms etc. to suit the site condition. |
| 183 | VALVES |
| 184 | Valves - Handling, Re-visioning before erection, fixing of valves pipeline, erection, alignment & testing of Valves (CI & Cast Steel Gate, Globe & Check Valve, Plug, Ball, Butterfly, Control, fabricated and including IBR category valves etc.), welding of companion flanges, along with associated electrics as per approved drawings / instruction of Engineer-In-Charge.(Refer clause 02.0, 03.0 & 04.0 C262 for detailed scope before quoting) |
| 185 | Isolation Cocks DN65 for CO gas |
| 186 | Isolation Cocks DN150 for Mixed gas |
| 187 | Reversing Cocks DN70 for CO gas with levers |
| 188 | Reversing Cocks DN150 for Mixed gas with levers |
| 189 | CI GATE VALVES |
| 190 | DN 25 |
| 191 | DN 50 |
| 192 | DN 80 |
| 193 | DN 100 |
| 194 | DN 200 |
| 195 | DN 500 |
| 196 | DN 800 |
| 197 | CI NON-RETURN VALVES |
| 198 | DN 25 |
| 199 | DN 100 |
| 200 | CAST STEEL GATE VALVES |
| 201 | DN 40 |
| 202 | DN 50 |
| 203 | DN 80 |
| 204 | DN 100 |
| 205 | DN 150 |
| 206 | DN 200 |
| 207 | DN 250 |
| 208 | DN 300 |
| 209 | DN 400 |
| 210 | CAST STEEL / FORGED STEEL GLOBE VALVES |
| 211 | DN 15 |
| 212 | DN 25 |
| 213 | DN 32 |
| 214 | DN 40 |
| 215 | DN 50 |
| 216 | DN 80 |
| 217 | DN 100 |
| 218 | CAST STEEL NON-RETURN VALVES |
| 219 | DN 40 |
| 220 | DN 100 |
| 221 | CAST STEEL GATE VALVES FOR STEAM SERVICES |
| 222 | DN 15 |
| 223 | DN 20 |
| 224 | DN 25 |
| 225 | DN 32 |
| 226 | DN 50 |
| 227 | CAST / FORGED STEEL GLOBE VALVES FOR STEAM SERVICES |
| 228 | DN 15 |
| 229 | DN 20 |
| 230 | DN 25 |
| 231 | DN 40 |
| 232 | DN 50 |
| 233 | DN 65 |
| 234 | DN 100 |
| 235 | DN15 |
| 236 | DN 25 |
| 237 | DN 40 |
| 238 | DN 65 |
| 239 | FOR HPALA SERVICE |
| 240 | DN 25 |
| 241 | DN 40 |
| 242 | FOR INSTRUMENTATION / BPP |
| 243 | DN 15 |
| 244 | DN 20 |
| 245 | DN 25 |
| 246 | DN 40 |
| 247 | DN 50 |
| 248 | DN 80 |
| 249 | DN 1100 |
| 250 | DN 1200 |
| 251 | DN 200 |
| 252 | DN 600 |
| 253 | DN 900 |
| 254 | DN 1200 |
| 255 | Thermal insulation- For Pre-heater, steam pipeline along with Valves, steam traps and fittings etc. covered in this TS.(Refer clause 03.0 & 04.0 for detailed scope before quoting) |
| 256 | Refurbishing including handling, transportation from storage to site,(Overhauling, servicing and retrofitting) of existing Single Girder Under slung Crane for TOPR (of Battery No.8) - 5T x 15m span |
| 257 | Erection of above two nos. 5T x 15m span under-slung cranes in temporary protection shed & their maintenance during entire erection period of battery |
| 258 | ERECTION OF ELECTRICS FOR TOPR & CONSTRUCTION POWER SUPPLY(Refer clause 03.0 & 05.0 of TS No. MEC/S/E254/A/10/C1/0752 for detailed scope before quoting) |
| 259 | Free standing, floor mounted, modular type Construction power supply board.(I/c - 400Ax1: OG - 63Ax3, 250Ax1, 100Ax3) |
| 260 | Sheet steel clad, wall mounted Sub-Lighting distribution board (SLDB) |
| 261 | Industrial Well glass fittings, integral type suitable for 40 W LED Light fitting complete with control gear etc. (efficacy >1.10) |
| 262 | Industrial Flood Light fittings, integral type suitable for 200 W LED Light fitting complete with control gear etc. (efficacy >1.10). |
| 263 | 24 V, 250V Lighting Transformer 415 /24V, in sheet steel enclosure with 15/5A combination switch/socket for TOPR |
| 264 | 3-Way Junction Box, in 2 mm in sheet steel enclosure (Size: 200 x 200 x 100 mm) with elemex connectors. |
| 265 | XLPE insulated power cable of size 3.5x185 sq. mm on existing structure or buried underground from BSL’s existing Substation up to the the construction board |
| 266 | XLPE insulated 1.1kV, 4C x 16 sq. mm grade Al. Armoured Power cable for lighting conforming to TS |
| 267 | XLPE insulated 1.1kV, 3C x 2.5 sq. mm grade Cu. Armoured Power cable for lighting conforming to TS |
| 268 | XLPE insulated 1.1kV, 2C x 2.5 sq. mm grade Cu. Armoured Power cable for lighting conforming to TS |
