}

Tender For Regular Operation And Maintenance Of Street Light With Material At Ind. Area Hanumangarh Distt. Hanumangarh - Maintenance Of Street Light Fixtures In Industrial Area As Per The Following Terms And Conditions:- 1. At Any Moment, A Minimum Of 90%, hanumangarh-Rajasthan

Rajasthan State Industrial Development And Investment Corporation Limited has published Tender For Regular Operation And Maintenance Of Street Light With Material At Ind. Area Hanumangarh Distt. Hanumangarh - Maintenance Of Street Light Fixtures In Industrial Area As Per The Following Terms And Conditions:- 1. At Any Moment, A Minimum Of 90%. Submission Date for this Tender is 04-01-2025. Street Lighting Tenders in hanumangarh Rajasthan. Bidders can get complete Tender details and download the document.




Tender Notice

46879038
Tender For Regular Operation And Maintenance Of Street Light With Material At Ind. Area Hanumangarh Distt. Hanumangarh - Maintenance Of Street Light Fixtures In Industrial Area As Per The Following Terms And Conditions:- 1. At Any Moment, A Minimum Of 90%
Open Tender
NCB
Rajasthan
Hanumangarh
04-01-2025

Tender Details

Regular Operation And Maintenance Of Street Light With Material At Ind. Area Hanumangarh Distt. Hanumangarh - Maintenance of Street light fixtures in Industrial Area as per the following terms and conditions:- 1. At any moment, a minimum of 90% of total fixture must be in order. The defective fixture must be repaired within 48 hours failing which Rs. 50 per point per day shall be penalized and recovered from the contractor 2. Contractor shall arrange at his cost for put on & off the street light fixture at the appropriate time regularly as per instructions of Engineer-in-charge and in the case of automatic street light controller for on/off process then contractor have to set the time as per season/requirement with the help of skilled electrician 3. A register shall be maintained at RIICO/association office and complaint lodged must be attended by Contractor within 24 Hours. 4. The person deputed by Contractor shall attend the RIICO/Association office daily and comply the instructions and attend complaints regularly 5. Contractor will have to employ trained and qualified electricians for the work. 6. Corporation shall not be responsible for any kind of accident during execution of work. 7. Contractor will be responsible for safety and security of fixtures and all concerned materials handed over to him by the corporation if contractor found irresponsible then penalty should be imposed on contractor otherwise contractor have to arrange all related fixtures/materials etc. at his own cost. 8. Contractor will be responsible for arrangement of all T&P required for the work 9. All material required for the work shall not be below the category – II of concerned BSR item. 10. No extra payment will be made for fixing/removal of extra/existing fixtures in the industrial Area. 11. Tube light fixtures handed over to contractor will have to be maintained by the contractor. No extra payment will be made for fixing/removal of extra/existing fixture in the Industrial Area. 12. Rate to be quoted by the contractor per month for complete maintenance of system. 13. Contractor will be responsible for timely collection & deposition of electric bills of areas in each month. In case of delay in payment and JdVVNL impose surcharge for delay payment the same will be recovered from the Current bill of the contractor. 14. The contractor is required to arrange the suitable capacitor and other necessary equipment for maintaining power factor at his own cost. No extra payment will be allowed for this arrangement. In the case of any power factor surcharge is imposed by JdVVNL in electric bill same will be deducted from the payment of contractor, but in case of power factor incentive, the same will not be given to the contractor. 15. Contractor will be responsible for any theft of electricity through poles and he will make necessary arrangements for this. In case of any theft is found, suitable penalty will be imposed on the contractor. 16.During execution of work penalty imposed by JdVVNL due to theft or any other reason same will be recovered from contractor. 17.In Every 15 days contactor must be joint inspection of street light with corporation authorized officer ,otherwise payment will not done. 18. If work found to be satisfactory then time period may be extend for 3 months & work may be terminated if not found satisfactory by issue a 10 days notice 19. No. of Street light fixture may be increase upto 15 %, for this separate/extra payment will not given to agency/Contractor. 20.Payment is given to contractor bimonthly after providing satisfactory performance certificate from industrialists otherwise payment will not be done. 21. Contractor should have maintained the register for no. of points on/off daily reports and complaints. 22.contractor must have valid registration of main electrical inspector in rajasthan office otherwise he is not eligible for this work. 23. Above all terms and conditions will be applied for Tube lights/LED lights/sodium lights or any other street light fixtures. (A) Tube light fixtures 40 watt 2 Maintenance of Street light fixtures in Industrial Area as per the following terms and conditions:- 1. At any moment, a minimum of 90% of total fixture must be in order. The defective fixture must be repaired within 48 hours failing which Rs. 50 per point per day shall be penalized and recovered from the contractor 2. Contractor shall arrange at his cost for put on & off the street light fixture at the appropriate time regularly as per instructions of Engineer-in-charge and in the case of automatic street light controller for on/off process then contractor have to set the time as per season/requirement with the help of skilled electrician 3. A register shall be maintained at RIICO/association office and complaint lodged must be attended by Contractor within 24 Hours. 4. The person deputed by Contractor shall attend the RIICO/Association office daily and comply the instructions and attend complaints regularly 5. Contractor will have to employ trained and qualified electricians for the work. 6. Corporation shall not be responsible for any kind of accident during execution of work. 7. Contractor will be responsible for safety and security of fixtures and all concerned materials handed over to him by the corporation if contractor found irresponsible then penalty should be imposed on contractor otherwise contractor have to arrange all related fixtures/materials etc. at his own cost. 8. Contractor will be responsible for arrangement of all T&P required for the work 9. All material required for the work shall not be below the category – II of concerned BSR item. 10. No extra payment will be made for fixing/removal of extra/existing fixtures in the industrial Area. 11. Tube light fixtures handed over to contractor will have to be maintained by the contractor. No extra payment will be made for fixing/removal of extra/existing fixture in the Industrial Area. 12. Rate to be quoted by the contractor per month for complete maintenance of system. 13. Contractor will be responsible for timely collection & deposition of electric bills of areas in each month. In case of delay in payment and JdVVNL impose surcharge for delay payment the same will be recovered from the Current bill of the contractor. 14. The contractor is required to arrange the suitable capacitor and other necessary equipment for maintaining power factor at his own cost. No extra payment will be allowed for this arrangement. In the case of any power factor surcharge is imposed by JdVVNL in electric bill same will be deducted from the payment of contractor, but in case of power factor incentive, the same will not be given to the contractor. 15. Contractor will be responsible for any theft of electricity through poles and he will make necessary arrangements for this. In case of any theft is found, suitable penalty will be imposed on the contractor. 16.During execution of work penalty imposed by JdVVNL due to theft or any other reason same will be recovered from contractor. 17.In Every 15 days contactor must be joint inspection of street light with corporation authorized officer ,otherwise payment will not done. 18. If work found to be satisfactory then time period may be extend for 3 months & work may be terminated if not found satisfactory by issue a 10 days notice 19. No. of Street light fixture may be increase upto 15 %, for this separate/extra payment will not given to agency/Contractor. 20.Payment is given to contractor bimonthly after providing satisfactory performance certificate from industrialists otherwise payment will not be done. 21. Contractor should have maintained the register for no. of points on/off daily reports and complaints. 22.contractor must have valid registration of main electrical inspector in rajasthan office otherwise he is not eligible for this work. 23. Above all terms and conditions will be applied for Tube lights/LED lights/sodium lights or any other street light fixtures. ( B ) LED lights Upto 90 Watts

Key Value

Document Fees
INR 1180 /-
EMD
INR 19356.0 /-
Tender Value
INR 9.67 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail