| 1 | Clearing heavy jungle for surveying including cost of all materials, leads, lifts etc., complete. |
| 2 | Supply, Transport & erection of missing tower parts including tack welding of bolts & nuts, supply of zinc rich primer, enamel paint and application of one coat of zinc rich primer and two coats of zinc rich enamel paint over the welded portion as per technical specification and as directed by the Engineer including cost of GI angle, labour, lead, lift, etc. complete. |
| 3 | Providing of pipe type earthing to towers including cost of GI pipe, earthwire, excavation, labour, lead, lift, etc, complete. |
| 4 | Danger Plate |
| 5 | Number Plate |
| 6 | Phase Plate (set of three) |
| 7 | Circuit plate (set of three) |
| 8 | Supply of OPGW cable, Labour charges for Installation & stringing of 1 No. OPGW 48 Fibre excluding cost of OPG cable, fixing of hardware fittings and accessories etc., complete for the line (Stringing of OPGW is to be done using tension stringing equipment) |
| 9 | Final checking of towers, conductors, OPGW & earth wire and accessories as per standard specification and providing necessary vehicle arrangements, man power, T&P\"s for TANTRANSCO officials before commissioning of the line. |
| 10 | Arranging and awailing shutdown, lowering of LT/HT line during stringing workj and restringing the same to original position including all labour charges, lead and lift etc., complete in all respects. |
| 11 | Providing special type trustles for P&T, road crossing during stringing work with casurina props so as to avoid accident and damages to conductor and earth wire on both sides of the crossings including cost of all materials, lead and lift etc., complete in all respects. |
| 12 | Labour charges for laying, erection of ADSS 24 fibre OPTIC cable as per IS specification approved make including the cost of HDPE pipe and all accessories, labour charges, transport, labour, lead, lift etc., complete. |
| 13 | PCC 1:2:4 using 12 to 20mm HBG metal and top plastering with CM 1:3, 12mm thick for muffing and coping including cost of all materials labour, curing form work plastering all lead lift etc., complete. |
| 14 | Cleaning the tower legs and painting with anti corrosive black paint, 2 coats to the tower legs 1.00m above coping concrete including bracings, including cost of paint labour, charges, lead and lift etc., complete - 1 location. |
| 15 | GST for bidders within TamilNadu |
| 16 | SGST |
| 17 | CGST |
| 18 | GST for bidders outside TamilNadu (IGST) |