Tender For Maintenance Dredging Of Navigation Channel At Mora/2024-25/No.09
Tender Overview
Project Description
Tender For maintenance Dredging Of Navigation Channel At Mora/2024-25/No.09-Maintenance dredging at the navigation channel of Mora by suitable dredging equipment, to dredge a navigation channel of Mora Channel Area (L-1,265mtr X W-50mtr, Depth-2.0 mtr) at specified area, along with slope of 1:4 & tolerance 0.3m as mentioned in hydrographic chart No 2384 / 2024. The quantity 96,980 cum. The dredger should be capable of dredging all type of soils, silt marine soft/stiff clay loose boulders, pebbles etc. in fair weather.The cost should include all lifts and leads conveying and deposition of the same over dumping area located at an average distance of approx.36.44 Km in deep sea.This further includes all necessary arrangements of crew, fuel oil, tools, plants, equipment, machinery and labor along with accessories assembling, mobilizing & demobilizing all plant and equipment required with cost of pre and post dredging survey, monthly hydrographic survey etc. to the complete satisfaction of the Marine Engineer & Chief Surveyor, MMB. 2 Per Cubic Meter Rate (Exclusive of GST)
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 02-Jan-2025 | Corrigendum1 | Technical Bid | 13-Jan-2025 |
BOQ
| Sl. No. | Item Description |
| 1 | Item No.1 -: Maintenance dredging at the navigation channel of Mora by suitable dredging equipment, to dredge a navigation channel of Mora Channel Area (L-1,265mtr X W-50mtr, Depth-2.0 mtr) at specified area, along with slope of 1:4 & tolerance 0.3m as mentioned in hydrographic chart No 2384 / 2024. The quantity 96,980 cum. The dredger should be capable of dredging all type of soils, silt marine soft/stiff clay loose boulders, pebbles etc. in fair weather.The cost should include all lifts and leads conveying and deposition of the same over dumping area located at an average distance of approx.36.44 Km in deep sea.This further includes all necessary arrangements of crew, fuel oil, tools, plants, equipment, machinery and labor along with accessories assembling, mobilizing & demobilizing all plant and equipment required with cost of pre and post dredging survey, monthly hydrographic survey etc. to the complete satisfaction of the Marine Engineer & Chief Surveyor, MMB. |
| 2 | Per Cubic Meter Rate (Exclusive of GST) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender