Supply Of Goods Materials To Gp Devalingekoppa - Gpdvk -Mixer (Concrete) - 1 Cum Capacity (Rent Basis).,Gpdvk -Mixer (Concrete Small Used In Culvert) (Rent Basis).,Gpdvk -Hom Of Vibrator 0.71 Days (Rent Basis).,Gpdvk -Brick.,Gpdvk -Tmt Bars Fe 500.,Gpdvk -Size Stone 20 X 20 X 25 Cms.,Gpdvk -Silver Oak Or Equivalent Planks 38 Mm Thick.,Gpdvk -Rubble Stones.,Gpdvk -Jungle Wood Runners And Planks.,Gpdvk -Casurina Poles 75 - 100 Mm Dia.,Gpdvk -Casurina Poles 100 - 150 Mm.,Gpdvk -Broken Stone Aggregate 40 Mm Size.,Gpdvk -Broken Stone Aggregate 20 Mm Size.,Gpdvk -Broken Stone Aggregate 12 Mm To 10 Mm Size.,Gpdvk -Boulders.,Gpdvk -Bond Stone 20 X 20 X 45 Cm.,Gpdvk -Coarse Sand (Zone Iii).,Gpdvk -Water Proofing Cement Paint.,Gpdvk -Binding Wire.,Gpdvk -Plasticizer / Super Plasticizer.,Gpdvk -Portland Cement.,Gpdvk -Water Tanker (Rent Basis),Gpdvk -Vibratory Roller 8 Tonne (Rent Basis),Gpdvk -Motor Grader 3.35 Meter Blade (Rent Basis),Gpdvk -Wheeled Dozer (D50 Beml) (Rent Basis),Gpdvk -Mixer (Concrete) - 1 Cum Capacity (Rent Basis),Gpdvk -Mixer (Concrete Small Used In Culvert) (Rent Basis),Gpdvk -Tractor With Trolley (Rent Basis),Gpdvk -Coarse Sand (Zone Iii),Gpdvk -Portland Cement,Gpdvk -Rcc Pipes Np2 900 Mm Dia Including Collars,Gpdvk -Stone Chips At Quarry,Gpdvk -Pin Headers At 2 Per Sqm,Gpdvk -Uncoursed Rubble Stones,Gpdvk -Stone At Quarry,Gpdvk -Add For Scaffolding At 5 Per Cent Of Cost Of Labour And Material,Gpdvk -Gravel 2.36 Mm/Murrum,Gpdvk -Broken Stone Aggregate 40 Mm Size,Gpdvk -Broken Stone Aggregate 20 Mm Size,Gpdvk -Broken Stone Aggregate 12 Mm To 10 Mm Size,Gpdvk -Bond Stone 20 X 20 X 45 Cm