| 269 | Cable glands, termination sleeves / ferules, lugs, marker, tape, etc. for termination of 3.5C x 185 sq. mm grade Al. Armoured Power cable. |
| 270 | Cable glands, termination sleeves / ferules, lugs, marker, tape, etc. for termination of 4C x 16 sq. mm grade Al. Armoured Power cable for lighting. |
| 271 | Cable glands, termination sleeves / ferules, lugs, marker, tape, etc. for termination (Both ends) of 3C x 2.5 sq. mm grade Cu. Armoured Power cable for lighting. |
| 272 | Cable glands, termination sleeves / ferules, lugs,marker, tape, etc. for termination of 2C x 2.5 sq. mm grade Cu. Armoured Power cable for lighting. |
| 273 | Earthing material including GI strips, flats, cable tray, conduits, pipes etc. |
| 274 | Consumables including cable glands, lugs, ferrules, tapes, termination kit etc. |
| 275 | PRIMARY COOLING TOWER NO. 1 Details of Cooling Tower - 3 cells, capacity of each cell – 1350 m3/hr, Mechanical induced draft Cross flow type (RCC), Cooling tower overall dimensions: – 22.8 m x 25.24 m, Individual cell dimension: 9 m x 18.5 m (bottom) & 9 m x 22.8 m (top), Cooling tower height: 10.5 m approx. (from FGL), Cooling tower basin : below ground. Including civil and structural if required.Notes:-1) All pipe fittings shall be fabricated from parent pipe.2) All hardware like shim, U blot etc. as required for erection shall be supplied by erection contractor.3) Initial fills & consumables for trial run, testing of fan gear box & motor shall be in the scope of erection contractor.4) Special tools & tackles required for erection shall be in the scope of erection contractors.(Refer clause 02.05 & 03.00 of TS No. MEC/S/E254/A/10/C1/0752 for detailed scope before quoting) |
| 276 | a)Erection of complete fan assembly (fan dia 7315 mm approx., MOC : FRP/GRP/Aluminum alloy) with drive shaft, Flexible coupling & Gear box for each cell at Fan deck level (10.5 m from FGL ).b) Complete Erection of oil piping external to gear box (GI pipe), Connection between gear box and piping trough wire braided flexible hose assemblies for each cell (at fan deck level).c) Erection of complete motor set (motor rating : 55 KW each(Approx.) for each cell of cooling tower at fan deck level ( 10.5 m from FGL).d) Erection of new PVC splash type fill comprising of PVC V bars, SS 304L fill supported grids, miscellaneous fill support component, SS nozzles, PVC drift eliminator, SS -Nut, bolts & washers etc. for each cell { From GFL to 10 m level).e) Erection of complete water distribution system including piping, manual flow control valves and distribution nozzles for each cell at fan deck level (10.5 m from FGL).f) Erection of centre beam (structural support) for supporting drive shaft connecting fan gear box and Motor for each cell at fan deck level (10.5 m from FGL).g) Erection of material required for Refurbishment of Sluice gate for each cell.h) Installation of vibration and oil level switches along with all necessary mounting pads and other accessory required for a complete installation. |
| 277 | Common facilitiesa) Erection of Cooling tower Riser pipe & distribution header DN 700 followed by DN 500with MS flange at end, at fan deck level on existing supports (Approx. 7.5 tonne).b) Erection of 2 nos. of DN 500 Gate (electrical actuated) valve along with electrics and accessories with operating platform at fan deck level in the distribution header.c) Erection of air release valve at fan deck level in each of the distribution header.d) Installation of End wall derrick arrangement at fan deck level at one end of cooling tower.e) Erection of hand railings at fan deck level and along cooling tower stairs (Approx. 1.5 tonne) |
| 278 | ERECTION OF FIRE FIGHTING SYSYTEM(Refer clause 02.04 & 06.0 of TS No. MEC/S/E254/A/10/C1/0752 for detailed scope before quoting)Fire Hydrant System |
| 279 | Route survey, cutting & backfilling of earth, base preparation inside trench for laying of underground pipes of maximum dia. 200 mm |
| 280 | Application of bituminous paint, wrapping tape on pipe surface |
| 281 | Erection of overhead /Laying of underground pipes & fittings performing the necessary activities like surface cleaning, root preparation, welding, loop making, NDT testing, supports fixing, etc. |
| 282 | Installation of hydrant valve with complete set |
| 283 | Air release valve |
| 284 | Installation of Gate Valves (100 NB & 150 NB) |
| 285 | ERECTION OF FIRE FIGHTING SYSYTEM(Refer clause 02.04 & 06.0 of TS No. MEC/S/E254/A/10/C1/0752 for detailed scope before quoting)Portable Fire extinguishers |
| 286 | Installation of portable fire extinguishers (CO2 type, DCP type, foam type, etc.) |
| 287 | Sand buckets with stand |
| 288 | ERECTION OF FIRE FIGHTING SYSYTEM(Refer clause 02.04 & 06.0 of TS No. MEC/S/E254/A/10/C1/0752 for detailed scope before quoting)Passive Fire Protection System |
| 289 | Application of fire-retardant paint on cables |
| 290 | Application of fire barrier (fire sealant) at the opening of walls, floors for entry/exit of cables |
| 291 | STEEL STRUCTURAL WORKSa. Quantities indicated in the schedule of items are approximate. Final quantity of actual execution shall be calculated based on drawing weight and may vary ( +/-15%) . b. Steel may be procured from any integrated steel producers /SAIL.c. Drawings shall be issued to the successful tenderer progressively to match the overall schedule of the Project.d. Inspection, testing including radiographic & ultrasonic testing and commissioning of all steel structures if any shall be the part of the scope of work of the bidder.Refer clause 1.2, Chapter-4, Chapter-5 & Chapter 6 of TS No. MEC/S/E254/A/10/12/0814 for detailed scope of work before quote |
| 292 | Erectionof22G thick CGS ( Corrugated Galvanized sheets ,)sheeting for TOPR,Protective shed, including sheeting for other miscellaneous areas along with ridge pieces (1.0 mm thick plain galvanized sheet) together with supply of all required fasteners, screws, bolts, including cutting, bending of sheets to required shapes and sizes and erecting them at different heights in position with all labor and erection tools and tackles complete as per technical specification and drawings. (Net laid area to be measured). |
| 293 | Erection at different heights of Plain GI sheets 1.0 mm thick Plain GI sheeting for “Lift structures” side cladding as per technical specification together with supply of all required fasteners, screws, bolts, including cutting, bending of sheets to required shapes and sizes and erecting them in position with all labor and erection tools and tackles complete as per technical specification and drawings. (Net laid area to be measured). |
| 294 | Erection at different heights of Plain GI sheets 1.6 mm thick Plain GI sheeting for “Lift structures” side cladding as per technical specification together with supply of all required fasteners, screws, bolts, including cutting, bending of sheets to required shapes and sizes and erecting them in position with all labor and erection tools and tackles complete as per technical specification and drawings. (Net laid area to be measured). Only sheets of standard length and width will be supplied. |
| 295 | Erection of all Mild steel fabricated structures for COB#6 rebuilding work covered under scope of works, including TOPR, complete with alignment, final welding , as per technical specification along with supply of all consumables, erection & permanent nuts & bolts, pack plates, shims, paints, jigs & fixtures as per technical specification and drawings. Erection of some items at higher height also to be considered. |
| 296 | Erection of all Stainless-steel structures for COB#6 rebuilding work covered under scope of works, complete with alignment, final welding along with supply of all consumables, nuts & bolts, pack plates, shims,jigs & fixtures as per technical specification and drawings. |
