|
| 1 | Load/Unload & stacking,Metering Set |
| 2 | Load/Unload Transformers Below 250 KVA |
| 3 | Load/Unload Transformers 250 KVA |
| 4 | Loading/Unloading Transformers 500 KVA |
| 5 | Loading/Unloading of 8 m PSC Pole |
| 6 | Load/Unload all of 9 m PSC,RCC Sq.Pole |
| 7 | Loading/Unloading all sizes of RS Joist |
| 8 | Load/Unload of all types Pannel boards |
| 9 | Load/Unload 11KV Breaker, 33KV Breaker |
| 10 | Uncoiling the conductor drum, bundling, transporting to weighing scale, weighing, transporting to yard and stacking for 7/2.50 AAAC |
| 11 | Uncoiling the conductor drum, bundling, transporting to weighing scale, weighing, transporting to yard and stacking for other then 7/2.50 AAAC |
| 12 | Loading / unloading of iron & steel materials |
| 13 | Lifting, Leading to Weighing Scale, Weighing & Stacking of Iron & Steel Materials |
| 14 | Loading/Unloading ofBattery Charger |
| 15 | Loading / unloading and stacking of all other line materials such as structure materials, x-arm, stay sets, G.I. wire, stay wire, earth pipes, bolt & nut, G.I. pins etc |
| 16 | Loading / unloading of Single Phase meter |
| 17 | Loading / unloading of Three Phase meter |
| 18 | Loading / unloading of LTCT, HT/LT LAS and Open Type Fuse unit with individual packing |
| 19 | Unpacking, verifying, counting, repacking & stacking of meter, HT/LT LAS,chock and Open Type Fuse unit with individual packing |
| 20 | Loading / unloading of LT pin insulators, guy shackle and LT shackle |
| 21 | Loading / unloading & counting of 33KV/11 KV disc, 11 KV / 33 KV pin insulator, verifying and stacking |
| 22 | Loading / unloading of all size of indoor & outdoor CT / PTand stacking |
| 23 | Loading / unloading & stacking of paints-1 to 4 litres capacity (4/ 5 Ltr) |
| 24 | Loading / unloading of 11 KV / 33 KV H.G. fuse set without insulator |
| 25 | Unpacking, verification of LT pin insulator, shackle, guy insulator, LT pin, LT metal parts, 33/22/11 KV pin, 11 KV metal parts, Aluminium knob, fuse unit 16 A / 32 A and PVC pipes, repacking and stacking |
| 26 | Loading / unloading of all size of tyres and stacking |
| 27 | Lifting, transporting to weighing scale, weighing, re-leading to stacking pointand stacking of all scrap materials including Copper, Aluminium, etc. |
| 28 | Loading / Unloading of all kinds of scraps from lorry, weighing and stacking |
| 29 | Unpacking, verifying, repacking, stacking of bolt & nut |
| 30 | Uncoiling, measuring, recoiling and stacking of PVC cables below 50 sq. mm |
| 31 | Uncoiling, measuring, recoiling and stacking of PVC cables above 50 Sq.mm |
| 32 | Loading, unloading & stacking of PVC cables below 50 sq. mm |
| 33 | Loading, unloading & stacking of PVC cables above 50 Sq.mm |
| 34 | Loading / unloading & stacking of 11 KV / 33 KV AB switch (DP) |
| 35 | Loading of stationary items to lorry / unloading from lorry, stacking at stationery stores |
| 36 | Unpacking, verifying, counting, repacking, stacking of stationary items at Stores upto 50 kg |
| 37 | Loading / unloading ofempty drums-Wooden drums |
| 38 | Loading / unloading ofempty drums - Steel drums |
| 39 | Loading / unloading of shunt / power capacitor |
| 40 | Unpacking of gunny bags, verifying & stacking of SEC Wires, DPC Alu. Wires and TC Fuse wire |
| 41 | Unpacking, counting, verifying and stacking of numbered poly carbonate seals |
| 42 | Loading / unloading & stacking of cables in cable drums- Wooden drums |
| 43 | Loading / unloading & stacking of cables in cable drums- Steel drums |
| 44 | Loading / unloading of pillar boxes- 6 Way pillar box |
| 45 | Loading / unloading of pillar boxes- 4 Way pillar box |
| 46 | Loading / unloading of pillar boxes- Mini pillar box |
| 47 | Loading / unloading of pillar boxes- FRB pillar box |
| 48 | Loading / Unloading and stacking of V-Trough |
| 49 | Loading / unloading & stacking of straight joint kit /termination kit |
| 50 | Loading/Unloading & Stacking of HT UG Cable |
| 51 | Loading/Unloading & Stacking of LT UG Cable |
| 52 | Loading/Unloading & Stacking of LT UG Service Cable |
| 53 | Leading, Weighing and Stacking of Transformer Oil Drums |
| 54 | Loading/Unloading ofSingle Pole AB Switch Vertical Type Complete |
| 55 | Loading/Unloading of11KV / 33KV Center rotating AB Switch Vertical Type Complete |
| 56 | Loading/Unloading, Stacking GI Earth Pipe |
| 57 | Loading/Unloading , Stacking Battery, Computer, Printer, UPS |
| 58 | Loading/Unloading, Stacking SMC Box & Pilfer Proof Box |
| 59 | Loading/Unloading, Stacking of Earth Rod |
| 60 | Not covered the above Materials( iron and steel) |
| 61 | Not covered Items plastics and others |