|
| 1 | Dismentling of old damaged B.O.E sokling/interlocking tiles and stacking of dismantled materials as directed by E/I |
| 2 | Dismentling of cement concrete or brick or granulathic floor,including base concreteand stacking of dismantled materials as directed by E/I |
| 3 | Dismentling of old damaged brick work and stone work i/cstacking of dismantled materials as directed by E/I |
| 4 | Cartage of surplus malwa upto 5km |
| 5 | Earthwork in cutting or in embankment in ordinary soil,excavation to be in the regular pits not exceefing 0.5m in depth and earth work in embankment |
| 6 | Providing and laying cement concrete in 1:6:12(1 cement\:6 Fine sand:12 Brick ballast 40mm gauge) and curing complete |
| 7 | First class brick work in 1:4 cement C\"sand mortor in F/P including supply of all materials labour T&P etc |
| 8 | 12mm thick plaster in 1:5 cement & C\"sand mortor over brick work minimum thickness not less then 10mm |
| 9 | Providing and laying cement concrete in 4:2:1 of not less then strength of M-150 stone ballast (20mm nominal size) |
| 10 | RCC 1:2:4 with cement c\"sand stone grit of 20mm gauge in slab of culvert excluding supply of reinforcement with its bending |
| 11 | Mild steel or iron for plain work such as reinforced concrete brought to proper shape as necessary |
| 12 | P/L of granular sab base with coarse graded materials (Table 400-2) in granular sub base by providing coare graded materials,spreading in uniform layer |
| 13 | Providing and laying cement concrete road slab consisting of 1:2:4 cement coarse sand & approved 4cm auagebstone ballast over prepared |
| 14 | Deduction cost of brick bats |
| 15 | Deduction cost of bricks |
| 16 | Dismentling of old damaged B.O.E sokling/interlocking tiles and stacking of dismantled materials as directed by E/I |
| 17 | Dismentling of cement concrete or brick or granulathic floor,including base concreteand stacking of dismantled materials as directed by E/I |
| 18 | Dismentling of old damaged brick work and stone work i/cstacking of dismantled materials as directed by E/I |
| 19 | Cartage of surplus malwa upto 5km |
| 20 | Earthwork in cutting or in embankment in ordinary soil,excavation to be in the regular pits not exceefing 0.5m in depth and earth work in embankment |
| 21 | Providing and laying cement concrete in 1:6:12(1 cement\:6 Fine sand:12 Brick ballast 40mm gauge) and curing complete |
| 22 | First class brick work in 1:4 cement C\"sand mortor in F/P including supply of all materials labour T&P etc |
| 23 | 12mm thick plaster in 1:5 cement & C\"sand mortor over brick work minimum thickness not less then 10mm |
| 24 | Providing and laying cement concrete in 4:2:1 of not less then strength of M-150 stone ballast (20mm nominal size) |
| 25 | RCC 1:2:4 with cement c\"sand stone grit of 20mm gauge in slab of culvert excluding supply of reinforcement with its bending |
| 26 | Mild steel or iron for plain work such as reinforced concrete brought to proper shape as necessary |
| 27 | P/L of granular sab base with coarse graded materials (Table 400-2) in granular sub base by providing coare graded materials,spreading in uniform layer |
| 28 | Providing and laying cement concrete road slab consisting of 1:2:4 cement coarse sand & approved 4cm auagebstone ballast over prepared |
| 29 | Deduction cost of brick bats |
| 30 | Deduction cost of bricks |
| 31 | Excavation in foundation in ordinary soil (Loam,clay or sand) including,lift upto 1.50 m and lead upto 30m |
| 32 | Supply of earth work for cutting or in embankment to be in ordinary soil |
| 33 | Providing and laying cement concrete in 1:6:12(1 cement\:6 Fine sand:12 Brick ballast 40mm gauge) and curing complete |
| 34 | First class brick work in 1:4 cement C\"sand mortor in F/P including supply of all materials labour T&P etc |
| 35 | 12mm thick plaster in 1:5 cement & C\"sand mortor over brick work minimum thickness not less then 10mm |
| 36 | Providing and laying cement concrete in 4:2:1 of not less then strength of M-150 stone ballast (20mm nominal size) |
| 37 | RCC 1:2:4 with cement c\"sand stone grit of 20mm gauge in slab of culvert excluding supply of reinforcement with its bending |
| 38 | Mild steel or iron for plain work such as reinforced concrete brought to proper shape as necessary |
| 39 | P/L of granular sab base with coarse graded materials (Table 400-2) in granular sub base by providing coare graded materials,spreading in uniform layer |
| 40 | Providing and laying cement concrete road slab consisting of 1:2:4 cement coarse sand & approved 4cm auagebstone ballast over prepared |
| 41 | Dismentling of old damaged brick work and stone work i/cstacking of dismantled materials as directed by E/I |
| 42 | Deduction cost of brick bats |
| 43 | Deduction cost of bricks |
| 44 | Dismentling of old damaged B.O.E sokling/interlocking tiles and stacking of dismantled materials as directed by E/I |
| 45 | Supply of earth work for cutting or in embankment to be in ordinary soil |
| 46 | Providing and laying cement concrete in 1:6:12(1 cement\:6 Fine sand:12 Brick ballast 40mm gauge) and curing complete |
| 47 | First class brick work in 1:4 cement C\"sand mortor in F/P including supply of all materials labour T&P etc |
| 48 | 12mm thick plaster in 1:5 cement & C\"sand mortor over brick work minimum thickness not less then 10mm |
| 49 | Providing and laying cement concrete in 4:2:1 of not less then strength of M-150 stone ballast (20mm nominal size) |
| 50 | RCC 1:2:4 with cement c\"sand stone grit of 20mm gauge in slab of culvert excluding supply of reinforcement with its bending |
| 51 | Mild steel or iron for plain work such as reinforced concrete brought to proper shape as necessary |
| 52 | P/L of granular sab base with coarse graded materials (Table 400-2) in granular sub base by providing coare graded materials,spreading in uniform layer |
| 53 | Providing and laying cement concrete road slab consisting of 1:2:4 cement coarse sand & approved 4cm auagebstone ballast over prepared |