| 1 | Safe carriage of following material from ESC Daliganj/Chinhut to JE Dump store including loading unloading after proper stacking of material |
| 2 | Line material |
| 3 | ST pole 11/9 Mtr |
| 4 | PCC Pole 8.5 Mtr |
| 5 | 11/0.4 25/63/100 KV T/F KVA |
| 6 | 11/0.4KV 250/400KVA T/F |
| 7 | 11KV XLPE Cable |
| 8 | LT Cable 1x630/400/240/3.5x240/400mmsq |
| 9 | ACSR Rabbit/dog/Racoon/Weasel conductor |
| 10 | ABC Cable 3x120/95/50/25sqmm |
| 11 | 11KV Pilfer resistance metering cubical |
| 12 | 11KV Pole mounted CT/PT |
| 13 | Safe carriage offollowing material from JE Dump store to site including loading unloading |
| 14 | 11/9/ ST /8.5 Mtr Long PCC Pole |
| 15 | 11/0.4 25/63/100 KV T/F KVA |
| 16 | 11/0.4KV 250/400KVA T/F |
| 17 | 11KV XLPE Cable |
| 18 | LT Cable 1x630/400/240/3.5x240/400mmsq |
| 19 | ACSR Rabbit/dog/Racoon/Weasel conductor |
| 20 | ABC Cable 3x120/95/50/25sqmm |
| 21 | 11KV Pilfer resistance metering cubical |
| 22 | 11KV Pole mounted CT/PT |
| 23 | Fabrication erection of substation type double pole on ST pole along with fixing of necessary clamp ,accessories required including supply and fixing of MS channel on top dropperwith arrangement of fixing of 3 Nos pin insulator as per RESPO specification. |
| 24 | Erection and grouting of 9/11 mtr long St pole with fixing of necessary items, Such as V-type X-arm,F-bracket,11KV Pin/Dic insulator, guarding angle with nut and bolt its ramming as per RESPO Specification. |
| 25 | Prepare proper space for construction of Plinth. |
| 26 | Construction of T/F plinth of size 2x2x1.2 Mtr with first class bricks and massonary work in the ratio 1:4cement and course sand with RCC Top 1:2:2 cement sand and course sand stone grit with MS bar and MS channel for resting of T/F. |
| 27 | Fabrication and fixing of wiremesh fenci-ng of 11/0.4KV S/S made as per require-ment 3mtr height 45x45x5 mm angle frame and 1 No horizontal runner by 40x5 mm MS flat then welding of wiremeshon it50x25mm made of 12 SWG ,diagonal bracing of all the frame panel welded with MS flat 25x3mm support,groutin properly by cement concrete and course sand. |
| 28 | Painting of wiremesh Fencing with 2 coat of red oxide and 2 coat of enamel Paint. |
| 29 | Fabrication and fixing of DP box stand made of MS Angle ,grouting and plinthing of the same all material provided by contractor. |
| 30 | Fabrication and fixing of Metalic Distribution Pillar boxon stand with Nut bolt made of 20 SWG BP Sheet with door 18 SWG BP Sheet ,with fixing of 2 Nos MS Angle for mounting of Fuse unit. |
| 31 | Fabrication and fixing of Henlay type Tailless Fuse Unit 500 Amp 650 Volts. |
| 32 | Fabrication and Fixing ofElectrolytic copper Bus bar of Size 50x6x750mm. |
| 33 | Fabrication and Fixing ofAluminumBus bar of Size 50x10x750mm. |
| 34 | Chemical type earthing by digging of pit fixing of electrode earthing rod filling of Bentonite powder around the rod and water ,connect the GI Strip 32x5 mm with wiremesh fencing and DP Box. |
| 35 | Digging of pit erectionof 8.5 Mtr Long PCC pole with fixing of necessary items, such as v-type X–arm,F-bracket, 11KV Pin/Dic insulator guard angle as per RESPO refilling of earth and proper ramming of earth. |
| 36 | Providing and fixing of 11KV DO Fuse set alont with clamp and nut bolt. |
| 37 | Laying of 11 KV cable3 x/3570/120/185 sqmm in pukka road by drilling method. |
