Due Date Extended for tenders closing on 31-12-2024.
Admin Corrigendum Date Extend
03-01-2025
Name of Work: CONSTRUCTION OF DRINKING WATER TANK AT YAMBONG UNDER LINGSEY GRAM PANCHAYAT WITHIN PEDONG DEVELOPMENT BLOCK,DISTRICT KALIMPONG.(15th FC Tied 2024-25)
Sl. No.
Item Description
1
PWD(WB)/BUILDINGWORKS/Page-1/Item-2 Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
2
PWD(WB)/BUILDINGWORKS/Page-27/Item-11 Plum Concrete work with 40 % Cement Concrete with 30 mm down graded stone metal and 60% stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.
3
PWD(WB)/BUILDINGWORKS/Page-26/Item-10 Ordinary Cement Concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any in ground floor as per relevant IS Codes.
4
PWD(WB)/BUILDINGWORKS/Page-43/Item-40 Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction.
5
PWD(WB)/BUILDINGWORKS/Page-42/Item-36 Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor).
6
PWD(WB)/BUILDINGWORKS/Page-189/Item-1 Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners asdirected and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor). [Excluding cost of chipping over concrete surface].
7
PWD(WB)/BUILDINGWORKS/Page-192/Item-15 Neat cement punning about 1.5mm thick in wall, dado, windowsill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m.
8
PWD(WB)/SANITARY AND PLUMBING WORKS/Page-16/Item-20 Supply of High Density Poly-ethylene Pipe conforming to IS-4984-1985 (Dia)[PE-63].
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.