|
| 1 | CCF BHARATPUR 2.2 FENCING 2.2.2 Digging of Ditch fencing by mechanical means of desired shape and size including dressing and laying of excavated soil in contunuous mound and dressing of mound 2.2.2.2 Hard Soil between 30 to 50 % boulders size 1.50+0.90/2x 1.20 ( 2000 rmt x 1.44 )= 2880 cum |
| 2 | CCF BHARATPUR2.2.2 Digging of Trench by mechanical means of desired shape and size including dressing and laying of excavated soil in contunuous mound and dressing of mound 2.2.2.2 Hard Soil between 30 to 50 % bouldersTrench SIZE9500 rmt x 0.45x0.45 = 1923.75 cum |
| 3 | BANASH BSR 6.2.1.2Earth work for bund/embankment in dry or moist soil with the help of tractor attached with scraper including laying in layers of 15 cm breaking of clods, sorting of grasses, pebbles etc. And dressing in required profile when compacted manually within initial lead of 30 m and lift of 1.50 m rate of tractor (35-40 Hp) with POLandscraper (Excluding charges of wateringandcompaction ) In hard soil ( 2 nag ) |
| 4 | 3.7 Construction of check dams by loose stone including digging and breaking of stones (rates are for volume including voids) 3.7.2 Lead above 200 m Per cubic meter 383.27 |
| 5 | 4.2Digging of new pits of size 0.45 x 0.45 x 0.45 m or(0.50+0.40)/2x(0.50+0.40)/2x 0.45 m4.2.5Hard soil between 30 to 50% boulders |
| 6 | Path for vehicles in hilly areas2000 rmt x 2.00 = 4000 |
| 7 | Construction of Cattle Guard Hut |
| 8 | Earth work in excavation in foundation trenches or drains includingdressing of sides and ramming of bottoms, lift up to 1.5 Mtr. including talking out the excavatedsoil and depositingand refillingof jhiri with watcri ngandrammingand disposal of surplus excavatedsoil as directed within a lead of 50 meter.All kinds uf soil. (Soil ExcavationWork for Foundation of Cattle Guard Hut ) |
| 9 | Brick masonary in foundation and plinth with bricks of class designation 75 mm in ,Cement Mortar 1:6 (1-Cement:6-coarse sand). Brick Massonary Work in Cattle Guard Hut |
| 10 | Plaster on new surface on walls in cement sand mortar 1:4 including racking of joints etc. complete fine finish : 25 mm thick |
| 11 | Providing and laying brick kharanja in lime sand mortar 1:2 in square pattern over roof of ground floor |
| 12 | Distemperingwith dry distemperof approved brand and shade (two or more coats) and of required shade on new work, over and including, primingcoat of whiting to give an even shade includingall scaffolding. (paint Work in cattle guard hut) |
| 13 | Laying of Cement tin sheets on roof including fixing |
| 14 | Construction of Gate Piller |
| 15 | Earth work in excavation in foundation trenches or drains includingdressing of sides and ramming of bottoms, lift up to 1.5 Mtr. including talking out the excavatedsoil and depositing and refilling of jhiri with watcring and rammingand disposal of surplus excavated soil as directed within a lead of 50 meter.All kinds uf soil. (Soil ExcavationWork for Foundation of Gate Piller ) |
| 16 | Brick masonary in foundation and plinth with bricks of class designation 75 mm in ,Cement Mortar 1:6 (1-Cement:6-coarse sand). Brick Massonary Work in Gate Piller |
| 17 | Plaster on new surface on walls in cement sand mortar 1:4 including racking of joints etc. complete fine finish : 25 mm thick |
| 18 | Distemperingwith dry distemper of approved brand and shade (two or more coats) and of required shade on new work, over and including, priming coat of whiting to give an even shade includingall scaffolding. (paint Work in Gate Piller) |
| 19 | Construction of Gate And Sine Board |
| 20 | Plantation gate size.. Height 5feet x width 5.5 feet double leaf gate, gate frame 1.5 x 1.5 inch 2mm thick squre pipe, one horizontal pipe in the middle, GI mess 4 mm with 2 x 2 inch gape on buth side of which a latch has to fitted with colour |
| 21 | Tree plantation sigh board size make a frame of 4 feet x 3 feet using angle iron 35 x 35 x3 mm and fix 18 gauge iron sheet in the middIe of which 8 feet long angle size 35 x35 x 5 mm with holl pass has to be fixed on both sides with colourand write the name of the plantation site in colour along with the year and plan |
| 22 | Construction Of Water Hole |
| 23 | Earth work in excavation in foundation trenches or drains includingdressing of sides and ramming of bottoms, lift up to 1.5 Mtr. including talking out the excavatedsoil and depositing and refilling of jhiri with watcring and rammingand disposal of surplus excavated soil as directed within a lead of 50 meter.All kinds uf soil. (Soil ExcavationWork for Foundation of Gate Piller) (length (1/3x3.14 = 1.04) 1.04x4=4.16 |
| 24 | Providing and laying brick kharanja in lime sand mortar 1:2 in square pattern over roof of ground floor |
| 25 | Providing and laying in position cement concrete including curing compaction etc. of specified grade excluding the cost of centering and shuttering All up to plinth level 1:4:8 (1Cement :4 Course Sand :8 Graded stone aggregate 40 mm nominal size |
| 26 | Plaster on new surface on walls in cement sand mortar 1:4 including racking of joints etc. complete fine finish : 25 mm thick |
| 27 | Providing and Fixing 250 micron Farm Pond lining |