|
| 1 | Earth work in excavation in ordinary swell up to 1.5 and lead up to 30 m including back filling watering and ramming of excavated Earth including supply of all material labour and T&P etc required for proper completion of work columnbeam |
| 2 | Concrete in 1:6:12 with cement fine sand and stone ballast of 4cm gaugeincluding supply of all material labour and T&P etc required for proper completion of work |
| 3 | M-150 bricks work in 1:4 with cement fine sand mortar in foundation including supply of all material labour and T&P etc required for proper completion of work Long wal Short side |
| 4 | M-150 bricks work in 1:4 cement fine sand mortar in foundation including supply of all material labour and T&P etc required for proper completion of work. |
| 5 | RCC work In 1:1.5:3 with cement coarse sand and stone gritt of 2 cm gauge in raft material labour and T&P etc required for proper completion of work. |
| 6 | RCC work in 1:1.5:3 with cement coarse sand and stone gritt of 2 cm gauge in column i/c supply of all material labour and T&P etc required for proper completion of work. |
| 7 | RCC work in 1:1,5:3 with cement coarse sand and stone gritt of 2 cm gauge in raft foundation i/c supply of all material labour and T&P etc required for proper completion of work |
| 8 | RCC work in 1:1.5:3 with cement coarse sand and stone gritt of 2 cm gauge in suspended floor slab i/c supply of all material labour and T&P etc required for proper completion of work. |
| 9 | Supply and fixing of mild steel bars for RCC work and angle for channel including supply of all material labour and T&P etc required for proper completion of work. |
| 10 | 12mm thick plaster in 1:3 with cement coarse sand mortar including supply of all material labour and T&P etc required for proper completion of work. |
| 11 | Mild steel or Iron work such as door & window including supply of all material labour and T&P etc required for proper completion of work. |
| 12 | Applying two coat enaimel paint with priming coat on wood or steel and other metal surface including supply of all material, labour ant T&P etc required for proper completion of work. |
| 13 | Providing wall putty on new surface with approvel quality material of berger/JK/Birla or Similar make 2 coats, including supply of all material, labour ant T&P etc required for proper completion of work. |
| 14 | Providing & Applying water proof cement paint weather at two coat approved brand including supply of all material, labour ant T&P etc required for proper completion of work. |
| 15 | Supply & Fixing 10 CM dia of PVC pipe 6kg/sqcm pressure including supply of all material, labour ant T&P etc required for proper completion of work. |
| 16 | Providing & Fixing Concertina coil fencing with punched tape concertina coil 600mm dia 10 meter openable length including supply of all material, labour ant T&P etc required for proper completion of work. |