| 1 | Part-A Carrage of Centralized material from store, Gorakhpur to work Site. |
| 2 | PCC Pole 8.5 Meter |
| 3 | STPPole 9 & 11 Meter |
| 4 | ACSR Weasel Conductor |
| 5 | ACSR Dog counductor |
| 6 | Carriage of 25 kva T/F |
| 7 | Carriage of 63 kva T/F |
| 8 | LT PVC cable |
| 9 | 3x70 sq.mm XLP cable |
| 10 | L.T. pvc cable 3.5x70/35 sq. mm |
| 11 | 11 Kv ct/pt unit ctr 5/5 Amp |
| 12 | Other Materials |
| 13 | Part-B Supply of Decentralized Material Provvided by contractor. |
| 14 | 11 KV V-Type X-arm Clamp |
| 15 | 33 KV V-Type X-arm Clamp |
| 16 | F-Bracket |
| 17 | F-Bracket 33 kv |
| 18 | T-off Channel |
| 19 | Dropper channel |
| 20 | TOP channel |
| 21 | T-off Channel clampe |
| 22 | Dropper channel clampe |
| 23 | TOP channel clamp |
| 24 | L.T. Clamp |
| 25 | L.T. Sehackkle insulator |
| 26 | Bolts, Nuts & Washers |
| 27 | S.S. base |
| 28 | Graurding X arm |
| 29 | Graurding X arm clam |
| 30 | Loop insulator |
| 31 | Erection work at different 02 No. Nalkup & 02 No. Vidhyek Nidhi |
| 32 | Erection of Single pole structure on 09 & 8.5 Mtr pcc pole for 11 kv line & L.T. Line, including all work of evocation of pit, pole erection, making plinth for pole 30 cm above, groution in the ratio 1:4:8 (cement, sand, 40 mm brick ballast) back filling of earth, proper rammin g & fitting of all accessories (V type cross arm 65x65 mm, clamps with bolt and nut, composite polymer pin insulator, danger board with clamp, barbed wire earthing etc. complete work) |
| 33 | Erection of Single pole structure on 09 & 11 Mtr ST pole (SP-55) Pole for 11 kv line & L.T. Line, including all work of evocation of pit, pole erection, making plinth for pole 30 cm above, groution in the ratio 1:4:8 (cement, sand, 40 mm brick ballast) back filling of earth, proper rammin g & fitting of all accessories (V type cross arm 65x65 mm, clamps with bolt and nut, composite polymer pin insulator, danger board with clamp, barbed wire earthing etc. complete work) |
| 34 | Erection of Double pole structure on 8-5 Mtr PCC for 11 kv line, including all work of evocation of pit, pole erection, making plinth for pole 30 cm above, groution in the ratio 1:4:8 (cement, sand, 40 mm brick ballast) back filling of earth, proper rammin g & fitting of all accessories (V type cross arm 65x65 mm, clamps with bolt and nut, composite polymer pin insulator, danger board with clamp, barbed wire earthing etc. complete work) |
| 35 | Erection of Double pole structure on 9-11 STP Mtr for 11 kv line, including all work of evocation of pit, pole erection, making plinth for pole 30 cm above, groution in the ratio 1:4:8 (cement, sand, 40 mm brick ballast) back filling of earth, proper rammin g & fitting of all accessories (V type cross arm 65x65 mm, clamps with bolt and nut, composite polymer pin insulator, danger board with clamp, barbed wire earthing etc. complete work) |
| 36 | Grouting of Pole |
| 37 | Erection of 25 kva T/f from ESD Gorakhpur to work site |
| 38 | Erection of 63 kva T/f from ESD Gorakhpur to work site |
| 39 | Earthing of pole |
| 40 | Double Earthing of D/T |
| 41 | Laying sagging, Stringingand binding of ht line(a) HT line 3 phase 3 wire |
| 42 | (b) LT line 3 phase 4 wire |
| 43 | Grouting of Stay rods (20x1800)/ (20x1600) mmIncluding all work of Excavation, Cment Concrete in size (0.60 x 0.60 x0.30) m in ratio 1:4:8 cement, sand 40mm brick ballst) as per drg including back filling, proper ramming etc. Fixing tightenting & nozzling of stay rod with the poles of required tension as per drawing. |
| 44 | Eraction Charge of LT PVC Cable connect of D/T to H.T line |
| 45 | Guarding between two poles like single poles, double poles, four poles, etc. to guard LT, 11 KV line Telephone and river crossing, road crossing etc. with G.I wire no. 6 SWG and G.I wire no 8 SWG cutting fabrication and fixing of guarding channel 75 x40 x3010 mm with clamps nut &bolts. etc. as per drawing. |
| 46 | Plienth of ST Pole 09 & 11 Mtr. |
| 47 | Painting of ST Pole 09 & 11 Mtr. |
| 48 | Laying of Cable (3x70 sq. mm.) |
| 49 | Disconnection and Reconnection of Consumer cable connection in the path of Shifting of line as per following details |
| 50 | L.T. and Domestic Consumer Connection |
| 51 | Commercial and Power Consumer Connection |