| 297 | Refurbishing & strengthening of existing support / columns, beams & other Structural members of existing Intermediate Bench # 11 / Service water pump house including anyincidental fabrication and erection,as per scope of work or site requirements of structural materials as per drawings .Contractor will arrange joint inspection along with MECON & BSL Engineers for assessment which require refurbishing / strengthening. This activity will be carried out before taking up the site work. |
| 298 | Construction & development of storage shed (open & closed covered) including supply of materials for the above construction, development & maintenance of shed & yard.(Refer clause 03.0 of TS No. MEC/S/E254/A/10/C1/0752 for detailed scope before quoting) |
| 299 | Storage, maintenance of the storage facilities, handling charges including receipt of incoming all materials (free issue) to be supplied by tenderer, others suppliers, Receiving the materials from stores operated & controlled by MECON or other party on behalf of MECON, taking delivery directly from transporters, unloading, stacking, loading for transportation at site, transportation to site (to & fro), unloading at site, multiple handling, watch & ward, etc. Storage activity to be start after intimation by MECON. Any item missing or damaged after receipt is to be supplied / replaced by bidder without any extra cost(Refer clause 03.0 of TS No. MEC/S/E254/A/10/C1/0752 for detailed scope before quoting)Following material shall be kept in closed storage shed:a) Compressor & drier with accessories.b) All types Pumps.c) All types Valves.d) Cranes and Hoist.e) Standard Pipes & Pipe fittings.f) Ceramic Rope, Packing Materials etc.g) Fasteners & Gaskets.h) Insulation materials.i) Hydro-Jet door cleaner with accessoriesj) Paints.k) Consumable items.l) Electrical & Instrumentation item with equipment.m) Any other items suggested by site office. |
| 300 | APPLICATION OF PRIMERS AND PAINTS (Refer clause 04.05 of TS No. MEC/S/E254/A/10/C1/0752 for detailed scope before quoting) |
| 301 | Application of Primers & Paints on Plant & Equipment, Pipe lines, valves, compensators, all type supports, fittings etc. and all Steel structures covered under package (SE-752A & SE-814) as per Appendix-A or as per the recommendation of BSL.Quantity of paints shall be estimated progressively during application by the successful tenderer. |
| 302 | CHIMNEY LIGHT-UP (For 15 days)Manpower certification shall be done by Heat-Up Incharge. |
| 303 | Supervisor (Highly skilled worker) |
| 304 | Fitter (Skilled worker) |
| 305 | Helper / Khalasi (Un-skilled worker) |
| 306 | HEATING-UP & COMMISSIONING FOR BATTERY (FOR 90 DAYS)Manpower certification shall be done by Heat-Up Incharge. |
| 307 | Supervisor (Highly skilled worker) |
| 308 | Fitter (Skilled worker) |
| 309 | Helper / Khalasi (Un skilled worker) |
| 310 | Rigger (Semi skilled worker) |
| 311 | Electrician (Highly skilled worker) |
| 312 | Heater(Highly skilled worker) |
| 313 | DEFECT LIABILITY PERIOD FOR 1 (ONE) YEAR |
| 314 | PERFORMANCE GUARANTEE TEST FOR 10 DAYS |
| 315 | GENERAL NOTES |
| 316 | Unit rate mentioned by the tenderer shall be firm till completion of scope of work. |
| 317 | Quantities indicated as above are based on estimated quantity. Final quantities of actual execution shall be calculated based on drawings /actual measurement at site (in case drawings are not available) as certified by Engineer-in-charge. |
| 318 | Drawings shall be issued to the successful tenderer progressively to match the overall schedule of the Project. |
| 319 | Tenderer shall read all the clauses of TS before quoting. After quoting the price, it will be understood that the tenderer has read out all the clauses of this TS and understood the scope of work in detail. |
| 320 | The total quoted price for erection of Plant & equipment as above shall include erection of mounted electrics also. |
