| 1 | Cutting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. |
| 2 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . upto 3 m depth, (i) With pumping out water excluding shoring as required. |
| 3 | Earthwork in closing ghoges in embankments including cutting, filling,puddling with water and ramming including all leads and lifts, if necessary. |
| 4 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of (B )Beyond 1.00 km and upto 2.00 km.NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking. |
| 5 | Supplying to siteempty cement polythene bags (Capacity 50 Kg.) in goodcondition including stackingincedentalcharge etc. all complete. (Capacity 50 Kg.). |
| 6 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in |
| 7 | Dumping in position earth / sand filled gunny / poly bags (capacity 50kg) within a lead of 30 metre inclusive of all lifts |
| 8 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (ii ) River Bazree |
| 9 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).(f) 25 mm to 30 mm shuttering without staging in foundation. |
| 10 | “Cast-in-situ cement concrete blocks or lining units as per designed size and specification, with well graded stone metal aggregate, laid in position by casting in alternative panels or otherwise to keep a gap of 12mm between the adjacent units, over a layer of polythene sheet of thickness not less than 100 to act as a separator between the bottom surface of the block and the filter material laid below the blocks, including dressing, ramming, shuttering, finishing the exposed surface with 1:3 cement and sand mortar, curing and filling the gaps between the adjacent units by 5.6mm down coarse aggregate to be compacted properly, with all leads and lifts including supply and carriage of all materials, complete, without the cost of filter.(The rate is exclusive of the cost of stone aggregate and its carriage upto site. Construction wing has to add the cost of same from the SoR of PW (Roads) to derive the consolidated rate. Consumption chart of the USoR may be used for assessing the quantity of coarse aggregates per cum of concrete). With Stone aggregatesl (Pakur, North Bengal or Rajmahal varieties) c) Nominal Mix. 1:1.5:3 with 20 mm down coarse aggregate |