| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to1.5 m. |
| 3 | Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stoneaggregate 20 mm nominal size) cum |
| 8 | Structuralsteelworkriveted,boltedorweldedinbuiltupsections including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 9 | Welding by gas or electric plant including transportation of plant at site etc. complete |
| 10 | Hydraulic Excavator (3D) with driver and fuel |
| 11 | Hire and Running charges of crane 20 ton capacity |
| 12 | Hire and Running charges of tipper |
| 13 | Beldar as per DLC, Pipri minimum wages |
| 14 | Trimming of branches of trees of different type of species standing in colony area using Hydra, expert labours, Saw, Rope, Axe and other T&P\"s required for completion of work including all safety majours for the workers and stacking of branches of trees properly as per the direction of Engineer-in-charge. Work also including cleaning the site of debris and remain the trees. |
| 15 | Clearing jungle including uprooting of rank vegetation, grass, brush wood,trees and saplings of girth up to 30 cm measured at a height of 1 mabove ground level and removal of rubbish up to a distance of 50 moutside the periphery of the area cleared. |
| 16 | Felling trees of the girth (measured at a height of 1 m above ground Level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 30 cm girth upto and including 60 cm girth |
| 17 | Felling trees of the girth (measured at a height of 1 m above ground Level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable materialBeyond 60 cm girth upto and including 120 cm girth |
| 18 | Felling trees of the girth (measured at a height of 1 m above ground Level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable materialbeyond 120 cm girth upto and including 240 cm girth |
| 19 | Lettering with black Japan paint of approved brand and manufacture |
| 20 | Painting with synthetic enamel paint of approved brand andmanufacture of required colour to give an even shade : Two or more coats on new work over an under coat ofsuitable shade with ordinary paint of approved brand andmanufacture |
| 21 | Applying priming coatWith ready mixed red oxide zinc chromate primer ofapproved brand and manufacture on steel galvanised iron/steel works |
| 22 | Structural steel work in single section, fixed with or without connecting plate,including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.(Steel should be Provid by department free of cost) |