| 38 | Laying of 11 KV cable3 x/3570/120/185 sqmm in pukka road/kucch Road by digging of trench upto 1 Mtr Deep 0.6 Mtr width laying of cable boxing with bricks and sand ,refilling of earth and proper ramming. |
| 39 | Hoisting of11KV cable will be passed throughGI pipe required size dulyclamped with pole at the bottom ,middle and top of the pole all material provided by contractor. |
| 40 | High pressure testing of 11KV Cable by high pressure equipment. |
| 41 | Proper Jumpering of 11KV Cable on tapping point. |
| 42 | Laying of LT Cablefrom T/F to DP Box and DP Box to LT Line pole. |
| 43 | Hoisting ofLT cable will be passed throughGI pipe required size dulyclamped with pole at the bottom ,middle and top of the pole only cable supplied by department. |
| 44 | Proper Jumpering with existing LT Line with PVC Cable and Al Lugs. |
| 45 | Erection and commissioning of AB Conductor of size 3x120/95/50/25sqmm. |
| 46 | Laying stringing and sagging of 3Phase 3 wire 11KV line on ACSR Weasel/Rabbit /Racoon /Dog conductor as per RESPO Specification. |
| 47 | Ordinary Earthing by MS Earth rod2500 mm long all material provided by department. |
| 48 | Grouting binding nuzzling of stay set complete including fixing of necessary clamps accessories stay set and stay wire provided by department. |
| 49 | Installation of 11KV CT/PT on double pole connected with metering unit along with providing and fixing of all accessories such as S/S base, MS Flat, clamps, nut and bolts. |
| 50 | Proper jumpering of 11KV Incoming and outgoing Cable with Pole Mounted unit. |
| 51 | Dragging of pilfer metering cubical inside the metering room its installation and commissioning. |
| 52 | Earthingof Pipe type with 60 feet deep boring and providing jindal make pipe \"B\" class 1\" dia and GI strip 25x5 6mtr long attached with clamps and GI pipe. |
| 53 | Safe installation of 11/0.4 25/63/100KV T/F on double pole by providing and fixing of all accessories. |
| 54 | Making HT/LT Connection with suitable size of Al Lugs Copper L-Piece. |
| 55 | Installation and commissioning of 250/400KVA T/F on plinth connect earthing with T/F Body and neutral. |
| 56 | Fabrication of LT Bus bar and fixing on consumer premises. |
| 57 | Fabrication and fixing of 11KV TPMO Set. |
| 58 | Fabrication and fixing of HT Cable stand with the help of 65x65x6mm MS angle 3.5 mtr high above ground level and grouting properly. |
| 59 | Dismantling of 11KV/LT line from existing pole and disconnect all the cables. |
| 60 | Dismantling of of all the fitting fromFour Pole. |
| 61 | Dismantling of of all the fitting from Double Pole. |
| 62 | Dismantling of of all the fitting from Pole. |
| 63 | Dismantling of ST/PCC/Rail pole and its carriage back to JEDump store. |
| 64 | Dismantling of Transformer 25/63/100KVA from double pole and its carriage upto JE Dump store. |
| 65 | Dismantling of Transformer 250/400/630KVA from double pole and its carriage upto JE Dump store. |
| 66 | Groutingof pole by cement course sand and stone grit. |
| 67 | Painting of ST pole by Al paint and post office red paint. |
| 68 | Plinthing of ST Pole by cement stone grit and course sand. |
| 69 | Supply and fixing of 2.5mm Multistr and PVC Copper wire. |
| 70 | Cutting of tree Branches for clearance of line. |
| 71 | Supply and fixing of Interlocking Tiles at LT S/S Fenced area. |
| 72 | GST will be paid extra as per rule. |