| 1 | Cleaning Jungle including uprooting of rank vegetation grass, bush, wood trees and saplings of girth upto 30 cm measured at a height of 1 metre above ground level & removal of rubbish upto a distance of 50 metres outside the periphery of area cleared. AS per SOR Item 259. |
| 2 | Construction of embankment/Patri with approved material obtained from borrow pits with all lifts and all leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Ref. to Mort&H) |
| 3 | Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. As per ReferencetoMORT&H Specification 2504 SN.15.50 Rates are including all labour, material, T&P, taxes & labour cess but excludi |
| 4 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications.As per ReferencetoMORT&H Specification2504 SN. 1540 Rates are i |
| 5 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with |
| 6 | Cement concrete with 4 cm gauge approved stone ballast approved coarse sand cement in the proportion of 8:4:1 including supply of all material T&P etc. required for proper completion of work. |
| 7 | Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. |
| 8 | 12 mm thick plasterwith cement and approved coarse sand in 1:3 over brick work minimum thickness not to be less than 3/8\" (10 mm) thick including supply of all materials, labour and T&P etc. required for proper completion of the work. |
| 9 | Cement concrete with 2 cm. (gauge approved stone, ballast, approved coarse sand and cement in the proportionof 4:2:1 including supply of all materials, labour and T&P etc. required for proper completion of the work.279A |
| 10 | Brick soling with strainght over burnt bricks laid flat and dry with brick edging on both sides including preparation of subgrade to prescribed camber and including supply of bricks, filling joints with local earth of P.I. 5 to 7, spreading blinding coat 1 cm (3/8\") depth of local earth over the entire surface and including supply of all materials, labour Tools & Plants etc. required for proper completion of the work. |
| 11 | Providing and erecting a \"W\" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810 |
| 12 | Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm. As per ReferencetoMORT&H Specification 800 Rates |