ELECTRIFICATION AGAINST SANCTIONED ESTIMATE/PACKAGE NO. 01, 02, 04, 05, 06, 07, 08, 09, 12, 14, 15/2024-25 AND104, 105, 106, 107, 108, 109, 110, 111, 112, 113, 114, 115, 116, 117, 118, 119, 120, 121, 122, 123, 124, 125, 126, 127, 128, 129, 130, 132, 133, 134, 135, 136, 137, 138, 139, 140, 141, 142, 143/2023-24 UNDER FULL DEPOSIT UNDER EDD-II, MAINPURI. - Safe carriage of ST/PCC Pole 11/8.5 Mtr. Long from ESC, Mainpuri to Pit site of work including loading and unloading at both ends. Distance Approx 15 km to 50 km. 2 Safe carriage of small line material from ESC, Mainpuri to Pit site of work including loading and unloading at both ends. Distance Approx 15 km to 50 km. 3 Erection of 11/8.5 Mtr. Long ST/PCC Poles by excavation of earth 1.5 mtr. deep and backfilling properly. 4 Grouting of ST/PCC Pole with Cement, Sand and Stone Ballast in ratio 1:4:8 including cost of material i.e. Cement, Sand and Stone Ballast as per actual site requirement. 5 Erection and grouting of stay in CC ratio 1:4:8 of Cement, Sand and Stone Ballast including cost of grouting material with nozelling and binding of stay wire (Complete work) 6 Laying of ACSR Weasel/Dog for construction of HT/LT Lines including stringing and sagging nozelling and binding conductor with insulator. 7 Fixing of 11KV cross arm with Clamps, Nut & Bolts. 8 Fixing of 11KV F, E Clamps With Nut and bolt 9 Fixing of 11KV Pin Insulator with Pin etc. 10 Fixing of 11KV Disc insulator with fitting. 11 Earthing of ST Poles / PCC POLE by using 2.5 meter long earth rod where ever required. 12 Safe carriage of 16 KVA/25KVA/63KVA transformer from ESC Mainpuri including loading and unloading at both ends, average Distance Approx 15 km to 50 km. 13 16 KVA Transformer 14 25KVA Transformer 15 63KVA Transformer 16 Mounting of 16 KVA/25KVA/63KVA Transformer on Single Pole/Double Pole with all respective material (As per RESPO Schedule) etc. 17 16 KVA Transformer 18 25KVA Transformer 19 63KVA Transformer 20 Providing and Fixing of LT PVC ALLUMINIUM CABLE 4X16/25 SQ.MM. 21 Laying of LT ABC CABLE (3X50+1X35+1X16) SQ.MM. 22 Fixing of single phase=7 NOS / Three Phase=6 NOS. Distribution Box with Clamp as per estimate. 23 Providing & Fixing of Different size Clamps with Nut and Bolts. 24 Providing & Fixing of Suspension Clamps & Eye Hook . 25 Providing & Fixing of Dead End Clamps. 26 Fixing of T-Channel with nut and bolts 27 Providing and Fixing EYE Bolts for Guard wire 28 Providing and Fixing Danger Board with Clamp 29 Providing and Fixing BARBED WIRE 30 Providing and Fixing STONE PAD 300X300X75 CM