| 1 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by thedepartmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. |
| 2 | Supplying and filling in foundation, basement, etc with filling sand / M sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 3 | Cement Concrete 1:5:10 (One Cement, Five sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundationincluding dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification |
| 4 | Brick work in following Cement Mortar using Fly Ash Bricks of 230 x 110 x 75mm size conforming to IS: 12894-1989 Class designation not less 50 kg./ sq.cm. average compressive strength in cement mortar 1:5 for load bearing structures for foundation and basement and for superstructure including curing, etc., complete complying with standard specification. |
| 5 | For foundation & basement |
| 6 | Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. |
| 7 | Renewing the damagedpaver block with new one of paving and layingthe rubber moulded hydraulic presses paver block inter locked blocks with new one of 63mm thick inter locked blocks of approved quality and make over a sand cushion and laying the paver blocks in true and straight alignment with gradient and pointing neatly using quarry dust of fly ash and pointing neatly hire charges for vibrator machine including diesel consumption charges etc., completecomplying with standard specifications and as directed by the departmentalofficers. |
| 8 | Supplying and fixing Mild Steel Grills for windows and ventilators etc., including the cost of mild steel angles, plates, rods, cost of welding charges and one coat of priming coat etc., complete.(The design should be got approved by the departmental officers.) |
| 9 | Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of following thickness in RCC 1:2:4 (one cement, two sand and four aggregates), 150mm thick slab (using 20mm HBGS Jelly) including cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed by the departmental officers |
| 10 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 11 | Total in Figures |