| 321 | Application / fixing of packing is also in the scope of tenderer. Tenderer to note that erection rate quoted for Plant & Equipment as above shall be inclusive of application / fixing / erection of packing materials, fasteners etc. Cutting of gaskets of various sizes from sheets of gaskets shall also be included in the quoted price of erection. |
| 322 | Quoted rates for dismantling shall be inclusive of cleaning, segregation, loading and transportation back to BSL’s stores or debris to disposal yard & unloading within a lead of 8 km within the plant boundary as directed by Engineer-in-charge. |
| 323 | The total price quoted for erection shall cover Dye penetrate test, Ultrasonic & Radiography (X-ray & Gamma ray) as per technical specification / drawing. |
| 324 | Providing all consumable materials such as but not limited to electrodes of approved quality as specified in drawing and erection instructions or instructed by site engineer, oxygen, acetylene gas cylinders, petroleum, cleaning rags, timber, erection bolts, rivets, slings, wedges, piano wires, packing plates, patching compounds, chemicals for pickling and degreasing, solvents, flushing oil, shrink comp grouting compounds, clamps, grinding paste, sealing compound etc. free of cost. |
| 325 | Providing some necessary consumables like cotton, diesel, kerosene oil, grease & lubricants etc. free of cost as per requirement of the project. Although such items are not appearing in price schedule. |
| 326 | Price quoted shall be inclusive of scope of work, terms & condition as detailed in technical specification no. MEC/S/E254/A/10/C1/0752 & MEC/S/E254/A/10/12/0814. Tenderer shall note & confirm that rate quoted shall include all the clauses mentioned in these TS. |
| 327 | Dismantling and erection rate to be quoted, shall be applicable at all level / height of work viz; whether the work is to be done at ground level, below ground or above ground at highest point of equipment, piping, structures etc. |
| 328 | Rate of dismantling to be quoted will be inclusive of associated civil and structure also, cleaning, segregation and transportation to space indicated by MECON/BSL. |
| 329 | Erection of pipeline shall consist of pipes, fittings, valves, packing, supports, maintenance platforms etc. at all level height of work viz; whether the work is to be done at ground level, below ground or above ground at highest point of equipment / structures etc |
| 330 | Tenderer to note that the items under scope of supply shall be procured from the CET-List of Acceptable Makes (Appendix-B – enclosed with TS). If the item is not listed in Appendix-B, tenderer shall follow the General Technical Specification for Preferred Makes (Appendix-C – enclosed with TS) for the supply. |
| 331 | For the items which are not listed in Appendix-B or C, tenderer is free to supply from reputed manufacturer, however, approval for the same has to be taken in advance. |
| 332 | All certification of quantum of works carried out by tenderer for the purpose of payment will be done on the basis of joint certification. |
| 333 | Tenderer to note that the price schedule for storage (refer clause no. 07.10) will be for storage of Mechanical & Electrical items and all accessories of this TS as well as storage of structures of TS No. MEC/S/E254/A/10/12/0814. |
| 334 | Notes for TOPR Lighting: |
| 335 | Quantities of various items listed above are estimated quantity only. The same shall be supplied as per approved makes, erected, tested & commissioned as per actual site conditions & requirements. |
| 336 | Repair & Replacement of defective items including lamps, fuses etc. shall be done as & when required without any additional cost. |
| 337 | All the items mentioned above are to be returned to the purchaser after use & re conciliation in proper working condition. |
| 338 | All the material for TOPR lighting shall be supplied new & as per the approved vendor list of purchaser. |